8x8 Shed Material List: Lumber, Sheets and Hardware

8x8 material list: gable shed, lumber, sheets, hardware

For an 8×8 gable shed on skids, the main items on the 8×8 shed material list are 68 framing 2x4s (89 with braces, stakes and cleats), 9 treated 2x6s, 3 treated 4x4s, 2 sheets of 3/4 in plywood, 5 of OSB, 11 of T1-11 and 4 shingle bundles, for 94 1/2 in walls and a 6/12 roof.

Every quantity and cut length here comes from the shopping list, cut list and cutting plan in the 3DSHEDPLANS 8×8 gable shed plan PDF. That plan ends with a table of 108 checks on its measurements, such as rafter span, header depth and sheet coverage. This page is a shopping aid, not a stamped engineering drawing. The list matches the plan line for line: one 60 in double door, two 24 x 36 in windows and a detachable ramp.

What this 8×8 shed material list assumes

The plan is a gable shed 8 ft deep and 8 ft wide, 64 sq ft of floor, with the double door in a front eave wall. These are its settings:

  • Walls: 94 1/2 in tall including the bottom plate and double top plate, so wall studs are cut to 90 in (7′ 6″).
  • Spacing: studs, floor joists and rafters all at 16 in on center.
  • Roof: 6/12 pitch, 2×4 rafters, a 2×6 ridge board, 12 in eave overhang and 4 in rake overhang. The roof footprint is 8′ 9 1/2″ by 10′ 1 1/2″.
  • Floor: three pressure-treated 4×4 skids, about 46 in apart, under 2×6 joists cut to 7′ 9″ and 3/4 in tongue and groove plywood. The skids sit on a crushed stone pad 4 in deep inside a pressure-treated 4×6 frame, 10′ 11″ square, with a landing in front of the door.
  • Loads: the 2×4 rafters pass a span table check at 30 psf ground snow (SPF #2 at 16 in, 48 in run). That is the plan’s design assumption; if your snow load may be higher, check your local permit office before you buy rafter stock.
  • Openings: a 60 in wide double door in the front wall, 1′ 6″ from each corner, with a 6′ 4 1/2″ rough opening, and two windows, each a 24 x 36 in rough opening, one at the front of each side (gable) wall with the sill 3′ 6″ above the bottom plate.
  • Heights: the floor sits 9 3/4 in above the ground, the walls top out at 8′ 8 1/4″ and the peak at 10′ 11 5/16″. The door has 6′ 5 1/4″ of clear height under the head stop.
  • Ramp: a detachable pressure-treated ramp, 5′ 9″ wide and 3′ 6″ out from the door, at a 1:6 slope.
  • Time: the plan estimates about 48 hours for two people: 4 for the site and skids, 5 for the floor, 12 for the walls, 8 for roof framing, 10 for sheathing and shingles and 9 for the door, windows, trim, paint and ramp.

Shopping list by stage

Lumber sizes are nominal, and the span check assumes SPF #2 or better framing lumber. A 2×4 measures about 1 1/2 x 3 1/2 in, as the American Wood Council explains. Check the grade stamp on plywood and OSB; the APA trademark guide shows how to read it.

Totals at a glance

Material Total
2×4 framing boards, all lengths 68
2×4 x 12 ft for temporary braces 16
2×4 x 8 ft for brace stakes and deck cleats 5
All 2x4s on the truck 89
Pressure-treated 2×6 x 8 ft (7 joists, 2 rims) 9
Pressure-treated 4×4 x 8 ft (skids) 3
2×6 (2 window header boards, 1 ridge) plus one 2×8 x 12 ft door header 3 + 1
Ramp lumber: pressure-treated 2×10 x 8 ft, 2×6 x 12 ft, 2×4 x 8 ft 2, 4 and 1
Pad frame: pressure-treated 4×6 x 16 ft and 4×6 x 10 ft 3 and 1
3/4 in T&G plywood sheets (floor) 2
7/16 in OSB sheets (roof) 5
5/8 in T1-11 sheets (walls, gable, door leaves) 11
1/2 in plywood sheets (soffit, header fillers) 2
3-tab shingle bundles 4

Some 8×8 lists online show fewer 2x4s. This count frames rafters at 16 in and puts a rafter tie on every interior pair. The plan adds that you should buy a few spare studs for bad boards.

