Hip roof · 160 sq ft
8x20 Hip Roof Shed Plan
Build this 8x20 hip roof shed yourself. Every board, cut and step, drawn in 3D across 72 pages.
- 30-day money-back guarantee
- PDF by email right after checkout
- Visa, Mastercard, Amex, PayPal
- Full material and shopping list
- Cut list with every length
- Step-by-step 3D views, 72 pages
- Phone, tablet, PC and Mac

This 8x20 hip roof shed plan from 3DSHEDPLANS builds a 160 sq ft storage shed, 20 ft wide by 8 ft deep, with a 6 ft double door, a ramp, a 24 x 36 in window in each end wall and a 6/12 roof with 12 inch eaves all round. The 72-page PDF has 19 step sections.
Get the full plan PDF for $19.99 or download the free preview
What builders say
The illustrations are fantastic, and the shopping list helped me buy the right materials. It took me five days to build my shed.
Pre-built sheds were hundreds of dollars. The plan laid everything out perfectly, and I saved hundreds in the process.
I worked as a joiner's assistant for three years and was skeptical. The plan was well laid out and beautifully illustrated.
The full plan is $19.99 as an instant PDF download. To see the drawing style first, open the free 8×20 hip roof shed plan PDF.
8×20 hip roof shed plan: the numbers for a site check
| Check | 8×20 Hip Roof Shed |
|---|---|
| Walls | 20′ 0″ wide x 8′ 0″ deep, 160 sq ft of floor |
| Roof footprint with overhangs | 22′ 1 1/2″ x 10′ 1 1/2″ to the fascia faces (1′ 0″ eaves on all four sides) |
| Gravel pad | 22′ 0″ x 10′ 0″ inside a pressure-treated 4×6 frame, 4″ of 3/4″ stone (4.1 cu yd loose), plus an 8′ 9″ wide landing in front of the door |
| Floor height | Top of the deck 9 3/4″ above the ground |
| Wall height | 7′ 10 1/2″ (7′ 6″ studs), top of the walls 8′ 8 1/4″ above the ground |
| Overall height | 10′ 11 5/16″ above the ground, top of the ridge shingles |
| Roof | Hip, 6/12 (26.6 degrees), 2×6 ridge 12′ 1 1/2″ long, 2×4 commons and jacks, 2×6 hips |
| Door rough opening | 6′ 0″ wide x 6′ 4 1/2″ tall, double door centered in the 20 ft front wall, swings out |
| Window rough openings | 2, each 24″ x 36″, one in each 8 ft end wall at its front end |
| Roof vents | 2 static louvers high on the back plane, plus a 1/4″ screened gap under the soffit on all four eaves |
| Ramp | Detachable pressure-treated ramp, 6′ 9″ wide, 3′ 6″ out, 1:6 slope |
| Crew and time | Two people, about 64 hours |
A hip roof overhangs all four walls, so stake out the 22′ 1 1/2″ x 10′ 1 1/2″ roof outline on your lot, not just the walls, and leave room to walk around it with a ladder. The pad is 1 ft bigger than the walls on every side, so its own diagonals are 24′ 2″, not the shed’s 21′ 6 1/2″. Square the pad frame to the first number and the floor frame to the second. The fit page also asks for 10′ 0″ clear and level in front of the wall (the ramp and one mower length) if you need to line up a tractor.
How the 8×20 hip roof shed goes together
| Stage | What the plan uses | Time for two |
|---|---|---|
| Site and foundation | Compacted gravel pad in a 4×6 frame, three spliced 20 ft pressure-treated 4×4 skids | 5 h |
| Floor frame and deck | Pressure-treated 2×6 joists 16″ on center, spliced rims, 3/4″ tongue and groove plywood | 7 h |
| Walls | 2×4 studs 16″ on center, front and back walls in two sections, raised as bare frames, then sided with 5/8″ T1-11 | 16 h |
| Roof framing | 2×6 ridge on two temporary posts, 2×4 commons and jacks, 2×6 hips, rafter ties, king tie | 11 h |
| Sheathing and roofing | 7/16″ OSB, drip edge, 15 lb felt, 2 roof vents and 3-tab asphalt shingles | 13 h |
| Door, windows and trim | T1-11 double door, 2 prefabricated windows, fascia, sloped soffit, 1×4 trim, paint | 12 h |
The plan runs in a fixed order: preparation and ground breaking (step 9), skids (10), floor frame (11), decking (12), anchoring the shed (13), the four walls (14 to 17), joining them (18), the door (19), the roof framing plan (20), commons and ridge (21), hips (22), jacks (23), fascia and soffit (24), sheathing, felt and shingles (25), trim, windows and finish (26) and the ramp (27). Section 28 covers weather, snow and upkeep, and a printable build checklist lists each stage with a “date done” and a “checked by” column.
Site layout, gravel pad and skids
Stake the corners 20′ 0″ along the front and 8′ 0″ along the sides, and move one stake until both diagonals read 21′ 6 1/2″. The plan has you dig 4″ deep over a 22′ 11″ x 10′ 11″ area, the outside of the pad frame, and on out in front of the door for the ramp and a 3 ft landing: 9′ 8″ wide, centered on the door, reaching 7′ 2 1/2″ out from the front wall. Digging moves the stakes, so set them again and recheck. On a sloped yard the plan shows how to measure the fall with a string and line level first, and when to build the stone up or dig the high side down.
