Hip roof · 64 sq ft
8x8 Hip Roof Shed Plan
Build this 8x8 hip roof shed yourself. Every board, cut and step, drawn in 3D across 68 pages.
- 30-day money-back guarantee
- PDF by email right after checkout
- Visa, Mastercard, Amex, PayPal
- Full material and shopping list
- Cut list with every length
- Step-by-step 3D views, 68 pages
- Phone, tablet, PC and Mac

This 8x8 hip roof shed plan from 3DSHEDPLANS builds a 64 sq ft storage shed, 8 ft by 8 ft, with a 5 ft double door in the front wall, a ramp, a window in each side wall and a 6/12 roof with 12 inch eaves on all four sides. The 68-page PDF has 19 step sections.
Get the full plan PDF for $19.99 or download the free preview
What builders say
A project for me and my son. The plan arrived in my email almost instantly, and everything we needed was included.
We aren't DIY-savvy and needed something simple. The plan was extremely well laid out and easy to follow.
A year ago I had only built flat-pack furniture. The plans are simple to follow, and you don't need years of experience.
The full plan is $19.99: buy the 8×8 hip roof shed plan. To see the drawing style first, open the free 8×8 hip roof shed plan PDF.
8×8 hip roof shed plan: the numbers for a site check
| Check | 8×8 Hip Roof Shed |
|---|---|
| Walls | 8′ 0″ wide x 8′ 0″ deep, 64 sq ft of floor |
| Roof footprint with overhangs | 10′ 1 1/2″ x 10′ 1 1/2″ to the fascia faces (1′ 0″ eaves on all four sides) |
| Gravel pad | 10′ 0″ x 10′ 0″ inside a pressure-treated 4×6 frame, 4″ of 3/4″ stone (2.2 cu yd loose, with the landing in front of the door) |
| Floor height | Top of the deck 9 3/4″ above the ground |
| Wall height | 7′ 10 1/2″ (7′ 6″ studs), top of the walls 8′ 8 1/4″ above the ground |
| Overall height | 10′ 11 5/16″ above the ground, top of the cap shingles at the peak |
| Roof | Hip, 6/12 (26.6 degrees), 2×4 commons and jacks, 2×6 hips and hub block |
| Door rough opening | 5′ 0″ wide x 6′ 4 1/2″ tall, double door centered in the front wall, swings out |
| Window rough openings | 2, each 24″ x 36″, one at the front end of the left wall and one at the front end of the right wall |
| Ramp | Detachable pressure-treated ramp, 5′ 9″ wide, 3′ 6″ out, 1:6 slope |
| Crew and time | Two people, about 48 hours |
A hip roof overhangs all four walls, so stake out the 10′ 1 1/2″ square roof outline on your lot, not just the 8 ft walls. Leave room to walk around it with a ladder, since every side has an eave. The ramp, landing and pad frame reach 7′ 1″ out from the front wall and the door swings out, so the plan says to keep 7′ 1″ clear in front of the door.
How the 8×8 hip roof shed plan goes together
| Stage | What the plan uses | Time for two |
|---|---|---|
| Site and foundation | Compacted gravel pad in a 4×6 frame, three 8 ft pressure-treated 4×4 skids | 4 h |
| Floor frame and deck | Pressure-treated 2×6 joists 16″ on center, 3/4″ tongue and groove plywood | 5 h |
| Walls | 2×4 studs 16″ on center, raised as bare frames, then sided with 5/8″ T1-11 | 12 h |
| Roof framing | 2×6 hub block, 2×4 commons and jacks, 2×6 hips, rafter ties | 8 h |
| Sheathing and roofing | 7/16″ OSB, drip edge, 15 lb felt and 3-tab asphalt shingles | 10 h |
| Door, windows and trim | T1-11 double door, 2 prefabricated windows, mitered 1×6 fascia, sloped soffit, 1×4 trim, paint | 9 h |
The plan runs in a fixed order: preparation and ground breaking (step 9), skids (10), floor frame (11), decking (12), the four walls (13 to 16), joining them (17), the door (18), the roof framing plan (19), commons and hub (20), hips (21), jacks (22), fascia and soffit (23), sheathing and shingles (24), anchoring the shed (25), trim, windows and finish (26) and the ramp (27). Section 28 covers weather, snow and upkeep, and a printable build checklist at the back lists each stage with a “date done” column.
