Hip roof · 168 sq ft
12x14 Hip Roof Shed Plan
Build this 12x14 hip roof shed yourself. Every board, cut and step, drawn in 3D across 70 pages.
- 30-day money-back guarantee
- PDF by email right after checkout
- Visa, Mastercard, Amex, PayPal
- Full material and shopping list
- Cut list with every length
- Step-by-step 3D views, 70 pages
- Phone, tablet, PC and Mac

This 12x14 hip roof shed plan from 3DSHEDPLANS builds a 168 sq ft storage shed, 14 ft wide by 12 ft deep, with a 6 ft double door, a ramp, a 3 ft square window in each side wall and a 6/12 roof with 12 inch eaves all round. The 70-page PDF has 19 step sections.
Get the full plan PDF for $19.99 or download the free preview
What builders say
A project for me and my son. The plan arrived in my email almost instantly, and everything we needed was included.
We aren't DIY-savvy and needed something simple. The plan was extremely well laid out and easy to follow.
A year ago I had only built flat-pack furniture. The plans are simple to follow, and you don't need years of experience.
The full plan is $19.99 as an instant PDF download. To see the drawing style first, open the free 12×14 hip roof shed plan PDF.
12×14 hip roof shed plan: the numbers for a site check
| Check | 12×14 Hip Roof Shed |
|---|---|
| Walls | 14′ 0″ wide x 12′ 0″ deep, 168 sq ft of floor |
| Roof footprint with overhangs | 16′ 1 1/2″ x 14′ 1 1/2″ to the fascia faces (1′ 0″ eaves on all four sides) |
| Gravel pad | 16′ 0″ x 14′ 0″ inside a pressure-treated 4×6 frame, 4″ of 3/4″ stone (4.1 cu yd loose), plus an 8′ 9″ wide landing in front of the door |
| Floor height | Top of the deck 9 3/4″ above the ground |
| Wall height | 7′ 10 1/2″ (7′ 6″ studs), top of the walls 8′ 8 1/4″ above the ground |
| Overall height | 11′ 11 5/16″ above the ground, top of the ridge shingles |
| Roof | Hip, 6/12 (26.6 degrees), 2×6 ridge 2′ 1 1/2″ long, 2×4 commons and jacks, 2×6 hips |
| Door rough opening | 6′ 0″ wide x 6′ 4 1/2″ tall, double door centered in the 14 ft front wall, swings out |
| Window rough openings | 2, each 36″ x 36″, one in each 12 ft side wall toward the front |
| Roof vent | None: a 1/4″ screened gap under the soffit on all four eaves |
| Ramp | Detachable pressure-treated ramp, 6′ 9″ wide, 3′ 6″ out, 1:6 slope |
| Crew and time | Two people (three for the ridge and first commons), about 68 hours |
A hip roof overhangs all four walls, so stake out the 16′ 1 1/2″ x 14′ 1 1/2″ roof outline on your lot, not just the walls, and leave room to walk around it with a ladder. The pad is 1 ft bigger than the walls on every side, so its own diagonals are 21′ 3 1/8″, not the shed’s 18′ 5 1/4″. Square the pad frame to the first number and the floor frame to the second. The fit page also asks for 9′ 6″ clear and level in front of the wall (the ramp and one mower length) if you need to line up a tractor.
How the 12×14 hip roof shed goes together
| Stage | What the plan uses | Time for two |
|---|---|---|
| Site and foundation | Compacted gravel pad in a 4×6 frame, four 14 ft pressure-treated 4×4 skids | 6 h |
| Floor frame and deck | Pressure-treated 2×6 joists about 15 1/4″ on center, 3/4″ tongue and groove plywood | 7 h |
| Walls | 2×4 studs 16″ on center or closer, raised as bare frames, then sided with 5/8″ T1-11 | 17 h |
| Roof framing | 2×6 ridge on one temporary post, 2×4 commons and jacks, 2×6 hips, rafter ties, king tie | 11 h |
| Sheathing and roofing | 7/16″ OSB, drip edge, 15 lb felt and 3-tab asphalt shingles | 14 h |
| Door, windows and trim | T1-11 double door, 2 prefabricated windows, fascia, sloped soffit, 1×4 trim, paint | 13 h |
The plan runs in a fixed order: preparation and ground breaking (step 9), skids (10), floor frame (11), decking (12), anchoring the shed (13), the four walls (14 to 17), joining them (18), the door (19), the roof framing plan (20), commons and ridge (21), hips (22), jacks (23), fascia and soffit (24), sheathing, felt and shingles (25), trim, windows and finish (26) and the ramp (27). Section 28 covers weather, snow and upkeep, and a printable build checklist lists each stage with a “date done” and a “checked by” column. The stage table notes that the ridge and first commons take three people, not two.