The frame is pressure-treated 4x6s laid flat, rated for ground contact (UC4A or higher), on a 1/2″ stone bed so it finishes level with the lawn. Its inside is the 22′ 0″ x 10′ 0″ pad plus a landing 8′ 9″ wide that reaches 5′ 9″ past the front of the pad. The sides are 10′ 0″ each, the back is two 11′ 5 1/2″ pieces butted end to end, and the front is two 6′ 7 1/2″ pieces, one each side of the landing. Square it until both pad diagonals read 24′ 2″, join each corner with 2 galvanized 10″ timber spikes, pin it with 32 rebar stakes, then fill it with 4″ of 3/4″ crushed stone compacted in two layers. The cutting plan gets every frame piece out of one 10 ft, two 12 ft and three 16 ft 4×6.
Three ground-contact pressure-treated 4×4 skids run along the 20 ft side, the outer two flush with the floor edges and the middle one centered, 3′ 10 1/4″ on center (3′ 6 3/4″ clear between neighbors). At 20′ 0″ each skid is longer than a 16 ft board, so it is spliced from two whole boards, a 12 ft and an 8 ft, with their factory ends kept: counting from the front, skids 1 and 3 are 8′ 0″ + 12′ 0″ from the left end, and skid 2 is 12′ 0″ + 8′ 0″. That puts the joints at 8 ft and 12 ft, 4 ft apart, each centered under a floor joist. Each joint butts on the gravel with a 3 ft pressure-treated 2×4 scab on both sides, six nails per scab. Set every skid crown up and level it along its length and against the others, with gravel or treated shims under a low one, never untreated wood.
Floor frame and decking
The floor frame is sixteen 7′ 9″ joists between two 20′ 0″ rims, all pressure-treated 2×6. Clamp the rims together and mark both at once from the building’s left end: a joist flush at each end, then lines at 15 1/4″, 31 1/4″, 47 1/4″ and every 16″ on. The rafter marks later start from the same corner.
Each rim is also longer than a 16 ft board, so it is cut as 9′ 4 3/4″ + 10′ 7 1/4″. Both rims break at 9′ 4 3/4″ from the left end, over a doubled joist: a seventeenth joist on the list is nailed tight against the right face of the layout joist at 9′ 3 1/4″, so the joint falls on the seam between the two and each rim end gets three nails into a full joist.
Once nailed the frame weighs about 380 lb and racks out of square if you lift it, so you build it in place on the skids, push it until both diagonals read 21′ 6 1/2″, then toe-nail it down. A framing angle goes at every joist-to-skid crossing, 51 in all, with 8 connector nails each. On the outer skids the rim covers the joist end, so those angles sit against the inside face of the rim, right beside each joist.
Five sheets of 3/4″ tongue and groove plywood cover the deck, cut to a lettered map (pieces A to F). You start at the front left corner with piece A, 7′ 11 7/8″ x 4′ 0″, and the second row starts with piece D, 3′ 11 7/8″ long, so the end joints are staggered and land on joists. With sheets that cover 47 1/2″ once the tongue is in its groove, two full rows cover 7′ 11″ of the 8 ft frame. The last 1″ along the back rim gets a filler strip ripped from three 6′ 8″ 1x4s, glued and screwed flush with the rim, and the back wall’s bottom plate covers it. Rip the tongue off the back row first; every other edge keeps its tongue and groove, so no blocking is needed under the seams. Pieces C and D share one sheet, and the plan warns that you run short if you cut them any other way.
Anchoring the shed before the walls go up
The plan figures that, empty, this 10′ 11 5/16″ tall shed on loose skids slides at about 9 psf of wind (gusts near 55 mph) and tips at about 14 psf, and that the bare walls and the sided box catch that wind for days before the roof is on. So in step 13, right after the deck, you set 8 screw-in auger ground anchors, 30″ or longer, with galvanized straps: 4 along each outside skid, at 1′ 0″, 6′ 3″, 13′ 0″ and 19′ 0″ from the left end. That keeps them no more than 8 ft apart, and each sits 3″ or more clear of the splice scabs, tight to the skid itself.
An auger will not start in 4″ of compacted stone, so you dig the stone back to the soil at each spot, turn the anchor in with a steel bar through its eye in half turns, and rake the stone back. Each strap runs up the skid’s outside face onto the rim, fastened with 1 1/2″ structural screws, 4 into the skid and 2 into the rim (48 screws in all), and ends at least 3 11/16″ below the deck so the siding, which stops 3 3/16″ below the deck, covers it. The front anchor at 13′ 0″ lands in front of the door, behind the ramp, and the ramp ledger later screws on beside its strap. Check your local permit office for what your area asks.
Walls: framing order and lift weights
Each wall is framed flat on the deck, checked by its diagonals and raised as a bare frame. The 20 ft front and back walls are framed and raised in two sections each, so two people can lift every piece. The siding goes on after all four walls stand.
| Order | Wall | Studs at 7′ 6″ | Bare frame weight |
|---|---|---|---|
| 1 | Back wall, 20 ft, no openings, 2 sections (10′ 7 1/4″ and 9′ 4 3/4″) | 19 (including 2 joint studs and 2 corner backers) | About 130 lb and 110 lb |
| 2 | Front wall with the door, 2 sections (14′ 0 3/4″ and 5′ 11 1/4″) | 17 (including 2 kings, 2 joint studs and 2 corner backers, plus 2 trimmers and 4 cripples) | About 190 lb (the heaviest lift) and 80 lb |
| 3 | Left wall with a window | 7 (including 2 kings) | About 120 lb |
| 4 | Right wall with a window | 7 (including 2 kings) | About 120 lb |
- Back wall at its own edge. It is laid flat with its bottom plate 3 1/2″ back from the back edge of the deck. It tips up on the plate’s inside edge, the wall’s thickness swings out, and it lands flush. Flat it is 7′ 9″ plate to plate, so its top plate hangs 1/2″ past the front edge on blocks, and its lifters start on the ground.