Site layout, gravel pad and skids
Stake the four corners 8′ 0″ apart and move one stake until both diagonals read 11′ 3 3/4″. The plan has you dig 4″ deep over a 10′ 11″ square, which is the outside of the pad frame, and on out in front of the door for the ramp and a 3 ft landing: 8′ 8″ wide, centered on the door, reaching 7′ 1″ out from the front wall. Digging moves the stakes, so set them again and check the diagonals again.
The pad frame is pressure-treated 4x6s laid flat, rated for ground contact (UC4A or higher), on a 1/2″ stone bed so it finishes level with the lawn. Its inside is the 10′ 0″ x 10′ 0″ gravel pad plus a landing 7′ 9″ wide that reaches 5′ 7 1/2″ past the front of the pad. Square the frame until both pad diagonals read 14′ 1 11/16″, pin it with 23 rebar stakes, and join each corner with 2 galvanized 10″ timber spikes. Then fill it with 4″ of 3/4″ crushed stone, compacted in two layers with a hand tamper and checked with a long straight board and a level.
On a sloped yard the plan has you run a string with a line level from the highest stake. A few inches of fall is made up with deeper stone on the low side, compacted every 2″. More than that means digging the high side down, or setting solid concrete blocks on compacted stone under the low skids and shimming them with pressure-treated shims.
Three ground-contact pressure-treated 4×4 skids, each a single 8 ft board, run left to right parallel to the front wall, so the front and back rims sit on the outer two. The outer skids sit flush with the floor edges and the middle one falls 3′ 10 1/4″ on center. Each skid goes in crown up and is leveled along its length and against the others. A low skid comes up with gravel or treated shims, never untreated wood.
Floor frame and decking
The floor frame is seven 7′ 9″ joists between two 8′ 0″ rims, all pressure-treated 2×6, at 16″ on center. The plan has you clamp the two rims together and mark both at once from the building’s left end: one joist flush at each end, then lines at 15 1/4″, 31 1/4″, 47 1/4″ and every 16″. The rafter marks later start from the same corner, so the framing lines up from the bottom to the top.
Once nailed the frame weighs about 150 lb and racks if you lift it, so you build it in place on top of the skids. Push the long corner until both diagonals match at 11′ 3 3/4″, then toe-nail the frame to the skids. A framing angle goes at every place a joist crosses a skid, 21 in all, with 8 connector nails each. The toe-nails hold the frame while you work, and the angles keep it on the skids for good.
Two full sheets of 3/4″ tongue and groove plywood cover the deck, each row one piece, so there are no end joints to stagger. Two rows cover about 7′ 11″ of the 8′ 0″ depth, and a 1×4 ripped to 1″ fills the last inch along the back rim, where the back wall’s bottom plate covers it. Every sheet is glued with a bead of construction adhesive on each joist and screwed 6″ apart on the edges and 12″ in the field.
Walls: framing order and lift weights
Each wall is framed flat on the deck, checked by its diagonals and raised as a bare frame by two people. The siding goes on after all four stand.
| Order | Wall | Studs at 7′ 6″ | Bare frame weight |
|---|---|---|---|
| 1 | Back wall, 8 ft, no openings | 9 (including 2 corner backers) | About 110 lb |
| 2 | Front wall with the door opening | 6 (including 2 kings, plus 2 trimmers and 3 cripples) | About 130 lb (the heaviest lift) |
| 3 | Left wall with a window | 7 (including 2 kings) | About 120 lb |
| 4 | Right wall with a window | 7 (including 2 kings) | About 120 lb |
- Small deck, careful order. An 8 ft deck is tight. The back wall is framed at its own edge and tips up flush. The front wall does not fit at its own edge once the back wall stands, so it is framed facing the other way, tipped up beside the back wall and walked across the deck to the front edge.
- Stop blocks. Nail two 12″ 2×4 offcuts to the outside of the rim near its ends, their tops 2″ above the deck, so the bottom plate tips against them and cannot kick out over the edge. Pull them before the siding goes on.
- Where to stand. The lifters stand at the top plate, one near each end. Nobody stands on the ground in front of a wall while it goes up, because a wall that goes past plumb falls outward, off the deck.
- Brace first. Pick a calm day, since a bare frame catches wind like a sail, have the braces and nails at hand, and never leave a raised wall unbraced, even for a minute.
- Side walls drop in. Their plates are 7′ 4 3/4″, 1/4″ shorter than the gap between the front and back walls, so plumb those two first. The right wall is walked in between them, the one time a standing wall is held by hands alone, so the plan says to keep both hands on it and stop for any wind.
- Siding from a ledger. Screw a straight 2×4 ledger to the floor frame, stand each 60 lb T1-11 sheet on it and have your helper hold it plumb while you tack the top corners.