Site layout, gravel pad and skids
Stake the corners 14′ 0″ along the front and 12′ 0″ along the sides, and move one stake until both diagonals read 18′ 5 1/4″. The plan has you dig 4″ deep over a 16′ 11″ x 14′ 11″ area, the outside of the pad frame, and on out in front of the door for the ramp and a 3 ft landing: 9′ 8″ wide, centered on the door, reaching 7′ 1″ out from the front wall. Digging moves the stakes, so set them again and recheck. On a sloped yard the plan shows how to measure the fall with a string and line level first, and when to build the stone up or dig the high side down.
The frame is pressure-treated 4x6s laid flat, rated for ground contact (UC4A or higher), on a 1/2″ stone bed so it finishes level with the lawn. Its inside is the 16′ 0″ x 14′ 0″ pad plus a landing 8′ 9″ wide that reaches 5′ 7 1/2″ past the front of the pad. The back is two 8′ 5 1/2″ pieces butted end to end. Square it until both pad diagonals read 21′ 3 1/8″, join each corner with 2 galvanized 10″ timber spikes, pin it with 30 rebar stakes, then fill it with 4″ of 3/4″ crushed stone compacted in two layers. The cutting plan gets every frame piece out of five 16 ft 4x6s.
Four ground-contact pressure-treated 4×4 skids, each a single 14′ 0″ board, run along the 14 ft side. The outer two sit flush with the floor edges and the others are evenly spaced, 3′ 10 13/16″ on center, which leaves 3′ 7 5/16″ clear between neighbors. Each skid goes in crown up and is leveled along its length and against the others, with gravel or treated shims under a low one, never untreated wood.
Floor frame and decking
The floor frame is twelve 11′ 9″ joists between two 14′ 0″ rims, all pressure-treated 2×6. Clamp the rims together and mark both at once from the building’s left end: a joist flush at each end, then lines at 14 1/2″, 29 13/16″, 45 1/16″ and on to 152″, evenly spread and mirrored about the middle, about 15 1/4″ on center. The rafter marks later start from the same corner.
Once nailed the frame weighs about 370 lb and racks out of square if you lift it, so you build it in place on the skids, push it until both diagonals read 18′ 5 1/4″, then toe-nail it down. A framing angle goes at every joist-to-skid crossing, 48 in all, with 8 connector nails each. On the outer skids the rim covers the joist end, so those angles sit against the inside face of the rim, right beside each joist.
Six sheets of 3/4″ tongue and groove plywood cover the deck in three rows, cut to a lettered map (pieces A to G). You start at the front left corner with piece A, 7′ 7 1/2″ x 4′ 0″, and the second row starts with piece C, 3′ 9 11/16″ long, so the end joints are staggered and land on joists. Three full rows cover about 11′ 10 1/2″ of the 12 ft frame, so the plan has you rip two 7′ 0″ 1x4s to 1 1/2″ and glue and screw them to the back rim as a filler strip. The back row gets its tongue ripped off; every other edge keeps its tongue and groove, so no blocking is needed under the seams. Pieces C and E share one sheet, and the plan warns that you run short if you cut them any other way.
Anchoring the shed before the walls go up
The plan figures that, empty, this 11′ 11 5/16″ tall shed on loose skids slides at about 12 psf of wind (gusts near 60 mph) and tips at about 25 psf, and that the bare walls catch that wind for days before the roof is on. So in step 13, right after the deck, you set 6 screw-in auger ground anchors, 30″ or longer, with galvanized straps, 3 along each outside skid, at 1′ 0″, 7′ 0″ and 13′ 0″ from the left end.
An auger will not start in 4″ of compacted stone, so you dig the stone back to the soil at each spot, turn the anchor in with a steel bar through its eye in half turns, and rake the stone back. Each strap runs up the skid’s outside face onto the rim, fastened with 1 1/2″ structural screws, 4 into the skid and 2 into the rim, and ends at least 3 11/16″ below the deck so the siding covers it. The front anchor at 7′ 0″ lands in front of the door, behind the ramp, and the ramp ledger later screws on beside its strap. Check your local permit office for what your area asks.
Walls: framing order and lift weights
Each wall is framed flat on the deck, checked by its diagonals and raised as a bare frame. The siding goes on after all four walls stand.
| Order | Wall | Studs at 7′ 6″ | Bare frame weight |
|---|---|---|---|
| 1 | Back wall, 14 ft, no openings | 13 (including 2 corner backers) | About 160 lb |
| 2 | Front wall with the door | 10 (including 2 kings and 2 corner backers, plus 2 trimmers and 5 cripples) | About 190 lb (the heaviest lift) |
| 3 | Left wall with a window | 9 (including 2 kings) | About 160 lb |
| 4 | Right wall with a window | 9 (including 2 kings) | About 160 lb |
- Framed at its own edge. On this 12 ft deep deck every wall is laid flat with its bottom plate 3 1/2″ back from the deck edge it will stand on. It tips up on the plate’s inside edge, the wall’s thickness swings out, and it lands flush.
- Back wall first, then the front. The back wall gets the whole deck, and once it stands there is still room to frame the front wall at the front edge.
- Stop blocks at the edge. Two 12″ 2×4 offcuts nailed to the rim, 2″ above the deck, keep each bottom plate from kicking out over the edge as it tips up.