Foundation and floor

Item Qty Used for
Pressure-treated 4×4 x 8 ft, tagged for ground contact 3 Skids, full length
Pressure-treated 2×6 x 8 ft 9 7 floor joists cut to 7′ 9″ and 2 rim joists at 8′ 0″
3/4 in T&G plywood, 4×8 sheet 2 Floor decking (64 sq ft at full sheet size)
1×4 x 8 ft 1 Decking filler strip, ripped to 1 in (see Where the waste goes)
Crushed stone 3/4 in, loose 2.2 cu yd Gravel pad, measured loose before tamping
Pressure-treated 4×6 x 16 ft, ground contact 3 Pad frame
Pressure-treated 4×6 x 10 ft, ground contact 1 Pad frame
Rebar stakes 1/2 in x 24 in 23 Pad frame
Galvanized timber spikes 3/8 x 10 in 16 Pad frame corners
Deck screws 2 in (or 6d ring-shank nails), rated for treated lumber 3 lb Decking
Ground anchors, screw-in auger type, 30 in or longer, with straps 4 Anchoring the skids
Structural wood screws 1 1/2 in, exterior 24 Anchor straps

Walls and roof framing

Item Qty Used for
2×4 x 8 ft 48 Wall studs, plates, cap plates, cripples, window sills, gable studs, lookout blocks, gable plate ties
2×4 x 10 ft 6 5 rafter ties, frieze blocks
2×4 x 12 ft 10 14 rafters and 4 fly rafters, two from each board, gable vent sills and headers
2×4 x 14 ft 4 Door and window trimmers, collar ties
2×6 x 8 ft 2 Window headers (one board per window)
2×8 x 12 ft 1 Door header
2×6 x 10 ft 1 Ridge board
Hurricane ties, H2.5A type or equal 10 Rafter to plate
Framing angles, A34 type or equal 4 End rafters at the 4 corners
Framing angles, A34 type or equal 4 Gable plate ties to the first top plate
Temporary braces 2×4 x 12 ft 16 2 plumb braces and a squaring diagonal per wall section, plus 4 for the center gable studs, reused later
2×4 x 8 ft 3 8 pointed brace stakes, 24 in each
2×4 x 8 ft 2 12 deck cleats, 12 in each, for the braces and the center gable studs

The three header filler strips of 1/2 in plywood are ripped from a soffit sheet, so buy the soffit plywood with the wall lumber.

Roof covering

Item Qty Used for
7/16 in OSB, 4×8 sheet 5 Roof sheathing
15 lb felt, 400 sq ft roll 1 Underlayment
3-tab shingles, 26 per bundle 4 bundles Roof, starter course and ridge cap
Drip edge, 10 ft 6 Eaves and rakes
Roofing nails 1 1/4 in galvanized 3 lb Shingles
Roofing cap nails 1 in 1 lb Felt
Roofing cement, 10 oz tube 2 Roofing
Louvered gable vent 8 x 8 in 2 Gable ventilation
Under-eave vent 16 x 8 in, screened 2 Air in under the eaves
Insect screen, 2 ft x 25 ft 1 roll Vent holes and gaps