The corners are screwed together from inside with 3″ exterior screws every 12″ through each side wall’s end stud, and the 1/4″ gap at the back corners gets a shim at each screw. The second top plates then lap every corner by at least 3 1/2″. The front and back walls each carry two corner backers just in from the ends, which give the inside corners a nailing face for shelf cleats later.
Door and windows: sizes and positions
The door opening is 5′ 0″ wide and 6′ 4 1/2″ tall, from 1′ 6″ to 6′ 6″ measured from the left corner of the front wall, so it sits centered with 1′ 6″ of wall each side. It sits under a header of two 5′ 3″ 2x8s with 1/2″ plywood between them. Once the bottom plate is cut out of the opening the framed height is 6′ 6″, and 6′ 5 1/4″ is clear under the head stop.
The two door leaves are cut from two new T1-11 sheets, because the piece cut out of the opening is too short. Each leaf is 2′ 5 5/8″ wide and 6′ 5 1/4″ tall with a glued and screwed 1×4 frame (two stiles and three rails) and two Z braces, 3′ 2 3/16″ along either edge, cut with the miter saw set to 29 degrees. Three T-strap hinges hang each leaf on 1/4″ carriage bolts with the nuts inside, so nobody can unscrew the door from outside. The fixed leaf closes on two barrel bolts, and a 1×2 astragal on its inside face gives the active leaf something to close against.
A brush sweep closes the gap under each leaf, and an aluminum threshold cap covers the deck edge across the 5′ 0″ opening. There is no threshold board, so wheels roll straight in from the ramp. A 6″ hook and eye holds each open leaf against the side wall so wind cannot slam it on you or the mower. The latch sits on the active leaf at the middle rail, 3′ 3 1/8″ above the deck.
The two windows are prefabricated units for 24″ x 36″ rough openings, one in each side wall, 1′ 0″ to 3′ 0″ from the front end of the wall, so both sit near the door. The left wall’s table measures from its back end, where the opening runs from 4′ 4 3/4″ to 6′ 4 3/4″ along the 7′ 4 3/4″ plate. Each sill top is 3′ 6″ above the bottom plate, and each header is two 2′ 3″ 2x6s with a plywood filler. The plan wraps each opening with flashing tape (sill, then sides, then head) and puts a drip cap over each head casing.
What is on the 8×8 hip roof shed material list
The shopping list is split by section, so you can buy the base first and the roof later:
| Section | Main items and counts |
|---|---|
| Foundation and floor | 3 pressure-treated 4×4 x 8 ft skids, 9 pressure-treated 2×6 x 8 ft (7 joists, 2 rims), 2 sheets of 3/4″ tongue and groove plywood, a 1×4 filler strip, about 2.2 cu yd of stone, the pad frame (1 ten-foot and 3 sixteen-foot pressure-treated 4x6s) with 23 rebar stakes and 16 timber spikes |
| Walls | 2×4 plates and studs for four walls, a doubled 2×8 door header, two doubled 2×6 window headers, 8 sheets of 5/8″ T1-11 |
| Roof framing | 4 commons from two 12 ft 2x4s, 4 2×6 x 8 ft boards for the hips, 2x4s for 16 jacks, a full rafter tie and two king tie halves, a temporary 12 ft 2×4 post with 4 braces |
| Roof covering | 6 sheets of 7/16″ OSB (5 plus 1 spare), 1 roll of 15 lb felt, 6 bundles of 3-tab shingles (starter, hip caps and apex cap included), 8 pieces of drip edge |
| Fascia, door, windows and trim | 4 1×6 x 12 ft fascia boards, 3 sheets of 1/2″ plywood for the soffit, 2 new T1-11 sheets for the leaves, 6 T-strap hinges, a handle and latch, 2 barrel bolts, 2 sweeps, 2 hold-open hooks, a threshold cap, 2 prefabricated windows, 1×4 casing and corner trim |
| Ramp | 2 pressure-treated 2×10 x 8 ft for the stringers, 4 pressure-treated 2×6 x 12 ft for the 8 deck boards, a pressure-treated 2×4 ledger, 2 hook-and-eye latches, 4 rolls of grit tape |
| Hardware and finish | 19 lb of 16d framing nails, siding, sheathing and roofing nails, 24 hurricane ties (skewable ones at the hip corners), 21 framing angles, 4 strap ties plus a splice strap, 4 ground anchors, 5 tubes of adhesive, flashing tape, insect screen, 4 gallons of paint |
The list also counts the temporary pieces people forget to buy: 12 wall braces, 4 post braces, 24″ stakes and the deck cleats for the braces. Lumber is listed in the stock length that wastes the least for each part, and the list suggests 2 or 3 spare studs for bad boards. The lumber yard order adds every section up into one list for the counter.