- Nobody in front. A wall that goes past plumb falls outward, off the deck, so nobody stands on the ground in front of it. Pick a calm day and brace it at once, from the outside, with 12 ft 2x4s to stakes about 5 ft out.
- Side walls drop in. They are framed flat between the standing front and back walls. Their plates are 11′ 4 3/4″, 1/4″ shorter than the gap, so plumb the front and back walls first. Each side wall is pushed tight to the front wall, and the gap stays at the back corners, where it gets a shim at each screw.
Wall diagonals are 16′ 0″ for the front and back walls and 13′ 9 3/8″ for each side wall. The corners are screwed from inside with 3″ exterior screws every 12″, and the second top plates (13′ 5″ on the front and back, 12′ 0″ on the sides) lap every corner. Each T1-11 sheet (about 60 lb) stands on a 2×4 ledger while your helper holds it plumb. On the front and back the sheet joints fall at 3′ 0″, 7′ 0″ and 11′ 0″ from the corner, and on the sides at 4′ 0″ and 8′ 0″, each on a stud. Before a wall is sided, its plumb braces move inside (cut to 8′ 7″, the foot on a deck cleat about 3′ 5″ out), and they come off as soon as that wall is sided.
Door and windows: sizes and positions
The door opening is 6′ 0″ wide and 6′ 4 1/2″ tall, from 4′ 0″ to 10′ 0″ measured from the left corner, so it sits centered with 4′ 0″ of wall each side. It sits under two 6′ 3″ 2x8s with 1/2″ plywood between them. Once the bottom plate is cut out the framed height is 6′ 6″, with 6′ 5 1/4″ clear under the head stop.
The two leaves come from two new T1-11 sheets, because the cut-out is too short. Each is 2′ 11 5/8″ wide and 6′ 5 1/4″ tall, with a glued and screwed 1×4 frame (two 6′ 5 1/4″ stiles, three 2′ 4 5/8″ rails, the middle one centered 3′ 2 5/8″ from either end) and two Z braces, 3′ 5 5/16″ along either edge, cut with the miter saw at 36 degrees. Three T-strap hinges hang each leaf on 1/4″ carriage bolts with the nuts inside, so nobody can unscrew the door from outside. The left leaf is active, with the latch on the middle rail 3′ 3 1/8″ above the deck; the right leaf closes on two barrel bolts and carries the 1×2 astragal. Brush sweeps (2′ 11 1/16″ and 2′ 10 13/16″) close the gap under the leaves, and an aluminum threshold cap, cut to 6′ 0″, covers the deck edge with no threshold board, so wheels roll straight in. A 10″ hook and eye, 36″ above the deck, holds each open leaf against the front wall in wind.
The windows are prefabricated units for 36″ x 36″ rough openings, one in each 12 ft side wall toward the front: 1′ 11″ to 4′ 11″ from the front end of the right wall’s plate, and 6′ 5 3/4″ to 9′ 5 3/4″ from the back end of the left wall’s 11′ 4 3/4″ plate, which puts both 1′ 11″ from the front end of the plate. Each sill top is 3′ 6″ above the bottom plate, under a header of two 3′ 3″ 2x6s with plywood between. Each opening is wrapped with flashing tape, and a drip cap goes over every head casing: 6′ 9″ over the door and 3′ 9″ over each window.
What is on the 12×14 hip roof shed material list
The shopping list is split by section, so you can buy the base first and the roof later:
| Section | Main items and counts |
|---|---|
| Foundation and floor | 4 pressure-treated 4×4 x 14 ft skids, 2 pressure-treated 2×6 x 14 ft rims, 12 pressure-treated 2×6 x 12 ft joists, 6 sheets of 3/4″ tongue and groove plywood, 2 1×4 x 8 ft for the filler strip, 4.1 cu yd of stone, the pad frame (5 sixteen-foot pressure-treated 4x6s) with 30 rebar stakes and 16 timber spikes |
| Walls | 2×4 plates and studs for four walls, a doubled 2×8 door header, two doubled 2×6 window headers, 14 sheets of 5/8″ T1-11 |
| Roof framing | 8 commons, a 2×6 ridge from an 8 ft board, 4 2×6 hips on 12 ft boards, 32 jacks in four lengths, 3 rafter ties, two king tie pieces, one temporary 12 ft 2×4 ridge post with 4 braces |
| Roof covering | 13 sheets of 7/16″ OSB (12 plus 1 spare), 2 rolls of 15 lb felt, 12 bundles of 3-tab shingles (starter and caps included), 7 pieces of drip edge |
| Fascia, door, windows and trim | 1×6 fascia in 8 and 10 ft boards, 3 sheets of 1/2″ plywood for the soffit, 2 new T1-11 sheets for the leaves, 6 T-strap hinges with 18 carriage bolts, a handle and latch, 2 barrel bolts, 2 sweeps, 2 hold-open hooks, a threshold cap, 2 prefabricated windows, 1×4 casing and corner trim |
| Ramp | 2 pressure-treated 2×10 x 8 ft for the stringers, 4 pressure-treated 2×6 x 14 ft for the 8 deck boards, a pressure-treated 2×4 ledger, 2 hook-and-eye latches, 4 rolls of grit tape, 141 deck screws |
| Hardware and finish | 27 lb of 16d framing nails, siding, sheathing and roofing nails, 44 hurricane ties (skewable ones at the 4 hip corners), 48 framing angles, 4 strap ties plus a splice strap, 6 ground anchors with 36 structural screws, 8 tubes of adhesive, roofing cement, flashing tape, 2 rolls of insect screen, 5 gallons of paint |
The list also counts the temporary pieces people forget: 12 wall braces, 4 ridge post braces, the brace stakes and the 12 deck cleats. The 1/2″ plywood strips that fill the headers are ripped from a soffit sheet, so the plan tells you to buy that sheet with the walls. The lumber yard order at the end adds every section into one list for the counter: 72 eight-foot, 23 twelve-foot and 16 fourteen-foot 2x4s, and 16 sheets of T1-11, which is the 14 for the walls plus the 2 for the door leaves. It suggests 2 or 3 spare studs for bad boards on top.