Siding and trim

Item Qty Used for
5/8 in T1-11, 4×8 sheet 8 Walls (256 sq ft, before the door and window cut-outs)
5/8 in T1-11, 4×8 sheet 1 Both gable triangles, cut as strips
5/8 in T1-11, 4×8 sheet 2 Door leaves (one per leaf)
1/2 in plywood, 4×8 sheet 2 Eave soffits and header fillers
Z-flashing, 10 ft 2 Wall siding to gable siding joint
Drip cap, 10 ft 2 Over the door and window head casings
1×6 x 10 ft 2 Eave fascia
1×6 x 12 ft 2 Rake fascia, two pieces from each board
1×4 x 16 ft 2 Corner trim on the eave walls
1×4 x 14 ft 4 Door casing sides, door stiles, door Z braces
1×4 x 12 ft 1 Door rails
1×4 x 8 ft 9 Gable-wall corner trim, door head casing, window casings
1×2 x 8 ft 2 Door stops and astragal
Exterior paint and primer in one 4 gal Two coats of about 419 sq ft each (sized at 300 sq ft a gallon for rough T1-11, plus 10 percent)
Exterior caulk 3 tubes Trim

Ramp

Item Qty Used for
Pressure-treated 2×10 x 8 ft 2 Stringers (two tapered stringers from each board)
Pressure-treated 2×6 x 12 ft 4 8 deck boards, 5′ 9″ each
Pressure-treated 2×4 x 8 ft 1 Ledger on the rim joist and skid
Exterior deck screws 3 in 124 Boards into the stringers
Structural screws 3 in, 1/4 in 10 Ledger into the rim joist and skid
Hook-and-eye latches, 4 in 2 Holding the ramp to its ledger
Anti-slip grit tape, 2 in x 15 ft 4 rolls One strip along each board

Hardware and windows

Item Qty
Framing nails 3 1/2 in (16d), hot-dip galvanized (about 895 nails plus 10 percent) 25 lb
Siding nails 2 1/2 in (8d), hot-dip galvanized 11 lb
Sheathing nails 2 1/2 in (8d) for OSB 3 lb
Connector nails 1 1/2 in for the hurricane ties and angles 2 lb
Construction adhesive, 10 oz tube 5
T-strap door hinges 6
Carriage bolts 1/4 x 2 in with washers and nuts 18
Door handle and latch set 1
Barrel bolts for the fixed leaf 2
Door hold-open hook and eye, 6 in (eye shank 2 1/2 in or longer) 2
Brush door sweeps, 36 in 2
Aluminum threshold cap, 5 ft 1
Exterior screws 1 1/4 in (door frame to T1-11, soffit vent flanges) 1 lb
Exterior screws 3 in (hinge straps into framing, tight wall corners) 1 box
Prefabricated window, 24 x 36 in rough opening 2
Flashing tape 4 in 1 roll
Wood shims 1 bundle

Cut list highlights

Most of the 8×8 cut list is square cuts: 29 wall studs at 7′ 6″ (6 front, 9 back, 7 left, 7 right), 7 floor joists at 7′ 9″ and three 8′ 0″ skids. These have angles, overhangs or more than one length.

Part Lumber Cut length Qty
Rafter (board length, see below) 2×4 5′ 8″ 14
Fly rafter (rake) 2×4 5′ 8″ 4
Ridge board 2×6 8′ 8″ 1
Rafter tie (interior pairs, at the plates) 2×4 8′ 0″ 5
Collar tie 2×4 4′ 2 9/16″ 3
Gable plate tie (flat under the first 2 rafter ties), LEFT and RIGHT gable 2×4 2′ 9 3/4″ and 2′ 6 3/4″ 2 each
Lookout block (rake overhang) 2×4 2 1/2″ 16
Frieze block (over the eave walls, top beveled) 2×4 1′ 1″ (8), 1′ 0 1/4″ and 1′ 1 3/4″ (2 each) 12
Door header (2×8 doubled + 1/2 ply) 2×8 5′ 3″ 2
Door trimmer 2×4 6′ 4 1/2″ 2
Window header (2×6 doubled + 1/2 ply), per window 2×6 2′ 3″ 2
Window trimmer, per window 2×4 6′ 6″ 2
Center gable stud (under the ridge) 2×4 1′ 8 13/16″ 2
Gable end studs 2×4 11 1/16″ and 1′ 7 1/16″ 4 each
Gable corner nailer (flat on the cap plate under each end rafter) 2×4 9 5/8″ 4
Gable vent sill and header (flat) 2×4 2′ 6 1/2″ 4
Side wall plates 2×4 7′ 4 3/4″ 4
Front and back cap plates 2×4 7′ 5″ 2
Front and back wall plates, side cap plates 2×4 8′ 0″ 6