Cut list and cutting plan
The cut list gives every part’s lumber, exact length and count: skids at 8′ 0″, joists at 7′ 9″, wall studs at 7′ 6″, commons at a 5′ 8″ board, hips at a 7′ 6 13/16″ board and jacks at 2′ 8 11/16″ and 4′ 2 5/8″. The trim, door and ramp parts are on it too, down to the 1×2 door stop and astragal, and so is every piece of the pad frame.
The cutting plan then says which board each part comes from and what is left over. Two commons come out of each 12 ft 2×4, four of the short jacks come out of each 12 ft 2×4, and two of the long jacks come out of each 10 ft 2×4. The 5 1/16″ offcut of a hip board gives the 1 1/2″ hub block. The 8 tail jacks cost no extra boards, since they come from the window sill offcuts. The roof sheathing has its own cutting plan: 5 sheets cut to a lettered piece map, plus 1 spare kept whole, so one miscut does not stop the job.
Why a square shed gets a pyramid hip roof
On a rectangular hip roof the four hips run up to the two ends of a short ridge. When the walls are the same length both ways, that ridge shrinks to nothing and the four hips meet at one point. The plan calls it a pyramid roof: four identical triangular planes, all at 6/12 (26.6 degrees).
Instead of a ridge board there is a 2×6 hub block, only 1 1/2″ square in plan and 5 1/2″ tall, at the center of the shed, 3′ 11 1/4″ from each wall to its face. The front and back commons, two king commons (one in the middle of each side wall) and all four hips nail into it. Every hip, every jack length and every sheathing piece is the same on all four sides, so one set of patterns serves the whole roof.
On an 8 ft wall the rafter layout is short. The commons sit at 4′ 0″, the middle of each wall, and the jacks sit at 1′ 4″ and 2′ 8″ from every corner. That is why this roof has only two jack lengths.
How the 8×8 hip roof is framed: hub, commons, hips and jacks
The plan frames the roof in a fixed order and says who stands where:
- Hub on a temporary post. A 9′ 7 5/16″ 2×4 post stands on the floor at the center, braced four ways to deck cleats, with its faces set so the rafter ties will pass beside it. A 12″ cleat on its right face stands 4″ above the post top. On the deck, you nail the hub to the plumb cut of the left king common first, while both faces of the hub are free. Two people then set them together: one on an 8 ft step ladder on the deck beside the post, between two braces and no higher than the third step from the top, the other on a second step ladder at the left wall, two or three steps up. The king weighs about 7 lb with the hub on it, and the hub’s top ends up 2′ 2 5/16″ above the plates.
- Commons. Cut one pattern common (board 5′ 8″, top edge 5′ 6 1/4″, seat 2 1/2″, heel 1 1/4″, a notch 32% of the rafter depth), test it on both sides of the hub, then cut 4. Face-nail the front common through the predrilled hub, then toe-nail the back common. The cleat comes off before the right king, because it stands where that plumb cut goes. The plate is 7′ 10 1/2″ above the deck, past a standing reach, so never set or nail a seat from the deck, and never from the ladder at the post.
- Ties. One 8′ 0″ 2×4 tie runs front to back beside the commons. The king ties are two unequal halves, 4′ 0 3/4″ and 3′ 9 3/4″, because the first tie sits beside the center, not on it. They butt the first tie and are joined over it with a flat 24″ strap tie so they pull as one.
- Four hips. Each 2×6 hip runs at 45 degrees in plan from a corner to the hub, sloping 19.5 degrees. Its seat drops 1/4″ so its top corners stay in the roof planes, both ends get double 45 degree cheek cuts, and the tail is ripped 2 1/16″ so it lines up with the soffit. Before the first hip goes up, a strap tie goes across the lapped top plates at each corner. Set the hips in opposite pairs so the hub is pulled evenly. Two people set each hip, which weighs about 15 lb: one on the step ladder by the post holds the point in its corner at the hub, the other on a step ladder inside the wall corner sets the seat. Nobody works from outside the walls until the fascia step.
