This 6×8 shed material list is for a gable shed on skids. The main items are 84 2x4s with braces, 10 treated 2x6s, 3 treated 4x4s, 2 sheets of floor plywood, 4 of OSB, 10 of T1-11 and 4 shingle bundles. It assumes 94 1/2 in walls, a 6/12 roof and 16 in spacing.
Every quantity and cut length on this page comes from the shopping list, lumber yard order and cut list in the 3DSHEDPLANS 6×8 gable shed plan PDF. The list counts what to buy by stock length, and the plan checks that the framing closes and that every roof sheet joint lands on a rafter. It is a shopping aid, not a stamped engineering drawing. It covers one 60 in double door in a 5′ 0″ rough opening, two 18 x 27 in windows and a detachable ramp.
What this 6×8 shed material list assumes
The plan builds a shed 6 ft deep and 8 ft wide, 48 sq ft of floor. The ridge runs the 8 ft length, the rafters span the 6 ft depth, and the double door sits in the 8 ft front wall. These are its settings:
- Walls: 94 1/2 in (7′ 10 1/2″) tall including the bottom plate and double top plate, so wall studs are cut to 90 in (7′ 6″). The top of the walls sits 8′ 8 1/4″ above the ground and the peak 10′ 5 5/16″.
- Spacing: studs, floor joists and rafters all at 16 in on center.
- Roof: 6/12 pitch, 2×4 rafters, a one-piece 2×6 ridge board, 12 in eave overhang and 4 in rake overhang. The roof footprint is 8′ 9 1/2″ x 8′ 1 1/2″.
- Floor: three pressure-treated 4×4 skids, 2′ 10 1/4″ on center, under 2×6 joists cut to 5′ 9″ and 3/4 in tongue and groove plywood. The skids sit on a crushed stone pad 10 x 8 ft and 4 in deep inside a pressure-treated 4×6 frame, with a landing in front of the door for the ramp. The floor sits 9 3/4 in above the ground.
- Loads: the plan uses common small-shed framing and says heavy-snow or high-wind areas may need closer or larger rafters. If your snow load may be higher, check your local permit office before you buy rafter stock.
- Openings: a 5′ 0″ wide double door on 6′ 4 1/2″ trimmers in the front wall, built from two new T1-11 sheets, and one 18 x 27 in window in each 6 ft side wall. The back wall has no opening.
The 8×6 build, sold from the 6×8 gable shed plan page, has the same 48 sq ft of floor but a different build: the door is in the 6 ft end, it is a 42 in single door, and the shed runs 8 ft deep. Its printable list is built for that layout, so if you buy either plan, shop from that plan’s list.
Shopping list by stage
Lumber sizes are nominal, and a 2×4 measures about 1 1/2 x 3 1/2 in, as the American Wood Council explains. Check the grade stamp on plywood and OSB; the APA trademark guide shows how to read it. Treated lumber that touches the gravel or the ground (skids, scabs, ramp) must be rated for ground contact (UC4A or higher).
Totals at a glance
| Material | Total |
|---|---|
| 2×4 framing boards, all lengths | 62 |
| 2×4 temporary braces, stakes, cleats and seam blocks | 22 |
| All 2x4s for the yard trip | 84 |
| Pressure-treated 2×6 (2 rims at 8 ft, 8 boards at 12 ft for joists and the ramp) | 10 |
| Pressure-treated 4×4 x 8 ft (skids) | 3 |
| Pressure-treated 4×6 (pad frame: 1 at 10 ft, 3 at 16 ft) | 4 |
| Pressure-treated 2×10 x 8 ft (ramp stringers) | 2 |
| 2×6 and 2×8 (2 window headers, 1 ridge, 1 door header) | 4 |
| 3/4 in T&G plywood sheets (floor) | 2 |
| 7/16 in OSB sheets (roof) | 4 |
| 5/8 in T1-11 sheets (7 walls, 1 gable, 2 door leaves) | 10 |
| 1/2 in plywood sheets (soffit, header fillers) | 2 |
| 3-tab shingle bundles | 4 |
Framing at 24 in on center would use fewer studs. This count frames studs, joists and rafters at 16 in, puts a rafter tie on every interior rafter pair and frames a full window opening on each side wall. The plan asks you to add 2 or 3 spare studs for bad boards; they are not in the yard order.