- Front wall framed the other way. With the back wall standing, only 7′ 8 1/2″ of deck is free, too little to frame the front wall at its own edge. The plan frames it facing the other way, bottom plate 6″ from the standing back wall and top plate hanging 6 1/2″ past the front edge. You tip each section up there, then two people walk it upright across the deck on its bottom plate to the front edge, with its diagonal brace still nailed on. Never lift it off the deck.
- Sections side by side. Each section has its own plate pieces and a joint stud at the end that meets the next. You raise section 1 first, then the next tight against it, clamp the two joint studs flush and nail them together every 12″.
- Stop blocks at the edge. Two 12″ 2×4 offcuts nailed to the rim for each section, 2″ above the deck, keep each bottom plate from kicking out over the edge.
- Nobody in front. A wall that goes past plumb falls outward, off the deck, so nobody stands on the ground in front of it. Pick a calm day and brace it at once, from the outside, with 12 ft 2x4s to stakes about 5 ft out.
- End walls drop in. They are framed flat between the standing front and back walls. Their plates are 7′ 4 3/4″, 1/4″ shorter than the gap, so plumb the front and back walls first. Each end wall is pushed tight to the front wall, and the gap stays at the back corners, where it gets a shim at each screw.
The section diagonals are 13′ 1 5/8″ and 12′ 2 1/8″ on the back wall, 16′ 0 11/16″ and 9′ 9 1/8″ on the front, and 10′ 8 9/16″ for each end wall. The corners are screwed from inside with 3″ exterior screws every 12″. The second top plates (19′ 5″ on the front and back, each in two pieces, and 8′ 0″ on the ends) lap every corner and bridge each section joint by at least 4′ 0″ on each side. Each T1-11 sheet (about 60 lb) stands on a 2×4 ledger while your helper holds it plumb. On the front and back the sheet joints fall at 4′ 0″, 8′ 0″, 12′ 0″ and 16′ 0″ from the corner, and on the ends at 4′ 0″, each on a stud. Before a wall is sided, its plumb braces move inside (cut to 8′ 7″, the foot on a deck cleat about 3′ 5″ out), and they come off as soon as that wall is sided.
Door and windows: sizes and positions
The door opening is 6′ 0″ wide and 6′ 4 1/2″ tall, from 7′ 0″ to 13′ 0″ measured from the left corner, so it sits centered with 7′ 0″ of wall each side. It sits under two 6′ 3″ 2x8s with 1/2″ plywood between them. The front wall’s section joint falls at 14′ 0 3/4″, to the right of the door. Once the bottom plate is cut out the framed height is 6′ 6″, with 6′ 5 1/4″ clear under the head stop.
The two leaves come from two new T1-11 sheets, because the cut-out is too short. Each is 2′ 11 5/8″ wide and 6′ 5 1/4″ tall, with a glued and screwed 1×4 frame (two 6′ 5 1/4″ stiles, three 2′ 4 5/8″ rails, the middle one centered 3′ 2 5/8″ from either end) and two Z braces, 3′ 5 5/16″ along either edge, cut with the miter saw at 36 degrees. Three T-strap hinges hang each leaf on 1/4″ carriage bolts with the nuts inside, so nobody can unscrew the door from outside. The left leaf is active, with the latch on the middle rail 3′ 3 1/8″ above the deck; the right leaf closes on two barrel bolts and carries the 1×2 astragal. Brush sweeps (2′ 11 1/16″ and 2′ 10 13/16″) close the gap under the leaves, and an aluminum threshold cap, cut to 6′ 0″, covers the deck edge with no threshold board, so wheels roll straight in. A 6″ hook and eye, 36″ above the deck, holds each open leaf against the front wall in wind.
The windows are prefabricated units for 24″ x 36″ rough openings, one at the front end of each 8 ft end wall: 1′ 0″ to 3′ 0″ from the front end of the right wall’s plate, and 4′ 4 3/4″ to 6′ 4 3/4″ from the back end of the left wall’s 7′ 4 3/4″ plate, which puts both 1′ 0″ from the front end of the plate. Each sill top is 3′ 6″ above the bottom plate, under a header of two 2′ 3″ 2x6s with plywood between. Each opening is wrapped with flashing tape, and a drip cap goes over every head casing: 6′ 9″ over the door and 2′ 9″ over each window.