- Jacks last. 16 jacks run from the walls up to the hips, centered 1′ 4″ and 2′ 8″ from every corner, the longer one 1′ 5 7/8″ longer than the short one. Their 45 degree side cuts come in left and right hands, 4 of each per length. Nail them in pairs on both sides of a hip, with three nails into the hip and a hurricane tie at the plate, then take the post out. Eight short tail jacks fill the long free edge of the eave between each hip tail and the first jack.
The hip seat notch is 3 7/16″ of a 5 13/16″ plumb depth, 59%, far past the one-third rule the commons keep. The plan explains why in step 21.4: the seat sits right over the lapped plates at the wall corner, so the notch carries no bending, and a hurricane tie, toe-nails and a metal strap hold it. Do not cut it deeper than drawn. Our hip roof shed framing guide walks through the same sequence in more detail.
Fascia, soffit, sheathing and shingles on a hip roof
A hip roof has eaves on all four sides and no rakes, which changes the trim. The four 1×6 fascia boards are each 10′ 1 1/2″ long point to long point, mitered at 45 degrees over every hip tail, and on this size every side is one board cut from a 12 ft 1×6. The 8 plywood soffit strips are 1′ 0 7/16″ wide, ripped from 3 sheets, and slope with the rafter tails. They meet at the corners with a cut line at 48.2 degrees to the strip’s edge, not 45, because they are sloped.
The roof is about 112 sq ft. Each plane is cut from three pieces (a wide bottom piece, a small corner triangle and a top triangle up to the apex), lettered A to F on the map, and the back and the second side are mirror images. Every end joint lands on a rafter center. The 8 drip edge pieces go on all four eaves before the felt, folded around each corner. Felt runs from the eaves up with 2″ head laps and 4″ end laps, wrapping 6″ over each hip, and this roof uses about 140 sq ft of a 400 sq ft roll.
Shingles run 14 courses up each plane at 5″ exposure, over a starter strip on all four eaves. Where a course meets a hip, you let the shingles run past, snap a line along the hip and cut them off from the top. About 72 cap pieces, cut three to a shingle from 25 shingles, cover the hips from the eave up. One last cap piece, slit at the corners, folds over the apex and is bedded in roofing cement. Total: 6 bundles.
Roof ventilation on this plan
A hip roof has no gable wall for a high vent, and this plan has no roof vent. The plan gives the shed one vent: a 1/4″ gap at the siding under the soffit, backed with insect screen, around all four eaves. The plan says plainly that this gap is the shed’s only vent and that it is low air only. That suits unheated storage. If you plan to heat or insulate the shed, the plan says to plan roof vents as well.
What you can fit in an 8×8 hip roof shed
The plan’s “What fits inside” page draws the room from above, 7′ 5″ across inside, with 7′ 7 1/2″ of clear height under the top plates. It is honest about what an 8 ft room holds:
- A push mower and a wheelbarrow, side by side. With both leaves open the door is about 4′ 11 1/2″ clear. The mower goes in nose first with its handle folded (1′ 10″ x 3′ 2″), and the wheelbarrow takes 2′ 2″ x 5′ 0″.
- Two bikes. With the handlebars staggered they take 2′ 6″ x 5′ 10″.
- Back-wall shelves, yours to add. The back wall has no opening, so 12″ deep shelves fit along it. They are not on the shopping list. A 2′ 7″ aisle runs from the door to the mower, so roll the mower out to reach the middle of the shelf.
- Not a riding mower. A 42″ deck rider (4′ 7 3/16″ wide) would clear the open door by only 2 1/8″ a side and leave no room to park anything else, so the plan does not promise it. If you need a rider in, look at a larger plan.
- A ramp. The deck sits 9 3/4″ above the gravel, so wheels need the ramp from step 27. It is 5′ 9″ wide and 3′ 6″ out at 1:6 (9 degrees), and its top sits about 13/16″ below the deck at the door. The leaf swings out over it with 1 1/4″ to spare. Set a mower deck to its highest cut before you push it up. Our guide on how to build a shed ramp covers the idea in general.
- Headroom under the ties. The front-to-back tie and the two king tie halves cross near the center at plate height, 7′ 10 1/2″ above the floor. Above them the roof is open to the hub, so long, light items can lie across the ties near the walls.
- Daylight by the door. Both 24″ x 36″ windows sit at the front end of the side walls, so the light falls where you load and unload.