Cut list and cutting plan
The cut list gives every part’s lumber, length and count: skids and rims at 14′ 0″, joists at 11′ 9″, studs at 7′ 6″, the ridge at 2′ 1 1/2″, commons at a 7′ 10 13/16″ board, hips at a 10′ 6 13/16″ board, jacks at 2′ 6 7/8″, 3′ 11 1/16″, 5′ 3 1/8″ and 6′ 7 1/4″, tail jacks at 1′ 2 13/16″ and rafter ties at 12′ 0″. Trim, door, ramp and pad frame parts are on it too.
The cutting plan says which board each part comes from and what is left. Each common takes a full 96″ 8 ft board (not a 92 5/8″ precut stud), three of the shortest jacks come out of an 8 ft 2×4, two of the second length out of an 8 ft, two of the third out of a 12 ft and two of the longest out of a 14 ft. The 8 tail jacks and the window cripples cost no extra boards, since they come from the jack, sill, trimmer and cripple offcuts. Rows marked “factory ends kept” tell you to pick boards with square, clean ends. The roof sheathing has its own plan: 12 sheets cut to a lettered map, the small pieces from the big pieces’ offcuts, plus 1 spare kept whole.
Why the 12×14 hip roof has a short ridge on one post
On a square shed the four hips meet at one point. This shed is 14 ft wide and 12 ft deep, so the roof planes on the 14 ft walls run up to a short ridge instead: a 2×6, 2′ 1 1/2″ long, its ends 5′ 11 1/4″ in from the outside of each end wall. The two long planes are trapezoids and the two end planes are triangles, all at 6/12.
The commons sit at 6′ 0″, 7′ 0″ and 8′ 0″ from the corner along the front and back walls, 12″ apart, so the ridge carries three pairs, the end pairs flush with the ridge ends, plus a king common at the middle of each end wall. Jacks sit at 1′ 2 3/8″, 2′ 4 13/16″, 3′ 7 3/16″ and 4′ 9 5/8″ from every corner, about 14 3/8″ on center, and every sheathing joint still lands on a rafter.
The ridge is too short for two posts, so it gets one. The 10′ 7 5/16″ 2×4 post stands on the deck on the shed’s center line, its center 6′ 6″ from the left corner, halfway between two common pairs so the post and its cleat stay clear of every seat. Its back face sits 3/4″ behind the center line, and 4 braces, one from each side, run from 7 ft or more up the post to cleats screwed to the deck. A 12″ cleat, cut from the post board’s offcut, stands 4″ above the post top, and the ridge sits on the post tight to the cleat with three screws through it. That puts the post 6 3/4″ from the ridge’s left end, and the ridge reaches about 1′ 6 3/4″ past it on the other side.
How the 12×14 hip roof is framed: ridge, commons, hips and jacks
The plan frames the roof in a fixed order and says who stands where:
- Ridge on one post. The ridge (about 4 lb) goes up with one person on an 8 ft step ladder on the deck beside the post, no higher than the third step from the top, and another on a second step ladder at the far end. Its top sits 3′ 2 5/16″ above the plates and 11′ 0 13/16″ above the deck, a little above eye level from there. The far person holds it level and tight to the cleat while the person at the post drives the cleat screws.
- A third person at the far end. One post cannot hold the overhanging end steady, so a third person on a step ladder holds the far end of the ridge level and tight until the first common pair at that end is nailed to it. That is why the stage table and tool list count three people and three step ladders for this part.
- Commons in pairs. Cut a pattern common (board 7′ 10 13/16″, top edge 7′ 9 1/16″, seat 2 1/2″, heel 1 1/4″, a notch 32% of the depth), test it on both sides of the ridge, then cut 8: 6 for the front and back and 2 kings. Set the pairs at both ridge ends first, check the ridge for level and center, then fill in the middle pair. Each common weighs about 10 lb; one person on the ladder by the ridge nails the top, the other on a step ladder at the wall sets the seat. The plate is 7′ 10 1/2″ above the deck, so never set or nail a seat from the deck, and never from the ladder at the ridge.