What is on the 8×20 hip roof shed material list
The shopping list is split by section, so you can buy the base first and the roof later:
| Section | Main items and counts |
|---|---|
| Foundation and floor | 6 pressure-treated 4x4s (three 12 ft, three 8 ft) for the three spliced skids, 2 pressure-treated 2×4 x 10 ft for the 6 splice scabs, 21 pressure-treated 2x6s (two 12 ft and two 10 ft for the rims, 17 at 8 ft for the joists), 5 sheets of 3/4″ tongue and groove plywood, 3 1×4 x 8 ft for the filler strip, 4.1 cu yd of stone, the pad frame (one 10 ft, two 12 ft and three 16 ft pressure-treated 4×6) with 32 rebar stakes and 16 timber spikes |
| Walls | 2×4 plates and studs for four walls, a doubled 2×8 door header, two doubled 2×6 window headers, 14 sheets of 5/8″ T1-11 |
| Roof framing | 22 commons from eleven 12 ft boards, a 14 ft 2×6 ridge, 4 2×6 hips on 8 ft boards, 16 jacks in two lengths, 8 tail jacks, 10 rafter ties, two king tie pieces, two temporary 12 ft 2×4 ridge posts with 4 braces |
| Roof covering | 11 sheets of 7/16″ OSB (10 plus 1 spare), 2 static roof vents, 2 rolls of 15 lb felt, 12 bundles of 3-tab shingles (starter and caps included), 8 pieces of drip edge |
| Fascia, door, windows and trim | 6 1×6 x 12 ft fascia boards, 4 sheets of 1/2″ plywood for the soffit, 2 new T1-11 sheets for the leaves, 6 T-strap hinges with 18 carriage bolts, a handle and latch, 2 barrel bolts, 2 sweeps, 2 hold-open hooks, a threshold cap, 2 prefabricated windows, 1×4 casing and corner trim |
| Ramp | 2 pressure-treated 2×10 x 8 ft for the stringers, 4 pressure-treated 2×6 x 14 ft for the 8 deck boards, 2 pressure-treated 2×4 x 8 ft for the ledger and its filler, 12 structural screws, 2 hook-and-eye latches, 4 rolls of grit tape, 145 deck screws |
| Hardware and finish | 31 lb of 16d framing nails, siding, sheathing and roofing nails, 42 hurricane ties (skewable ones at the 4 hip corners), 51 framing angles, 4 strap ties plus a splice strap, 8 ground anchors with 48 structural screws, 9 tubes of adhesive, roofing cement, flashing tape, 2 rolls of insect screen, 5 gallons of paint |
The list also counts the temporary pieces people forget: 18 wall braces, 4 ridge post braces, the 12 brace stakes and the 16 deck cleats. The 1/2″ plywood strips that fill the headers are ripped from a soffit sheet, so the plan tells you to buy that sheet with the walls. The lumber yard order at the end adds every section into one list for the counter: 74 eight-foot, 18 ten-foot, 36 twelve-foot, 4 fourteen-foot and 3 sixteen-foot 2x4s, and 16 sheets of T1-11, which is the 14 for the walls plus the 2 for the door leaves. It suggests 2 or 3 spare studs for bad boards on top.
Cut list and cutting plan
The cut list gives every part’s lumber, length and count: skids and rims at 20′ 0″ overall with their splice pieces, joists at 7′ 9″, studs at 7′ 6″, the ridge at 12′ 1 1/2″, commons at a 5′ 8″ board, hips at a 7′ 6 13/16″ board, jacks at 2′ 8 11/16″ and 4′ 2 5/8″, tail jacks at 1′ 2 13/16″ and rafter ties at 8′ 0″. The front and back wall plates are spliced too (14′ 0 3/4″ + 5′ 11 1/4″ on the front, 10′ 7 1/4″ + 9′ 4 3/4″ on the back). Trim, door, ramp and pad frame parts are on it as well.
The cutting plan says which board each part comes from and what is left. Two commons come out of each 12 ft 2×4, four of the short jacks out of a 12 ft and two of the long ones out of a 10 ft. All 8 tail jacks come from the offcuts of the two window sills, so no board is bought for them, and each window’s short cripple over the header comes from its trimmer board’s offcut. Both end wall cap plates must be full 96″ boards, not 92 5/8″ precut studs. Rows marked “factory ends kept” tell you to pick boards with square, clean ends. The roof sheathing has its own plan: 10 sheets cut to a lettered map, the small pieces from the big pieces’ offcuts, plus 1 spare kept whole.
Why the 8×20 hip roof has a 12 ft ridge on two posts
On a square shed the four hips meet at one point. This shed is 20 ft wide and only 8 ft deep, so the roof planes on the 20 ft walls run up to a long ridge instead: a 2×6, 12′ 1 1/2″ long, its ends 3′ 11 1/4″ in from the outside of each end wall. The two long planes are trapezoids and the two end planes are small triangles, all at 6/12.
The commons sit at 4′ 0″, 5′ 4″, 6′ 8″, 8′ 0″, 9′ 4″, 10′ 8″, 12′ 0″, 13′ 4″, 14′ 8″ and 16′ 0″ from the corner along the front and back walls, 16″ apart, so the ridge carries ten pairs, the end pairs flush with the ridge ends, plus a king common at the middle of each end wall. Jacks sit at 1′ 4″ and 2′ 8″ from every corner, and every sheathing joint still lands on a rafter.
Each 9′ 7 5/16″ 2×4 post stands on the deck on the shed’s center line, about 12″ in from a ridge end, with its back face 3/4″ behind the center line. Two braces per post, one each way, run to cleats screwed to the deck, 4 braces and 4 cleats in all. A 12″ cleat, cut from the post board’s 2′ 4 9/16″ offcut, stands 4″ above each post top, and the ridge sits on the posts tight to the cleats, 2″ of post showing in front, with three screws through each cleat.
How the 8×20 hip roof is framed: ridge, commons, hips and jacks
The plan frames the roof in a fixed order and says who stands where:
- Ridge on two posts. The ridge (about 24 lb) goes up with two people, each on an 8 ft step ladder on the deck beside a post, no higher than the third step from the top. Its top sits 2′ 2 5/16″ above the plates and 10′ 0 13/16″ above the deck, a little above eye level from there. You lift it together, one end each, set it against the cleats, and each person screws their own end.