Floor and pad
| Item | Qty | Used for |
|---|---|---|
| Pressure-treated 4×4 x 8 ft, ground contact | 3 | Skids, full length |
| Pressure-treated 2×6 x 8 ft | 2 | Rim joists at 8′ 0″ |
| Pressure-treated 2×6 x 12 ft | 4 | 7 floor joists cut to 5′ 9″, two from each board and one from the last |
| 3/4 in T&G plywood, 4×8 sheet | 2 | Floor decking (48 sq ft) |
| 2×4 x 8 ft | 1 | Flat blocks under the decking seam |
| Crushed stone 3/4 in, loose | 1.9 cu yd | Gravel pad and landing, measured loose before tamping |
| Pressure-treated 4×6 x 16 ft, ground contact | 3 | Pad frame |
| Pressure-treated 4×6 x 10 ft, ground contact | 1 | Pad frame |
| Rebar stakes 1/2 in x 24 in | 21 | Pinning the pad frame |
| Galvanized timber spikes 3/8 x 10 in | 16 | Pad frame corners, 2 per corner |
| Deck screws 2 in (or 6d ring-shank nails), rated for treated lumber | 3 lb | Decking |
| Construction adhesive, 10 oz tube | 4 | A bead on each joist under the decking |
For blocks, piers or a slab instead of skids, see shed foundation options.
Walls and roof framing
| Item | Qty | Used for |
|---|---|---|
| 2×4 x 8 ft | 46 | Wall studs, plates, cap plates, cripples, rafter ties, gable plate ties, gable studs, frieze blocks |
| 2×4 x 10 ft | 10 | 14 rafters and 4 fly rafters (two from each board), frieze blocks |
| 2×4 x 12 ft | 3 | Side wall plates and the collar ties |
| 2×4 x 14 ft | 3 | Door and window trimmers |
| 2×6 x 8 ft | 2 | Window headers |
| 2×6 x 10 ft | 1 | Ridge board |
| 2×8 x 12 ft | 1 | Door header, doubled |
| Hurricane ties, H2.5A type or equal | 10 | Rafter to plate |
| Framing angles, A34 type or equal | 8 | 4 for the end rafters at the corners, 4 for the gable plate ties |
| 2×4 x 12 ft, temporary | 12 | Plumb braces and the diagonal for each wall section, reused later |
| 2×4 x 10 ft, temporary | 4 | Braces for the two center gable studs while the ridge goes on |
| 2×4 x 8 ft | 5 | 3 for 8 pointed stakes, 2 for 12 deck cleats |
The three header filler strips of 1/2 in plywood are ripped from the soffit sheet, so buy that sheet with the wall lumber. Add the 22 temporary and extra boards to the 62 framing boards for 84 plain 2x4s in all.
Roof covering
| Item | Qty | Used for |
|---|---|---|
| 7/16 in OSB, 4×8 sheet | 4 | Roof sheathing |
| 15 lb felt, 400 sq ft roll | 1 | Underlayment (the roof uses about 90 sq ft with the laps) |
| 3-tab shingles, 26 per bundle | 4 bundles | Roof, starter course and ridge cap |
| Drip edge, 10 ft | 4 | Eaves and rakes |
| Roofing nails 1 1/4 in galvanized | 3 lb | Shingles and drip edge |
| Roofing cap nails 1 in | 1 lb | Felt |
| Roofing cement, 10 oz tube | 2 | Last cap pieces and exposed nail heads |
| Under-eave vent 16 x 8 in, aluminum, screened | 2 | One in each eave soffit |
| Insect screen, 2 ft x 25 ft | 1 roll | Vent gaps under the end rafters and the slots over the frieze blocks |
| Staples 3/8 in for the staple gun | 1 box | Insect screen |
| H-clips for 7/16 in sheathing | 12 | The seam under the narrow top row of roof sheathing, one per bay |
Siding and trim
| Item | Qty | Used for |
|---|---|---|
| 5/8 in T1-11, 4×8 sheet | 7 | Walls |
| 5/8 in T1-11, 4×8 sheet | 1 | Both gable triangles, cut as strips |
| 5/8 in T1-11, 4×8 sheet | 2 | Door leaves (one new sheet per leaf) |
| 1/2 in plywood, 4×8 sheet | 2 | Eave soffit and header fillers |
| Z-flashing, 10 ft | 2 | Wall siding to gable siding joint |
| Drip cap, 10 ft | 2 | Over the door and window head casings |
| 1×6 x 10 ft | 4 | 2 eave fascia boards, and 2 boards that each give two rake fascia pieces |
| 1×4 x 16 ft | 2 | Corner trim on the eave walls |
| 1×4 x 14 ft | 4 | Door casing sides, door stiles, door Z braces |
| 1×4 x 12 ft | 1 | Door rails |
| 1×4 x 8 ft | 9 | Gable-wall corner trim, door head casing, window casings |
| 1×2 x 8 ft | 2 | Door stop and astragal |