- Ties and kings. A 2×4 rafter tie, 12′ 0″, goes on the right face of each pair, 3 in all, with its top corners clipped 1″ by 2″ so it stays under the sheathing. The hurricane tie takes the left face. The two king commons butt the ridge ends and are toe-nailed to them with three nails.
- Four hips. Each 2×6 hip runs at 45 degrees in plan from a corner to a ridge end, sloping 19.5 degrees, top edge 1′ 6″ of tail plus 8′ 10 7/8″ (10′ 4 7/8″ in all). Its seat drops 1/4″ so its top corners stay in the roof planes, its top is 2 3/8″ above the plate, both ends get double 45 degree cheek cuts, and the tail is ripped 2 1/16″. A strap tie goes across the lapped plates at each corner first, because the strap cannot go on once the hip is in. Two people set each hip (about 21 lb): one beside the ridge end holds the V point in the corner between the end common and the king, the other inside the wall corner sets the seat. Nobody works from outside the walls until the fascia step.
- Jacks, then the post comes out. 32 jacks in four lengths, each about 1′ 4 1/8″ longer than the one before, with 45 degree side cuts in two hands, 4 of each per length. Nail them in pairs either side of a hip, then back out the cleat screws and take the post out. Eight tail jacks fill the eave between each hip tail and the first jack.
- King tie. With the post out, a 2×4 on edge runs from king to king on top of the rafter ties, in two pieces (6′ 4 1/4″ and 6′ 1 1/4″), each starting 9 1/4″ in from its end wall. They butt over the middle tie 7′ 1 1/2″ from the left corner and are joined with a 24″ strap. The rafter ties hold the long walls; this holds the end walls.
The hip seat notch is 3 7/16″ of a 5 13/16″ plumb depth, 59%, far past the one-third the commons keep. The plan explains in step 22.4 that the seat sits right over the lapped plates at the corner, so the notch carries no bending, and the tie, toe-nails and strap hold it. Do not cut it deeper than drawn. For more on roof styles and roof framing in general, see our guide to building a shed roof.
Fascia, soffit, sheathing and shingles on a hip roof
A hip roof has eaves on all four sides and no rakes. The front and back fascia each run 16′ 1 1/2″ long point to long point, made from two 8′ 0 3/4″ pieces joined with a 45 degree scarf centered on the rafter tail 7′ 0″ from the left corner. Each end fascia runs 14′ 1 1/2″, from two 7′ 0 3/4″ pieces scarfed on the tail 6′ 0″ from the front corner. All four miter at 45 degrees over the hip tails. The 8 plywood soffit strips are 1′ 0 7/16″ wide, ripped from 3 sheets, and slope with the rafter tails. They meet at the corners on a cut line at 48.2 degrees to the strip’s edge, not 45, because they are sloped: you measure 11 1/8″ along the wall edge from the strip’s end and draw to the fascia edge.
The roof is about 250 sq ft. Each long plane is cut from four pieces (A to D) and each end from three (E, F and G up to the point), and the back and second end are mirror images. Every end joint lands on a rafter center. The drip edge goes on all four eaves before the felt, folded around each corner, and the felt runs from the eaves up with 2″ head laps and 4″ end laps, wrapping 6″ over each hip and the ridge. This roof takes 2 rolls.
Shingles run 19 courses up each plane at 5″ exposure, over a starter strip on all four eaves. Where a course meets a hip, let it run past, snap a line along the hip and cut it off from the top. About 109 cap pieces, cut three to a shingle from 37 shingles, cover the hips from the eaves up, and the ridge is capped last, starting at the end away from the prevailing wind, so its first pieces lap over the hip caps. Total: 12 bundles.
How the 12×14 hip roof shed is vented
A hip roof has no gable wall for a high vent, and this plan adds no roof vent. Air moves through a 1/4″ gap left at the siding under the soffit strips, backed with insect screen stapled to the underside of the tails, all the way around the four eaves. The plan says plainly that this gap is the shed’s only vent and that it is low air only.
That suits unheated storage, which is what the plan is drawn for. If you plan to heat or insulate the shed, the plan tells you to plan roof vents as well, and that is also a good moment to check your local permit office. The screen comes as 2 rolls, 2 ft x 25 ft, each cut in half lengthwise into two 25 ft strips.
What you can fit in a 12×14 hip roof shed
The plan’s “What fits inside” page draws the room from above, 13′ 5″ across and 11′ 5″ deep inside, with 7′ 7 1/2″ of clear height under the top plates:
- A 42″ deck riding mower, nose in. With both leaves open the door is about 5′ 11 1/2″ clear, so a 42″ deck (4′ 7 3/16″ wide) clears each side by 8 1/8″. The plan adds that a 48″ deck fits with its deflector raised and a 54″ deck does not. Measure your own mower before you buy.