- Commons in pairs. Cut a pattern common (board 5′ 8″, top edge 5′ 6 1/4″, seat 2 1/2″, heel 1 1/4″, a notch 32% of the depth), test it on both sides of the ridge, then cut 22: 20 for the front and back and 2 kings. Set the pairs at both ridge ends first, check the ridge for level and center, then fill in the middle pairs. Each common weighs about 7 lb; one person on the ladder by the ridge nails the top, the other on a step ladder at the wall sets the seat. The plate is 7′ 10 1/2″ above the deck, so never set or nail a seat from the deck, and never from the ladder at the ridge.
- Ties and kings. A 2×4 rafter tie, 8′ 0″, goes on the right face of each pair, 10 in all, with its top corners clipped 1″ by 2″ so it stays under the sheathing. The hurricane tie takes the left face. The two king commons butt the ridge ends and are toe-nailed to them with three nails.
- Four hips. Each 2×6 hip runs at 45 degrees in plan from a corner to a ridge end, sloping 19.5 degrees, top edge 1′ 6″ of tail plus 5′ 10 7/8″ (7′ 4 7/8″ in all). Its seat drops 1/4″ so its top corners stay in the roof planes, its top is 2 3/8″ above the plate, both ends get double 45 degree cheek cuts, and the tail is ripped 2 1/16″. A strap tie goes across the lapped plates at each corner first, because the strap cannot go on once the hip is in. Two people set each hip (about 15 lb): one beside the ridge end holds the V point in the corner between the end common and the king, the other inside the wall corner sets the seat. Nobody works from outside the walls until the fascia step.
- Jacks, then the posts come out. 16 jacks in two lengths, the long one 1′ 5 7/8″ longer than the short, with 45 degree side cuts in two hands, 4 of each hand per length. Nail them in pairs either side of a hip, then back out the cleat screws and take both posts out.
- King tie. With the posts out, a 2×4 on edge runs from king to king on top of the rafter ties, in two pieces (8′ 8 1/4″ and 9′ 9 1/4″), each starting 9 1/4″ in from its end wall. They butt over the middle of the rafter tie 9′ 5 1/2″ from the left corner and are joined with a 24″ strap. The rafter ties hold the long walls; this holds the end walls.
- Tail jacks. Eight short tail jacks fill the eave between each hip tail and the first jack, centered on the line of the crossing wall’s outside face, nailed through the side cut into the hip. The fascia and sheathing then hold their tails.
The hip seat notch is 3 7/16″ of a 5 13/16″ plumb depth, 59%, far past the one-third the commons keep. The plan explains in step 22.4 that the seat sits right over the lapped plates at the corner, so the notch carries no bending, and the tie, toe-nails and strap hold it. Do not cut it deeper than drawn. For more on roof styles and roof framing in general, see our guide to building a shed roof.
Fascia, soffit, sheathing and shingles on a hip roof
A hip roof has eaves on all four sides and no rakes. The front and back fascia each run 22′ 1 1/2″ long point to long point, made from a 10′ 4 3/4″ and an 11′ 8 3/4″ piece joined with a 45 degree scarf centered on the rafter tail 9′ 4″ from the left corner. Each end fascia is one 10′ 1 1/2″ board. All four miter at 45 degrees over the hip tails. The 10 plywood soffit strips are 1′ 0 7/16″ wide, ripped from 4 sheets, and slope with the rafter tails. They meet at the corners on a cut line at 48.2 degrees to the strip’s edge, not 45, because they are sloped: you measure 11 1/8″ along the wall edge from the strip’s end and draw to the fascia edge.
The roof is about 246 sq ft. The sheathing map letters the pieces A to I: each long plane takes six pieces (A to F) and each end three (G, H and I up to the point), and the back and second end are mirror images. Every end joint lands on a rafter center. The drip edge goes on all four eaves before the felt, folded around each corner, and the felt runs from the eaves up with 2″ head laps and 4″ end laps, wrapping 6″ over each hip and the ridge. This roof takes 2 rolls.
Shingles run 14 courses up each plane at 5″ exposure, over a starter strip on all four eaves. Where a course meets a hip, let it run past, snap a line along the hip and cut it off from the top. About 101 cap pieces, cut three to a shingle from 34 shingles, cover the hips from the eaves up, and the ridge is capped last, starting at the end away from the prevailing wind, so its first pieces lap over the hip caps. Total: 12 bundles.
How the 8×20 hip roof shed is vented
A hip roof has no gable wall for a high vent, so this plan puts two static roof louvers near the top of the back plane. Air comes in low through a 1/4″ gap left at the siding under the soffit strips, backed with insect screen stapled to the underside of the tails, all the way around the four eaves.
The vents go in two bays of the back commons, counted from the left end: between the 3rd and 4th commons (7′ 4″ from the left end wall to the bay center) and between the 7th and 8th (12′ 8″). Once the felt is on, you measure 2′ 7″ down from the top of the ridge along the underside of the sheathing and drill a 1/4″ locator hole up through it, centered in the bay. The bay is 1′ 2 1/2″ clear, so no rafter is cut. On the roof you cut the hole with a jigsaw, shingle up to it, set the louver in roofing cement with its lower flange on top of the shingles below, nail only the top and side flanges, and let the next courses lap over them.