| Exterior paint and primer in one | 3 gal | Two coats of about 377 sq ft each; check the rough-surface coverage on the can and round up |
| Exterior caulk | 3 tubes | Trim |
Hardware, door and windows
| Item | Qty |
|---|---|
| Framing nails 3 1/2 in (16d), hot-dip galvanized (about 817 nails plus 10 percent) | 23 lb |
| Siding nails 2 1/2 in (8d), hot-dip galvanized | 10 lb |
| Sheathing nails 2 1/2 in (8d) for OSB | 3 lb |
| Connector nails 1 1/2 in for the ties and straps | 2 lb |
| T-strap door hinges, 8 in strap or longer, galvanized | 6 |
| Carriage bolts 1/4 x 2 in with washers and nuts | 18 |
| Door handle and latch set | 1 |
| Barrel bolts for the fixed leaf | 2 |
| Brush door sweeps, 36 in | 2 |
| Door hold-open hook and eye, 6 in | 2 |
| Aluminum threshold cap, 5 ft | 1 |
| Exterior screws 1 1/4 in (door frame to T1-11, vent flanges) | 1 lb |
| Exterior screws 3 in (hinge T-parts into the framing) | 1 box |
| Structural wood screws 5 in, exterior (tight wall corners) | 26 |
| Prefabricated window, 18 x 27 in rough opening | 2 |
| Flashing tape 4 in | 1 roll |
| Wood shims | 1 bundle |
| Screw-in ground anchors, 30 in or longer, with straps | 4 |
| Structural wood screws 1 1/2 in (anchor straps) | 24 |
Ramp
| Item | Qty | Used for |
|---|---|---|
| Pressure-treated 2×10 x 8 ft, ground contact | 2 | 4 pieces at 3′ 6″, each ripped into two tapered stringers |
| Pressure-treated 2×6 x 12 ft, ground contact | 4 | 8 deck boards at 5′ 9″ |
| Pressure-treated 2×4 x 8 ft, ground contact | 1 | Ledger at 5′ 9″ |
| Hook-and-eye latches, 4 in galvanized | 2 | Holding the ramp to the ledger |
| Exterior deck screws 3 in | 124 | Boards to stringers, 2 per board per stringer |
| Structural screws 3 in, 1/4 in | 10 | Ledger into the rim joist and the skid |
| Anti-slip grit tape, 2 in x 15 ft | 4 rolls | One strip along each board |
The ramp is detachable, 5′ 9″ wide and 3′ 6″ out at a 1:6 slope, and all of it is ground-contact lumber. See also how to build a shed ramp.
Cut list highlights
Most of the 6×8 cut list is square cuts: 27 wall studs at 7′ 6″, 7 floor joists at 5′ 9″ and three 8′ 0″ skids. The parts below need angle cuts or come in several lengths.
| Part | Lumber | Cut length | Qty |
|---|---|---|---|
| Rafter (board length, see below) | 2×4 | 4′ 6 9/16″ | 14 |
| Fly rafter (rake) | 2×4 | 4′ 6 9/16″ | 4 |
| Ridge board | 2×6 | 8′ 8″ | 1 |
| Rafter tie (interior pairs, at the plates) | 2×4 | 6′ 0″ | 5 |
| Gable plate tie (flat under the first 2 rafter ties) | 2×4 | 2′ 6 3/4″ (2), 2′ 9 3/4″ (2) | 4 |
| Collar tie | 2×4 | 3′ 6 9/16″ | 3 |
| Lookout block (rake overhang) | 2×4 | 2 1/2″ | 12 |
| Frieze block (over the eave walls, top beveled) | 2×4 | 1′ 1″ (8), 1′ 0 1/4″ and 1′ 1 3/4″ (2 each) | 12 |
| Front header (2×8 doubled + 1/2 ply) | 2×8 | 5′ 3″ | 2 |
| Door trimmer | 2×4 | 6′ 4 1/2″ | 2 |
| Window header (2×6 doubled + 1/2 ply) | 2×6 | 1′ 9″ | 4 |
| Window trimmer | 2×4 | 6′ 3″ | 4 |
| Center gable stud (under the ridge) | 2×4 | 1′ 2 13/16″ | 2 |
| Gable end studs | 2×4 | 7 1/16″, 11 1/16″, 1′ 3 1/16″ and 1′ 7 1/16″ | 2 each |
| Side wall plates | 2×4 | 5′ 4 3/4″ | 4 |
| Side wall cap plates | 2×4 | 6′ 0″ | 2 |
| Front and back cap plates | 2×4 | 7′ 5″ | 2 |
| Front and back wall plates | 2×4 | 8′ 0″ | 4 |
| Door leaf stile, rail, brace | 1×4 | 6′ 5 1/4″ (4), 1′ 10 5/8″ (6), 3′ 2 3/16″ (4) | 14 |
Rafters. The 4′ 6 9/16″ figure is the overall length of board each rafter needs, from the tip of the ridge plumb cut to the far tip of the tail plumb cut, including the 12 in eave overhang. Do not measure it along the top edge, which is 4′ 4 13/16″; lay out the cuts with the speed square on a pattern rafter. Two of them come out of each 10 ft 2×4, with 10 5/8″ left after the kerfs, so the 18 rafters and fly rafters take 9 boards.