Rafters. The 5′ 8″ figure is the board each rafter needs, measured along the board from the long point of the ridge plumb cut to the long point of the tail plumb cut, including the 12 in eave overhang. The top edge between the two plumb cuts is shorter, about 5′ 6 1/4″, so do not lay out 5′ 8″ along the top edge. Two of them (136 in) come out of each 12 ft 2×4, with about 7 3/4 in left after the kerfs, so the 18 rafters and fly rafters take 9 boards.

Mark the plumb cuts with a speed square pivoted to 6 on the common scale (26.6 degrees). The birdsmouth is a 2 1/2 in level seat and a 1 1/4 in plumb heel, 32 percent of the 3.9 in plumb cut, so keep it under one third. Cut one pattern rafter, test it at both ends of the ridge, then trace the other 13. The 4 fly rafters hang off the lookout blocks and the ridge extension, so they get the ridge plumb cut but no birdsmouth.

Ridge. The ridge is one 2×6 cut to 8′ 8″, running 4 in past each gable wall to carry the fly rafters. A 10 ft board leaves 16 in. The 2×6 is deeper than the 3.9 in plumb cut on a 2×4 rafter, so the full rafter end bears on it.

Headers. The 60 in double door opening gets a doubled 2×8 header (two 5′ 3″ pieces) with a 1/2 in plywood filler, on trimmers cut to 6′ 4 1/2″, with three 6 1/4″ cripples above it. The bottom plate is cut out of the doorway after the wall is up, so the doors swing over the floor. Each window gets a doubled 2×6 header (two 2′ 3″ pieces) on 6′ 6″ trimmers, one 6 1/2″ cripple above, a 2′ 0″ sill and one 3′ 4 1/2″ cripple below, for a rough sill 3′ 6″ above the bottom plate.

Gable studs. Each 8 ft gable has one 1′ 8 13/16″ center stud plus four end studs in two lengths, 11 1/16″ and 1′ 7 1/16″. At 6/12 each stud 16 in further from the corner is 8 in taller, which is why the two lengths are 8 in apart. Four flat 2′ 6 1/2″ pieces and four 8 in side studs frame the two louvered vent openings in the gables. Measure each stud off your actual end rafter before cutting.

Plates. The side walls have 7′ 4 3/4″ bottom and top plates, cut slightly short of the gap between the front and back walls so a framed side wall drops in without a sledge. Their 8′ 0″ cap plates lap over the front and back walls to lock the corners, and the front and back cap plates are cut 7 in short to 7′ 5″.

Siding at the rim. On the front and back walls the T1-11 laps the rim joist by 2 7/16 in and is nailed into it. On the side walls it laps only 3/4 in, too little to nail into the rim, so it is nailed into the bottom plate instead, 2 1/4 in up from the bottom edge.

Gable vs lean-to: what changes

The gable column is the 8×8 gable plan. The lean-to column is the rebuilt 69-page 8×8 lean-to shed plan: a single slope at 3/12 with an 80 in low back wall, a 60 in double door centered in the high front wall and a 36 in window in the back wall. The skids, joists and decking stay the same; the studs, rafters and siding change.

Item Gable (6/12) Lean-to (3/12)
Rafters 14 2×4 at 5′ 8″ + 4 fly 7 2×4 at 9′ 9 3/8″ + 2 fly
Ridge board 2×6, 8′ 8″ None
Wall studs 7′ 6″ on all four walls 8′ 2 5/8″ front, 6′ 3 1/2″ back, seven lengths on each side
2×4 framing boards bought 68 48 (66 with braces, stakes, stop posts and cleats)
2×6 and 2×8 boards bought (not treated) 3 2×6 + 1 2×8 1 2×6 + 1 2×8
T1-11 sheets 11, all 4×8 10: four 4×9, six 4×8 (two are door leaves)
Roof OSB sheets 5 4
Shingle bundles 4 3
Felt 1 roll 1 roll, laid double below 4/12
Fascia boards 1×6: 2 at 10 ft, 2 at 12 ft 1×6: 2 at 10 ft, 2 at 12 ft
Framing nails 25 lb 17 lb
Hardware that differs 2 Z-flashing 4 twist straps at the wall corners, 1 drip cap over the window and door casings
Floor 3 skids, 7 joists, 2 sheets 3 skids, 7 joists, 2 sheets