The plan shows its arithmetic and calls it a common attic rule of thumb, not a shed requirement: floor area divided by 150 is about 154 sq in, about half low and half high. Two louvers rated 60 sq in each give 120 sq in high, and the screened soffit gap, 672″ long, gives about 84 sq in low once you halve it for the screen, 204 sq in in all. The total, the low side and the high side all meet that rule of thumb. If you plan to heat or insulate the shed, check your local permit office about venting.
What you can fit in an 8×20 hip roof shed
The plan’s “What fits inside” page draws the room from above, 19′ 5″ across and 7′ 5″ deep inside, with 7′ 7 1/2″ of clear height under the top plates:
- A 42″ deck riding mower, nose in. With both leaves open the door is about 5′ 11 1/2″ clear, so a 42″ deck (4′ 7 3/16″ wide) clears each side by 8 1/8″. The plan adds that a 48″ deck fits with its deflector raised and a 54″ deck does not. Measure your own mower before you buy.
- A narrow aisle behind it. The room is only 7′ 5″ deep, so parked with its nose about 1″ off the back wall, the 5′ 10″ mower leaves about 1′ 6″ of cross aisle behind its tail.
- A wheelbarrow and two bikes. The drawing also places a wheelbarrow (2′ 2″ x 5′ 0″) and two bikes with their handlebars staggered (2′ 6″ x 5′ 10″).
- Shelves, yours to add. It leaves room for 12″ deep shelves on the back wall in 2 ft runs, with the mower parked between them. They are not on the shopping list.
- A ramp. The deck sits 9 3/4″ above the gravel, so wheels need the ramp from step 27: 6′ 9″ wide, 3′ 6″ out at 1:6 (9 degrees), eight stringers 11 3/8″ on center under eight 2×6 boards. Its top sits about 13/16″ below the deck, and the leaf swings out over it with 1 1/4″ to spare. Set the mower deck to its highest cut before you take it up.
- Headroom under the ties. The rafter ties sit on the plates, 7′ 10 1/2″ above the floor, and the king tie stands on them. Above them the roof is open to the ridge, so stand long items against a wall.
The ramp is cut from four 3′ 6″ pieces of pressure-treated 2×10, each ripped on a taper from 7 1/2″ to 1/2″ so one piece gives two stringers. The bottom board is ripped to 2 15/16″ with a 1″ bevel at its toe. The front skid’s splice scab stands 1 1/2″ proud where the ramp goes, so a flat pressure-treated 2×4 filler, notched 1 1/2″ deep over the scab for its first 2′ 10 1/2″, goes on first, and the 6′ 9″ ledger screws on over it with 6 structural screws into the rim and 6 into the skid. Two hook-and-eyes hold the ramp to the ledger, so you can unhook it and lift it away to level or move the shed. An open slot of about 2 5/8″ stays between the top board and the siding; the plan says to keep it swept out and lay a scrap of plywood across it for a small caster or a hand truck.
Hip roof on an 8×20 shed: what it costs you and what it gives
A hip roof takes more cutting than a gable roof: four hips with double cheek cuts and a deep seat, 16 jacks in two lengths and two hands, 8 tail jacks, a king tie in two pieces, soffit corners cut at 48.2 degrees and two vent holes in the back plane. It also covers more roof, about 246 sq ft here under 11 OSB sheets and 12 bundles, because the eave runs around all four sides. The roof framing alone is about 11 hours for two, and the sheathing, felt and shingles another 13.
In return there are no gable triangles to frame and side, no rakes, and an eave over every wall that keeps rain off the siding on all four sides. The roof tops out at 10′ 11 5/16″, about 2′ 3″ above the 8′ 8 1/4″ top of the walls. A hip roof generally holds up to wind better than a gable roof, according to the Building America Solution Center guide to hip vs gable roofs. If you would rather frame two flat gable ends, the 8×20 gable shed plan builds on the same footprint, and the 8×20 lean-to shed plan has a single slope.
Tools, ladders and fasteners the plan lists
Beyond a circular saw with a rip guide, a speed square, a framing square, a drill/driver and a framing hammer, the tool list adds:
- a miter saw for the door braces (set to 36 degrees) and the trim
- a reciprocating saw or oscillating tool for flush cuts at the threshold and the window openings
- a jigsaw and a drill with a 1/4″ bit for the roof vent holes and their locator holes
- a 3 lb sledge for the pad frame spikes and stakes, and two 24″ bar clamps for marking the rims together
- a 4 ft level, an 8 ft straight board, a string line with a line level and a hand tamper
- a steel bar or pipe, about 3/4″ x 3 ft, for turning the ground anchors
- two 8 ft step ladders, which reach the ridge, and a 16 ft extension ladder for roof work from the eave, about 8′ 8″ up; extended it is about 13 ft long and reaches about 4′ 0″ past the edge
The fastener schedule gives the nail and count for every joint, from three 16d nails per joist at the rims to three nails through the side cut of every jack and eight clinched nails at each king tie end. The list counts 31 lb of 16d framing nails, about 1100 nails plus 10%. For roof work the plan has you screw a 2×4 foot stop through the sheathing into four or more rafters before you work above it, and never to work on the roof alone.
Free 8×20 hip roof shed plan PDF vs the full plan
The free PDF is a streamlined version: the five stages (site and foundation, floor, walls, roof, trim and paint) with 3D views and framing previews, and a table of what the full plan adds. It has no material list, no cut list and no measurements.