Hip roof vs gable roof on an 8×8 shed
We sell both roofs on the same 8×8 footprint, so the trade-off is easy to check with real numbers from each plan:
| Item | 8×8 hip roof | 8×8 gable |
|---|---|---|
| Overall height | 10′ 11 5/16″ | 10′ 11 5/16″ |
| Roof footprint | 10′ 1 1/2″ x 10′ 1 1/2″ | 8′ 9 1/2″ x 10′ 1 1/2″ |
| Roof sheathing | 6 OSB sheets | 5 OSB sheets |
| Shingles | 6 bundles | 4 bundles |
| Drip edge | 8 pieces | 6 pieces |
| Hurricane ties | 24 | 10 |
| T1-11 sheets (walls + gables + door leaves) | 10 (8 + 0 + 2) | 11 (8 + 1 + 2) |
| Framing 2x4s on the list | 60 (48 at 8 ft, 5 at 10 ft, 4 at 12 ft, 3 at 14 ft) | 68 (48 at 8 ft, 6 at 10 ft, 10 at 12 ft, 4 at 14 ft) |
| Soffit plywood | 3 sheets | 2 sheets |
| Vents | 1/4″ soffit gap only | Gable vents plus soffit vents |
| Time for two | About 48 hours | About 48 hours |
The hip roof needs more roof material and more angled cuts: four hips with cheek cuts, 16 jacks in two hands and 8 tail jacks. In return there are no gable triangles to frame and side, no rakes and an eave over every wall, which keeps rain off the siding on all four sides. A hip roof generally holds up to wind better than a gable roof, according to the Building America Solution Center guide to hip vs gable roofs. If you want vents high in the roof or the simpler framing, the 8×8 gable shed plan builds the same floor and walls.
Anchoring, tools, ladders and fasteners the plan lists
The plan figures that, empty, this shed on loose skids slides at about 13 psf of wind (gusts near 60 mph) and tips at about 18 psf. So once the roof is on, and before you fill it, you set 4 screw-in auger ground anchors, 30″ or longer, with galvanized straps: on the front outside skid at 11″ and 7′ 1″ from the left end, on the back outside skid at 1′ 0″ and 7′ 0″. Each strap runs up the skid’s outside face and onto the rim joist, fastened with 1 1/2″ structural screws, 4 into the skid and 2 into the rim.
Beyond a circular saw with a rip guide, a speed square, a framing square, a drill/driver and a framing hammer, the tool list adds:
- a miter saw for the door braces (set to 29 degrees) and the trim
- a reciprocating saw or oscillating tool for the flush cuts at the threshold and the window openings
- a 3 lb sledge for the pad frame spikes, rebar stakes and brace stakes, and two bar clamps, 24″ or longer, for marking the rims together
- a 4 ft level, an 8 ft straight board and a string line with a line level, plus a hand tamper for the pad
- a steel bar or pipe, about 3/4″ x 3 ft, for turning the ground anchors
- two 8 ft step ladders, which reach the hub, and a 16 ft extension ladder for roof work from the eave, about 8′ 8″ up
The fastener schedule gives the nail and count for every joint, from three 16d nails per joist at the rims to three nails through the side cut of every jack. The list counts 19 lb of 16d framing nails, about 660 nails plus 10%.
Free 8×8 hip roof shed plan PDF vs the full plan
The free PDF is an 8-page streamlined version: the five stages (site and foundation, floor, walls, roof, trim and paint) with views from the full plan and framing previews. It has no material list, no cut list and no measurements.
The full 68-page plan adds every step, the roof framing plan with each rafter center, the hub and post details, the hip and jack cut marks, the sheathing piece map, the ramp, the “What fits inside” page, the shopping list and the cut list. The PDF also lists the 98 checks it passed before going on sale, from framing that closes to sheets and shingles that cover every surface.
Before you build an 8×8 hip roof shed
- Permits. At 64 sq ft and 10′ 11 5/16″ tall, this shed is small, but some towns and HOAs cap height or set setback limits, and rules vary. Check your local permit office before you buy lumber, and use our shed permit checklist to know what to ask. Call 811 a few working days before you dig.
- Snow and wind. The plan uses common small-shed framing. In heavy snow or high-wind areas, ask your local permit office about rafter size, spacing and anchors before you build.
- Skids. Use ground-contact rated pressure-treated 4x4s (UC4A or higher). Our gravel shed foundation guide covers the pad in more depth.
- Safety. Set the hub and first commons with a helper, stand each ladder on firm, flat footing, stay off open rafters until the sheathing is on, keep ladders and sheets 10 ft from overhead power lines and never work on the roof alone.
- Materials. Store lumber flat and covered, since wet wood decays faster (USDA Forest Products Laboratory Wood Handbook). Check the stamp on each OSB sheet for its span rating (APA: OSB).