On an 8 ft deep lean-to the 2×4 rafters still work: the plan sizes them for a 7′ 5″ clear span at 16 in on center, #2 spruce-pine-fir or Douglas fir-larch at about 30 psf of ground snow, and tells you to check the size with your local permit office. Each side wall has 7 studs stepping from 6′ 5 3/8″ to 8′ 3 3/16″ under a 7′ 7 1/2″ sloped top plate, so lay them out on the deck before cutting.

The high front wall and part of each side wall take 4×9 siding sheets, which some yards have to order. At 3/12, read the minimum slope on the shingle wrapper and follow the maker’s low-slope instructions. For more on single-slope builds, see how to build a lean-to shed, the 6×6 lean-to shed plan, all lean-to shed plans and our gable vs lean-to vs hip roof comparison.

Where the waste goes

  • Wall studs: 90 in studs leave about 6 in from each 8 ft board. For these 90 in studs, precut 92 5/8 in studs also work; trim 2 5/8 in off each.
  • Rafters: two 68 in rafters from a 12 ft board leave about 7 3/4 in, so a mis-cut rafter means a new board.
  • Floor joists: 7′ 9″ from an 8 ft board leaves 3 in for squaring the ends.
  • Rafter ties: the five 8′ 0″ ties come from 10 ft boards, leaving about 2 ft each. The list buys 3 boards for the 8 brace stakes and 2 for the 12 deck cleats, but offcuts at least 24 in long can stand in for some stakes.
  • No trim room: the skids, rim joists, front and back wall plates and side cap plates are all 8′ 0″, a whole 8 ft board. Measure these at the yard and check that the factory ends are square.
  • Fascia and ridge: each 8′ 8″ eave fascia and the ridge leave 16 in from a 10 ft board. Each 12 ft rake fascia board gives two 5′ 10 11/16″ pieces with only about 2 1/2 in left, so cut the second piece from a full-length board.
  • Sheets: 2 floor sheets cover 64 sq ft at full size and 8 wall sheets cover exactly 256 sq ft, so buy one spare T1-11 sheet if a damaged sheet would mean a long trip back to the yard. Many tongue and groove panels cover about 47 1/2 in net, so two sheets side by side can land about 1 in short of 8 ft. The plan closes that gap with a 1 in filler strip ripped from the 1×4 x 8 ft on the list; check the net face width on the label before you rip it.
  • No spares: the counts include nothing for rejects. Sight down each board’s edge at the yard, skip bowed or twisted ones, and add a few 2×4 x 8 ft if you expect to cull some.

Tools and crew for an 8×8 build

  • Circular saw, speed square and framing square for 29 stud cuts and 18 rafters; cut the 2 1/2 in lookout blocks from a long clamped stick with a stop block, never as loose scraps
  • Framing hammer or framing nailer, and a drill/driver for the screws
  • 4 ft level and a 25 ft tape for checking that the floor diagonals match (11′ 3 3/4″ each)
  • A hand tamper or a rented plate compactor for 2.2 cu yd of gravel, laid in two thin layers
  • Two 8 ft step ladders for the ridge and fly rafters and a 16 ft extension ladder for roof work from the eave, about 8′ 8″ up; never stand on the top cap or the walls
  • A crew of two: the plan raises each wall as a bare frame. The back wall is about 110 lb, the front wall with the door about 130 lb and the left and right walls about 120 lb each