The full 72-page plan adds every step, the spliced skid and rim layouts, every wall section drawn stud by stud, the roof framing plan with each rafter center, the ridge post figure and its braces, the hip and jack cut marks, the sheathing map and its sheet cutting plan, the roof vent layout, the ramp, the “What fits inside” page, the shopping list and the cut list. It also lists the 106 checks it passed before going on sale, from walls and openings (55 checks) and roof framing (22) to sheets and shingles that cover every surface and drawings that agree with the lists.
Before you build an 8×20 hip roof shed
- Permits. At 160 sq ft and 10′ 11 5/16″ tall, this shed can run into size, height or setback limits, and rules vary by town and HOA. Check your local permit office before you buy lumber, and use our shed permit checklist to know what to ask. Call 811 a few working days before you dig.
- Snow and wind. The plan uses common small-shed framing. In heavy snow or high-wind areas you may need closer rafter spacing or larger rafters; ask your local permit office about the loads for your address before you build.
- Skids. Use ground-contact rated pressure-treated 4x4s (UC4A or higher), set crown up, and keep the splice joints where the plan puts them. Our shed foundation guide compares bases if you are still choosing one.
- Roof day crew. Line up a helper for the ridge, the commons and the hips, and two step ladders. Raise each wall section with two people, stand each ladder on firm, flat footing, stay off open rafters until the sheathing is on, keep ladders and sheets 10 ft from overhead power lines and never work on the roof alone. More habits that help are in our top 10 shed building tips.
- Materials. Store lumber flat and covered, since wet wood decays faster (USDA Forest Products Laboratory Wood Handbook). Check the stamp on each OSB sheet for its span rating (APA: OSB).
- Upkeep. Keep 6″ or more between the siding and the soil or mulch, keep the drip edges clear, and every spring check for lifted shingles, re-caulk the trim, touch up the paint and make sure the skids are still level and dry.
Related plans
- Same size with a different roof: the 8×20 gable shed plan, or a single slope, the 8×20 lean-to shed plan.
- 4 ft narrower on the same 8 ft end walls: the 8×16 hip roof shed plan, or 8 ft narrower, the 8×12 hip roof shed plan.
- Deeper on the same 20 ft front wall: the 10×20 hip roof shed plan or the 12×20 hip roof shed plan.
- Every hip roof shed plan in one place, or browse all shed plans.
Shed building guides
- 6×12 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×10 Firewood Shed Material List: Lumber, Slats, Hardware
- 8×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×8 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×12 Firewood Shed Material List: Lumber, Slats, Hardware
Frequently asked questions
How big is the 8×20 hip roof shed?
The walls are 20 ft wide by 8 ft deep, 160 sq ft of floor. With 12 inch eaves the roof covers 22 ft 1 1/2 in by 10 ft 1 1/2 in to the fascia. The ridge tops out 10 ft 11 5/16 in above the ground; check height limits with your local permit office.
Does the 8×20 hip roof have a ridge?
Yes. The shed is 12 ft wider than it is deep, so the four hips meet the two ends of a 12 ft 1 1/2 in 2×6 ridge. While you frame, it sits on two temporary 2×4 posts, each about 12 in in from a ridge end and braced both ways to the deck.
What is on the 8×20 hip roof shed material list?
Every item and quantity, by section: six pressure-treated 4×4 boards for three spliced 20 ft skids, 21 pressure-treated 2x6s for the floor, 5 floor sheets, 16 T1-11 sheets, 22 commons, 4 2×6 hips, 16 jacks, 11 OSB sheets, 2 roof vents, 2 rolls of felt, 12 shingle bundles, 2 windows, 42 hurricane ties, 8 ground anchors and the ramp lumber.
How long does it take to build the 8×20 hip roof shed?
The plan's stage times add up to about 64 hours for two people: 5 for the site and foundation, 7 for the floor, 16 for the walls, 11 for the roof framing, 13 for sheathing, felt and shingles and 12 for the door, windows, trim and paint.
Will a riding mower fit in the 8×20 hip roof shed?
The fit drawing parks a 42 inch deck rider nose in. With both leaves open the door is about 5 ft 11 1/2 in clear, so that deck clears each side by about 8 1/8 in. A 48 inch deck fits with its deflector raised; a 54 inch deck does not. Measure yours.
How is the 8×20 hip roof shed vented?
Air comes in low through a 1/4 in screened gap under the soffit around all four eaves and goes out high through 2 static roof louvers near the top of the back plane, each rated 60 sq in or more. If you plan to heat or insulate the shed, ask your local permit office.
More about the 8×20 hip roof shed plan
Build Your Own 8×20 Hip Roof Storage Shed With Ease!
A Hip Roof Shed, as the name implies, looks classy and at the same time can you give your garden or lawn extra space to store your supplies or hardware. Besides, if you are a hobbyist and you want your very own personal space to work, then having a 8×20 Hip Roof Storage Shed is probably the best idea! So wait no more – order now and start building today…
Shed Plan Includes:
A Full-Fledge Material List with Required Quantity
The materials you use to build a shed are the secrets to your success. Unfortunately, most plans out there won’t precisely tell you what to buy and in what quantity. In fact, they would lure you to buy products from the plan-sellers. Luckily, we have a completely different motto. We want you to succeed in building your dream shed. And for that, we understand how important it is to get the right materials.
Our 8×20 Hip Roof Storage Shed Plan comes with an all-inclusive list of materials, hardware and tools that you would need to build the shed. Nothing more, nothing less! No click baits! You get a printable list of materials that you can take to the hardware store.