- An aisle behind it. The drawing leaves a 3′ 6″ aisle behind the mower to the back shelves.
- A wheelbarrow and two bikes. The drawing also places a wheelbarrow (2′ 2″ x 5′ 0″) and two bikes with their handlebars staggered (2′ 6″ x 5′ 10″).
- Shelves and a bench, yours to add. It shows 24″ deep shelves on the back wall, 16″ deep shelves along the back 6 ft of each side wall and a 20″ deep bench under the right window. They are not on the shopping list.
- A ramp. The deck sits 9 3/4″ above the gravel, so wheels need the ramp from step 27: 6′ 9″ wide, 3′ 6″ out at 1:6 (9 degrees), eight stringers 11 3/8″ on center under eight 2×6 boards. Its top sits about 13/16″ below the deck, and the leaf swings out over it with 1 1/4″ to spare. Set the mower deck to its highest cut before you take it up.
- Headroom under the ties. The rafter ties sit on the plates, 7′ 10 1/2″ above the floor, and the king tie stands on them. Above them the roof is open to the ridge, so stand long items against a wall.
The ramp is cut from four 3′ 6″ pieces of pressure-treated 2×10, each ripped on a taper from 7 1/2″ to 1/2″ so one piece gives two stringers. The bottom board is ripped to 2 15/16″ with a 1″ bevel at its toe, and two hook-and-eyes hold the ramp to its 6′ 9″ ledger, which takes 6 structural screws into the rim and 6 into the skid. You can unhook the ramp and lift it away to level or move the shed. An open slot of about 1 1/8″ stays between the top board and the siding; the plan says to keep it swept out.
Hip roof on a 12×14 shed: what it costs you and what it gives
A hip roof takes more cutting than a gable roof: four hips with double cheek cuts and a deep seat, 32 jacks in four lengths and two hands, 8 tail jacks, a king tie in two pieces, and soffit corners cut at 48.2 degrees. It also covers more roof, about 250 sq ft here under 13 OSB sheets and 12 bundles, because the eave runs around all four sides. The roof framing alone is about 11 hours for two, plus a third person for the ridge, and the sheathing, felt and shingles another 14.
In return there are no gable triangles to frame and side, no rakes, and an eave over every wall that keeps rain off the siding on all four sides. The roof tops out at 11′ 11 5/16″, about 3′ 3″ above the 8′ 8 1/4″ top of the walls. A hip roof generally holds up to wind better than a gable roof, according to the Building America Solution Center guide to hip vs gable roofs. If you would rather frame two flat gable ends, the 12×14 gable shed plan builds on the same footprint, and the 12×14 lean-to shed plan has a single slope.
Tools, ladders and fasteners the plan lists
Beyond a circular saw with a rip guide, a speed square, a framing square, a drill/driver and a framing hammer, the tool list adds:
- a miter saw for the door braces (set to 36 degrees) and the trim
- a reciprocating saw or oscillating tool for flush cuts at the threshold and the window openings
- a 3 lb sledge for the pad frame spikes and stakes, and two 24″ bar clamps for marking the rims together
- a 4 ft level, an 8 ft straight board, a string line with a line level and a hand tamper
- a steel bar or pipe, about 3/4″ x 3 ft, for turning the ground anchors
- three 8 ft step ladders, which reach the ridge (the third is for the person holding the far ridge end), and a 16 ft extension ladder for roof work from the eave, about 8′ 8″ up; extended it is about 13 ft long and reaches about 4′ 0″ past the edge
The fastener schedule gives the nail and count for every joint, from three 16d nails per joist at the rims to three nails through the side cut of every jack and eight clinched nails at each king tie end. The list counts 27 lb of 16d framing nails, about 960 nails plus 10%. For roof work the plan has you screw a 2×4 foot stop through the sheathing into four or more rafters before you work above it, and never to work on the roof alone.
Free 12×14 hip roof shed plan PDF vs the full plan
The free PDF is a streamlined version: the five stages (site and foundation, floor, walls, roof, trim and paint) with 3D views and framing previews, and a table of what the full plan adds. It has no material list, no cut list and no measurements.
The full 70-page plan adds every step, the roof framing plan with each rafter center, the ridge post figure and its braces, the hip and jack cut marks, the sheathing map and its sheet cutting plan, the ramp, the “What fits inside” page, the shopping list and the cut list. It also lists the 95 checks it passed before going on sale, from walls and openings (48 checks) and roof framing (21) to sheets and shingles that cover every surface and drawings that agree with the lists.
Before you build a 12×14 hip roof shed
- Permits. At 168 sq ft and 11′ 11 5/16″ tall, this shed can run into size, height or setback limits, and rules vary by town and HOA. Check your local permit office before you buy lumber, and call 811 a few working days before you dig.
- Snow and wind. The plan uses common small-shed framing. In heavy snow or high-wind areas you may need closer rafter spacing or larger rafters; ask your local permit office about the loads for your address before you build.