- Upkeep. Keep 6″ or more between the siding and the soil, and every spring check for lifted shingles, re-caulk the trim and make sure the skids are still level and dry.
Related plans
- Same size with a gable roof: the 8×8 gable shed plan, or a single slope, the 8×8 lean-to shed plan.
- 4 ft wider under the same roof style, with a 6 ft door: the 8×12 hip roof shed plan.
- A square 100 sq ft pyramid with room for a 42 inch rider: the 10×10 hip roof shed plan.
- Every hip roof shed plan in one place, or browse all shed plans.
Shed building guides
- 6×12 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×10 Firewood Shed Material List: Lumber, Slats, Hardware
- 8×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×8 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×12 Firewood Shed Material List: Lumber, Slats, Hardware
Frequently asked questions
How big is the 8×8 hip roof shed?
The walls are 8 ft by 8 ft, 64 sq ft of floor. With 12 inch eaves on all four sides the roof covers 10 ft 1 1/2 in by 10 ft 1 1/2 in to the fascia faces, and the top of the peak shingles stands 10 ft 11 5/16 in above the ground.
Why does the 8×8 hip roof have no ridge board?
On a square shed the four hips meet at one point, so the plan uses a 1 1/2 inch 2×6 hub block instead of a ridge. Two commons, two king commons and four hips nail into it while a temporary 2×4 post holds its top 2 ft 2 5/16 in above the wall plates.
What is on the 8×8 hip roof shed material list?
Every item with its quantity, by section: 3 pressure-treated 4×4 skids, 9 pressure-treated 2x6s, 2 floor sheets, 10 T1-11 sheets, 4 commons, 4 2×6 hips, 16 jacks and 8 tail jacks, 6 OSB sheets, 6 shingle bundles, 2 windows, 24 hurricane ties, the ramp lumber, nails and 4 gallons of paint.
How long does it take to build the 8×8 hip roof shed?
The plan estimates about 48 hours for two people: 4 for the site and foundation, 5 for the floor, 12 for the walls, 8 for the roof framing, 10 for sheathing, felt and shingles and 9 for the door, windows, trim and paint.
Will a riding mower fit in the 8×8 hip roof shed?
The plan does not promise one. With both leaves open the door is about 4 ft 11 1/2 in clear, so a 42 inch deck rider clears each side by only 2 1/8 in and leaves no room for anything else. The fit plan draws a push mower and a wheelbarrow side by side, plus two bikes.
More about the 8×8 hip roof shed plan
Build Your Own 8×8 Hip Roof Storage Shed With Ease!
A Hip Roof Shed, as the name implies, looks classy and at the same time can you give your garden or lawn extra space to store your supplies or hardware. Besides, if you are a hobbyist and you want your very own personal space to work, then having a 8×8 Hip Roof Storage Shed is probably the best idea! So wait no more – order now and start building today…
Shed Plan Includes:
A Full-Fledge Material List with Required Quantity
The materials you use to build a shed are the secrets to your success. Unfortunately, most plans out there won’t precisely tell you what to buy and in what quantity. In fact, they would lure you to buy products from the plan-sellers. Luckily, we have a completely different motto. We want you to succeed in building your dream shed. And for that, we understand how important it is to get the right materials.
Our 8×8 Hip Roof Storage Shed Plan comes with an all-inclusive list of materials, hardware and tools that you would need to build the shed. Nothing more, nothing less! No click baits! You get a printable list of materials that you can take to the hardware store.
Shed Plan Includes:
Simple, Easy to Understand Step by Step Instructions
Who would have ever thought to get their hands on a shed plan that would take them through the entire process with such ease! Our 8×8 Hip Roof Storage Shed Plan comes with easy to understand, step by step instructions for DIY newbies. Don’t worry if you don’t have any experience in building wooden structures. The plan takes you through it in plain words, without jargon. Right from building the foundation to the walls and even the roofing, we have everything covered for you.
Shed Plan Includes:
3D Rendered Images for Reality Check
2D images are a thing of the past! Our 8×8 Hip Roof Storage Shed Plan comes with 3D rendered images, which means you get to see every corner, every angle and every inch clearly as if it is being right in front of you by a professional. You won’t have to scratch your head thinking how the shed should from the front, back or the sides. Even the rooftops are visualized in 3D for better understanding.
Building Your Own Shed vs. Getting Professional Help
1st Reason
You Save What a Builder Would Charge
Probably the most important reason for building your own shed is that you save money. A builder charges for labor on top of the materials, for work you can do yourself. With our 8×8 Hip Roof Storage Shed Plan, you get clear instructions, material lists and diagrams to go through the process easily.