Shed Plan Includes:
Simple, Easy to Understand Step by Step Instructions
Who would have ever thought to get their hands on a shed plan that would take them through the entire process with such ease! Our 8×20 Hip Roof Storage Shed Plan comes with easy to understand, step by step instructions for DIY newbies. Don’t worry if you don’t have any experience in building wooden structures. The plan takes you through it in plain words, without jargon. Right from building the foundation to the walls and even the roofing, we have everything covered for you.
Shed Plan Includes:
3D Rendered Images for Reality Check
2D images are a thing of the past! Our 8×20 Hip Roof Storage Shed Plan comes with 3D rendered images, which means you get to see every corner, every angle and every inch clearly as if it is being right in front of you by a professional. You won’t have to scratch your head thinking how the shed should from the front, back or the sides. Even the rooftops are visualized in 3D for better understanding.
Building Your Own Shed vs. Getting Professional Help
1st Reason
You Save What a Builder Would Charge
Probably the most important reason for building your own shed is that you save money. A builder charges for labor on top of the materials, for work you can do yourself. With our 8×20 Hip Roof Storage Shed Plan, you get clear instructions, material lists and diagrams to go through the process easily.
2nd Reason
Choose Your Own Design and Make Your Dream Come True
Don’t fall for the marketing gimmicks of most professionals out there. When you start building your own shed, the world is out there for you to explore. With our material list and instructions, you will realize that you can build your dream shed without any design restrictions. The plan is simple yet it gives you the liberty to add in your own flavor!
3rd Reason
You Will Reclaim Your House Again
Our 8×20 Hip Roof Storage Shed has 120 sq ft of floor for your storage. Whether you garden or play sports, you can use the shed to keep all sorts of your equipment and tools. Besides, the shed will add an exquisiteness to your garden while fulfilling its purpose.
All the Other Reasons
This Is Exactly What You’ll Get with Your 8×20 Hip Roof Storage Shed Plan!
19 step-by-step sections that guide you through the whole process.
Designed for beginners as well as for the professionals.
Explanatory 3D images so you can see exactly what to do next.
Comprehensive materials list that gives you exactly what you need.
Your plan will look great on any mobile device.
PRO-TIPS throughout the build.
High quality PDF plan with everything you need emailed to you instantly.
How to Build a 8×20 Hip Roof Shed: The Steps at a Glance
This is a short overview of how the 8×20 hip roof shed goes together. The full plan PDF has 19 build steps on 72 pages, with the cut length and count of every part, a shopping list with quantities and drawings for the steps.
Step # 1: Check the Rules Where You Live
Rules for sheds, such as size limits, setbacks and permits, vary by town and HOA. Check your local permit office before you build.
Step # 2: Know the Size of Your 8×20 Shed
The shed is 20 ft wide and 8 ft deep (160 sq ft of floor). The walls are 94 1/2″ tall including the plates, with a 6/12 roof. The roof peaks about 10′ 11 5/16″ above the ground. It has a double door in the front wall and 2 windows (24″ by 36″ rough openings). The plan estimates about 64 hours of work for two people.
Step # 3: Get the Tools and Materials
You need basic carpentry tools: a circular saw, a speed square, a drill/driver, a framing hammer or nailer, a 4 ft level and a tape measure. The main materials are pressure-treated 4×4 skids and 2×6 floor joists, 3/4 in tongue and groove plywood, 2×4 studs, 5/8 in T1-11 siding, 2×4 rafters, 7/16 in OSB, roofing felt, drip edge and asphalt shingles. The plan’s shopping list gives the quantity of each.
Step # 4: Build the Foundation and Floor
Lay a compacted gravel pad and set the pressure-treated 4×4 skids level in both directions. Build the floor frame from pressure-treated 2×6 joists 16 in on center, square it by measuring the diagonals, fix it to the skids, then glue and screw the 3/4 in tongue and groove plywood on top.
Important Tips:
- Build the foundation where the shed will stand. Moving a finished shed is hard work.
- Clear plants and loose soil so the pad sits on flat, firm ground.
- Crown every skid up. The floor weight will flatten it.
Step # 5: Frame and Raise the Walls
- Frame each wall flat on the floor with 2×4 studs 16 in on center, with headers over the door and window openings.
- The door rough opening is 6′ 0″ wide by 6′ 4 1/2″ tall.
- Raise each wall with helpers (the plan says how many for each wall), check it plumb with a level, brace it and nail the corners together.
- Cover the walls with 5/8 in T1-11 siding. The plan gives the size of every sheet.
Step # 6: Frame the Roof
- Set the 2×6 ridge and the common rafters that hold it.
- Add the four hip rafters from the wall corners to the ridge.
- Fill in the jack rafters between the hips and the walls, in matching pairs.
- The eaves overhang 12″ on all four sides.
Step # 7: Sheathe and Shingle the Roof
- Nail 7/16 in OSB over the rafters.
- Add roofing felt and drip edge, then the asphalt shingles. Follow the shingle maker’s instructions.
Step # 8: Door, Window and Trim
- Build the door from the plan and hang it.
- Set the windows in their framed openings by the maker’s instructions.
- Add the fascia, soffit and corner trim.
Step # 9: Finishing Touches
- Paint or stain all exposed wood to protect it from the weather.
- Add shelves and hooks to suit what you store.
Want every measurement? The full 8×20 Hip Roof Storage Shed Plan PDF has the shopping list, the cut list and 19 build steps with drawings.
Ready to build the 8×20 hip roof shed?
$19.99 for the full PDF: every step, cut and board. 30-day money-back guarantee.