Common mistakes

  • Forgetting the door sheets. The siding cut out of the doorway is 76 1/2 in tall, shorter than the 77 1/4 in door leaf, so each leaf needs its own new T1-11 sheet.
  • Skipping rafter ties. A ridge board is not a beam. The 5 rafter ties at the plates stop the walls from spreading; the 3 collar ties higher up do not replace them.
  • Two skids instead of three. The plan keeps skids no more than 48 in apart. Three under an 8 ft floor land about 46 in apart; two would leave the middle of the floor unsupported.
  • Leaving out the ramp lumber and pad frame. Both are on the list: pressure-treated boards for the detachable ramp and ground-contact 4×6 boards for the pad frame, so add them to the first lumber order.
  • Swapping materials without recounting. This list is for 3-tab shingles and T1-11. Architectural shingles, metal roofing or lap siding cover differently, so recount from the coverage printed on the bundle or the maker’s install guide.
  • Untreated wood near the ground. Skids, rims, joists and the ramp are pressure treated; plain framing lumber there rots. Use ground-contact rated wood for the skids, pad frame and ramp, and hot-dip galvanized nails and treated-lumber rated screws in treated wood. The USDA Wood Handbook covers why wet, untreated wood decays.

The list includes 4 screw-in ground anchors with straps; ask which anchor type your area accepts for a skid shed. Many towns set floor-area and height limits for sheds that need no permit, and an 8×8 can land on either side of them, so check your local permit office before you order. Our shed permit checklist lists what to ask.

For the base under the skids, see shed foundation options. To compare 2×4 counts across sizes, see how many 2x4s to build a shed, and for other sizes try the shed material calculator.

Get the full plan

The 8×8 gable shed plan is a 68-page 3DSHEDPLANS PDF with 28 sections, the cut list, the cutting plan and the printable material list this page is taken from. It is drawn with the same 60 in double door, two 24 x 36 in windows and wheel-in ramp, and it estimates about 48 hours for two people. For a little less or more room, see the 6×8 gable shed plan and the 8×10 gable shed plan, and compare the 8×10 shed material list.

Want to see the format first? Download the free 8×8 gable shed plan preview PDF. Not sure 64 sq ft is enough? Read what size shed do I need or browse every size on the shed plans page.

Frequently asked questions

Is there a free 8×8 shed plan with a materials list?

Yes. This page is a free 8×8 materials list with cut lengths for a gable shed on skids. The 3DSHEDPLANS 8×8 gable shed plan is a 68-page PDF with the same list printed by build stage, and its free 8-page preview PDF shows the format first.

How many 2x4s do I need for an 8×8 shed?

89 for an 8×8 gable shed with a 60 inch double door and two windows: 68 framing boards (48 at 8 ft, 6 at 10 ft, 10 at 12 ft, 4 at 14 ft), 16 temporary 12 ft braces, and 5 boards at 8 ft for stakes and deck cleats.

How many sheets of plywood, OSB and siding for an 8×8 shed?

2 sheets of 3/4 in tongue and groove plywood for the floor, 5 sheets of 7/16 in OSB for the roof, 11 sheets of 5/8 in T1-11 (8 walls, 2 door leaves, 1 gable) and 2 sheets of 1/2 in plywood for the soffits and header fillers.

How many bundles of shingles for an 8×8 shed roof?

4 bundles of 3-tab shingles for an 8×8 gable roof at 6/12 with 12 in eaves and 4 in rakes. That count includes the starter course and ridge cap, and the list adds 6 pieces of 10 ft drip edge. A 3/12 lean-to roof takes 3 bundles (about 78 shingles with the starter).

What lumber do I need for an 8×8 shed floor?

Three pressure-treated 4×4 x 8 ft skids, nine pressure-treated 2×6 x 8 ft (seven joists cut to 7' 9" and two 8' 0" rims) and two sheets of 3/4 in tongue and groove plywood, set on a crushed stone pad in a pressure-treated 4×6 frame.

Get 3 shed building tips by email

Short emails over 5 days: site prep, framing mistakes to avoid, and how the full plan saves lumber. Unsubscribe anytime.