- Skids. Use ground-contact rated pressure-treated 4x4s (UC4A or higher), set crown up. Our shed foundation guide compares bases if you are still choosing one.
- Roof day crew. Line up a third helper for the ridge and the first commons, and a third step ladder. Raise each wall with two people, stand each ladder on firm, flat footing, stay off open rafters until the sheathing is on, keep ladders and sheets 10 ft from overhead power lines and never work on the roof alone. More habits that help are in our top 10 shed building tips.
- Materials. Store lumber flat and covered, since wet wood decays faster (USDA Forest Products Laboratory Wood Handbook). Check the stamp on each OSB sheet for its span rating (APA: OSB).
- Upkeep. Keep 6″ or more between the siding and the soil or mulch, keep the drip edges clear, and every spring check for lifted shingles, re-caulk the trim, touch up the paint and make sure the skids are still level and dry.
Related plans
- Same size with a different roof: the 12×14 gable shed plan, or a single slope, the 12×14 lean-to shed plan.
- 2 ft narrower on the same 12 ft side walls: the 12×12 hip roof shed plan.
- 2 ft wider on the same 12 ft side walls: the 12×16 hip roof shed plan.
- Every hip roof shed plan in one place, or browse all shed plans.
Shed building guides
- 6×12 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×10 Firewood Shed Material List: Lumber, Slats, Hardware
- 8×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×8 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×12 Firewood Shed Material List: Lumber, Slats, Hardware
Frequently asked questions
How big is the 12×14 hip roof shed?
The walls are 14 ft wide by 12 ft deep, 168 sq ft of floor. With 12 inch eaves the roof covers 16 ft 1 1/2 in by 14 ft 1 1/2 in. The ridge tops out 11 ft 11 5/16 in above the ground; check height limits with your local permit office.
Does the 12×14 hip roof have a ridge?
Yes, a short one. The shed is 2 ft wider than it is deep, so the four hips meet the ends of a 2 ft 1 1/2 in 2×6 ridge. While you frame, it sits on one temporary 2×4 post braced four ways, and a third person holds the far end until the first common pair there is nailed.
What is on the 12×14 hip roof shed material list?
Every item with its quantity, by section: four pressure-treated 4×4 skids at 14 ft, 14 pressure-treated 2x6s for the floor, 6 floor sheets, 16 T1-11 sheets, 8 commons, 4 2×6 hips, 32 jacks, 13 OSB sheets, 2 rolls of felt, 12 shingle bundles, 2 windows, 44 hurricane ties, 6 ground anchors and the ramp lumber.
How long does it take to build the 12×14 hip roof shed?
The plan's stage times add up to about 68 hours for two people: 6 for the site and foundation, 7 for the floor, 17 for the walls, 11 for the roof framing, 14 for sheathing, felt and shingles and 13 for the door, windows, trim and paint. Setting the ridge and first commons takes a third person.
Will a riding mower fit in the 12×14 hip roof shed?
The fit drawing parks a 42 inch deck rider nose in. With both leaves open the door is about 5 ft 11 1/2 in clear, so that deck clears each side by about 8 1/8 in. A 48 inch deck fits with its deflector raised; a 54 inch deck does not. Measure yours.
Does the 12×14 hip roof shed have a roof vent?
No. A hip roof has no gable wall for a high vent, so the plan leaves a 1/4 in screened gap under the soffit around all four eaves. The plan says that suits unheated storage; if you plan to heat or insulate the shed, plan roof vents as well and ask your local permit office.
More about the 12×14 hip roof shed plan
Build Your Own 12×14 Hip Roof Storage Shed With Ease!
A Hip Roof Shed, as the name implies, looks classy and at the same time can you give your garden or lawn extra space to store your supplies or hardware. Besides, if you are a hobbyist and you want your very own personal space to work, then having a 12×14 Hip Roof Storage Shed is probably the best idea! So wait no more – order now and start building today…
Shed Plan Includes:
A Full-Fledge Material List with Required Quantity
The materials you use to build a shed are the secrets to your success. Unfortunately, most plans out there won’t precisely tell you what to buy and in what quantity. In fact, they would lure you to buy products from the plan-sellers. Luckily, we have a completely different motto. We want you to succeed in building your dream shed. And for that, we understand how important it is to get the right materials.
Our 12×14 Hip Roof Storage Shed Plan comes with an all-inclusive list of materials, hardware and tools that you would need to build the shed. Nothing more, nothing less! No click baits! You get a printable list of materials that you can take to the hardware store.
Shed Plan Includes:
Simple, Easy to Understand Step by Step Instructions
Who would have ever thought to get their hands on a shed plan that would take them through the entire process with such ease! Our 12×14 Hip Roof Storage Shed Plan comes with easy to understand, step by step instructions for DIY newbies. Don’t worry if you don’t have any experience in building wooden structures. The plan takes you through it in plain words, without jargon. Right from building the foundation to the walls and even the roofing, we have everything covered for you.