2nd Reason
Choose Your Own Design and Make Your Dream Come True
Don’t fall for the marketing gimmicks of most professionals out there. When you start building your own shed, the world is out there for you to explore. With our material list and instructions, you will realize that you can build your dream shed without any design restrictions. The plan is simple yet it gives you the liberty to add in your own flavor!
3rd Reason
You Will Reclaim Your House Again
Our 8×8 Hip Roof Storage Shed has 120 sq ft of floor for your storage. Whether you garden or play sports, you can use the shed to keep all sorts of your equipment and tools. Besides, the shed will add an exquisiteness to your garden while fulfilling its purpose.
All the Other Reasons
This Is Exactly What You’ll Get with Your 8×8 Hip Roof Storage Shed Plan!
19 step-by-step sections that guide you through the whole process.
Designed for beginners as well as for the professionals.
Explanatory 3D images so you can see exactly what to do next.
Comprehensive materials list that gives you exactly what you need.
Your plan will look great on any mobile device.
PRO-TIPS throughout the build.
High quality PDF plan with everything you need emailed to you instantly.
How to Build a 8×8 Hip Roof Shed: The Steps at a Glance
This is a short overview of how the 8×8 hip roof shed goes together. The full plan PDF has 19 build steps on 68 pages, with the cut length and count of every part, a shopping list with quantities and drawings for the steps.
Step # 1: Check the Rules Where You Live
Rules for sheds, such as size limits, setbacks and permits, vary by town and HOA. Check your local permit office before you build.
Step # 2: Know the Size of Your 8×8 Shed
The shed is 8 ft wide and 8 ft deep (64 sq ft of floor). The walls are 94 1/2″ tall including the plates, with a 6/12 roof. The roof peaks about 10′ 11 5/16″ above the ground. It has a double door in the front wall and 2 windows (24″ by 36″ rough openings). The plan estimates about 48 hours of work for two people.
Step # 3: Get the Tools and Materials
You need basic carpentry tools: a circular saw, a speed square, a drill/driver, a framing hammer or nailer, a 4 ft level and a tape measure. The main materials are pressure-treated 4×4 skids and 2×6 floor joists, 3/4 in tongue and groove plywood, 2×4 studs, 5/8 in T1-11 siding, 2×4 rafters, 7/16 in OSB, roofing felt, drip edge and asphalt shingles. The plan’s shopping list gives the quantity of each.
Step # 4: Build the Foundation and Floor
Lay a compacted gravel pad and set the pressure-treated 4×4 skids level in both directions. Build the floor frame from pressure-treated 2×6 joists 16 in on center, square it by measuring the diagonals, fix it to the skids, then glue and screw the 3/4 in tongue and groove plywood on top.
Important Tips:
- Build the foundation where the shed will stand. Moving a finished shed is hard work.
- Clear plants and loose soil so the pad sits on flat, firm ground.
- Crown every skid up. The floor weight will flatten it.
Step # 5: Frame and Raise the Walls
- Frame each wall flat on the floor with 2×4 studs 16 in on center, with headers over the door and window openings.
- The door rough opening is 5′ 0″ wide by 6′ 4 1/2″ tall.
- Raise each wall with helpers (the plan says how many for each wall), check it plumb with a level, brace it and nail the corners together.
- Cover the walls with 5/8 in T1-11 siding. The plan gives the size of every sheet.
Step # 6: Frame the Roof
- Set the 2×6 ridge and the common rafters that hold it.
- Add the four hip rafters from the wall corners to the ridge.
- Fill in the jack rafters between the hips and the walls, in matching pairs.
- The eaves overhang 12″ on all four sides.
Step # 7: Sheathe and Shingle the Roof
- Nail 7/16 in OSB over the rafters.
- Add roofing felt and drip edge, then the asphalt shingles. Follow the shingle maker’s instructions.
Step # 8: Door, Window and Trim
- Build the door from the plan and hang it.
- Set the windows in their framed openings by the maker’s instructions.
- Add the fascia, soffit and corner trim.
Step # 9: Finishing Touches
- Paint or stain all exposed wood to protect it from the weather.
- Add shelves and hooks to suit what you store.
Want every measurement? The full 8×8 Hip Roof Storage Shed Plan PDF has the shopping list, the cut list and 19 build steps with drawings.
Ready to build the 8×8 hip roof shed?
$19.99 for the full PDF: every step, cut and board. 30-day money-back guarantee.