Shed Plan Includes:
3D Rendered Images for Reality Check
2D images are a thing of the past! Our 12×14 Hip Roof Storage Shed Plan comes with 3D rendered images, which means you get to see every corner, every angle and every inch clearly as if it is being right in front of you by a professional. You won’t have to scratch your head thinking how the shed should from the front, back or the sides. Even the rooftops are visualized in 3D for better understanding.
Building Your Own Shed vs. Getting Professional Help
1st Reason
You Save What a Builder Would Charge
Probably the most important reason for building your own shed is that you save money. A builder charges for labor on top of the materials, for work you can do yourself. With our 12×14 Hip Roof Storage Shed Plan, you get clear instructions, material lists and diagrams to go through the process easily.
2nd Reason
Choose Your Own Design and Make Your Dream Come True
Don’t fall for the marketing gimmicks of most professionals out there. When you start building your own shed, the world is out there for you to explore. With our material list and instructions, you will realize that you can build your dream shed without any design restrictions. The plan is simple yet it gives you the liberty to add in your own flavor!
3rd Reason
You Will Reclaim Your House Again
Our 12×14 Hip Roof Storage Shed has 120 sq ft of floor for your storage. Whether you garden or play sports, you can use the shed to keep all sorts of your equipment and tools. Besides, the shed will add an exquisiteness to your garden while fulfilling its purpose.
All the Other Reasons
This Is Exactly What You’ll Get with Your 12×14 Hip Roof Storage Shed Plan!
19 step-by-step sections that guide you through the whole process.
Designed for beginners as well as for the professionals.
Explanatory 3D images so you can see exactly what to do next.
Comprehensive materials list that gives you exactly what you need.
Your plan will look great on any mobile device.
PRO-TIPS throughout the build.
High quality PDF plan with everything you need emailed to you instantly.
How to Build a 12×14 Hip Roof Shed: The Steps at a Glance
This is a short overview of how the 12×14 hip roof shed goes together. The full plan PDF has 19 build steps on 70 pages, with the cut length and count of every part, a shopping list with quantities and drawings for the steps.
Step # 1: Check the Rules Where You Live
Rules for sheds, such as size limits, setbacks and permits, vary by town and HOA. Check your local permit office before you build.
Step # 2: Know the Size of Your 12×14 Shed
The shed is 14 ft wide and 12 ft deep (168 sq ft of floor). The walls are 94 1/2″ tall including the plates, with a 6/12 roof. The roof peaks about 11′ 11 5/16″ above the ground. It has a double door in the front wall and 2 windows (36″ by 36″ rough openings). The plan estimates about 68 hours of work for two people.
Step # 3: Get the Tools and Materials
You need basic carpentry tools: a circular saw, a speed square, a drill/driver, a framing hammer or nailer, a 4 ft level and a tape measure. The main materials are pressure-treated 4×4 skids and 2×6 floor joists, 3/4 in tongue and groove plywood, 2×4 studs, 5/8 in T1-11 siding, 2×4 rafters, 7/16 in OSB, roofing felt, drip edge and asphalt shingles. The plan’s shopping list gives the quantity of each.
Step # 4: Build the Foundation and Floor
Lay a compacted gravel pad and set the pressure-treated 4×4 skids level in both directions. Build the floor frame from pressure-treated 2×6 joists about 15 1/4 in on center, square it by measuring the diagonals, fix it to the skids, then glue and screw the 3/4 in tongue and groove plywood on top.
Important Tips:
- Build the foundation where the shed will stand. Moving a finished shed is hard work.
- Clear plants and loose soil so the pad sits on flat, firm ground.
- Crown every skid up. The floor weight will flatten it.
Step # 5: Frame and Raise the Walls
- Frame each wall flat on the floor with 2×4 studs 16 in on center, with headers over the door and window openings.
- The door rough opening is 6′ 0″ wide by 6′ 4 1/2″ tall.
- Raise each wall with helpers (the plan says how many for each wall), check it plumb with a level, brace it and nail the corners together.
- Cover the walls with 5/8 in T1-11 siding. The plan gives the size of every sheet.
Step # 6: Frame the Roof
- Set the 2×6 ridge and the common rafters that hold it.
- Add the four hip rafters from the wall corners to the ridge.
- Fill in the jack rafters between the hips and the walls, in matching pairs.
- The eaves overhang 12″ on all four sides.
Step # 7: Sheathe and Shingle the Roof
- Nail 7/16 in OSB over the rafters.
- Add roofing felt and drip edge, then the asphalt shingles. Follow the shingle maker’s instructions.
Step # 8: Door, Window and Trim
- Build the door from the plan and hang it.
- Set the windows in their framed openings by the maker’s instructions.
- Add the fascia, soffit and corner trim.
Step # 9: Finishing Touches
- Paint or stain all exposed wood to protect it from the weather.
- Add shelves and hooks to suit what you store.
Want every measurement? The full 12×14 Hip Roof Storage Shed Plan PDF has the shopping list, the cut list and 19 build steps with drawings.
Ready to build the 12×14 hip roof shed?
$19.99 for the full PDF: every step, cut and board. 30-day money-back guarantee.