Ridge. The ridge is one 2×6 cut to 8′ 8″, running out flush with the fly rafters’ outside faces. A 10 ft board leaves 1′ 3 7/8″. No splice is needed at this size.
Headers. The 5′ 0″ door opening gets a doubled 2×8 header at 5′ 3″ with a 1/2 in plywood filler, on trimmers cut to 6′ 4 1/2″, with three 6 1/4″ cripples above it. The bottom plate is cut out of the doorway after the wall is up. Each window gets a doubled 2×6 header at 1′ 9″ on 6′ 3″ trimmers, a cripple above, a 2×4 sill with its top 4′ 0″ above the bottom plate and a lower cripple below.
Gable studs. Each 6 ft gable has one 1′ 2 13/16″ center stud under the ridge plus four end studs, two each side of the center, one of each length: 7 1/16″, 11 1/16″, 1′ 3 1/16″ and 1′ 7 1/16″. At 6/12 the roof rises 1/2 in for every inch you move toward the ridge, so each stud’s length depends on where the 16 in layout puts it. Hold each one against its own end rafter and mark it before you cut.
Gable plate ties. Four flat 2x4s, two at 2′ 9 3/4″ for the left gable wall and two at 2′ 6 3/4″ for the right, sit under the first 2 rafter ties of each gable wall. Each is fixed with a framing angle, which is why there are 4 more angles on the hardware list.
Plates. The side walls have 5′ 4 3/4″ bottom and top plates, so a framed side wall drops in between the front and back walls. Their 6′ 0″ cap plates lap over the front and back walls to lock the corners, and the front and back cap plates are cut 7 in short to 7′ 5″.
Siding. The plan has you screw a straight 2×4 ledger to the floor frame at the siding’s bottom line, so each sheet stands on it while a helper holds it plumb and you nail the top. On the front and back walls the siding stops 1 11/16″ below the top of the double plate so the rafter tails pass over it.
Door leaves. The siding cut out of the doorway is 6′ 4 1/2″ tall, shorter than the 6′ 5 1/4″ door leaf, so each of the two leaves needs its own new T1-11 sheet. Each leaf is 2′ 5 5/8″ wide, with a 1×4 frame of two stiles and three rails and two Z braces.
Gable vs lean-to: what changes
The same 6×8 footprint also comes as a lean-to (single-slope) roof at 3/12, with a low back wall, the door in the high front wall and the window in the back wall. That version is the 6×8 lean-to shed plan, a 67-page PDF with its own printable list. The lean-to column below is a comparison, so shop from the list in the plan you buy. The skids, joists and decking stay the same; the studs, rafters and siding change.
| Item | Gable (6/12) | Lean-to (3/12) |
|---|---|---|
| Rafters | 14 2×4 at 4′ 6 9/16″ + 4 fly | 7 2×4 at 7′ 8 5/8″ + 2 fly |
| Ridge board | 2×6, 8′ 8″ | None |
| Wall studs | 7′ 6″ on all four walls | 7′ 8 5/8″ front, 6′ 3 1/2″ back, six lengths on each side |
| 2×4 framing boards bought | 62 | 47 |
| 2×6 boards bought (not treated) | 3 | 1 |
| T1-11 sheets | 10, all 4×8 | 10: four 4×9, six 4×8 |
| Roof OSB sheets | 4 | 3 |
| Shingle bundles | 4 | 3 |
| Felt | 1 roll | 1 roll, laid double below 4/12 |
| Fascia boards | 1×6: 4 at 10 ft | 1×6: 2 at 10 ft, 2 at 8 ft |
| Framing nails | 23 lb | 16 lb |
| Extra hardware | 2 Z-flashing, 2 soffit vents, 8 framing angles | 4 framing angles, 4 twist straps at the wall corners |
| Floor | 3 skids, 7 joists, 2 sheets | 3 skids, 7 joists, 2 sheets |
On a 6 ft deep lean-to the 2×4 rafters have room to spare. Each side wall has 6 studs stepping in length under a sloped top plate, so lay them out on the deck before cutting. The high front wall’s studs match the 92 5/8 in precut stud sold at many yards, so you can buy precuts in place of some of the 2×4 x 8 ft and skip those cuts.
The high front wall and part of each side wall take 4×9 siding sheets, which some yards have to order. At 3/12, read the minimum slope on the shingle wrapper and follow the maker’s low-slope instructions; ARMA’s low-slope guide explains the double underlayment. For more on single-slope builds, see how to build a lean-to shed, the 6×6 lean-to shed plan, the 6×10 lean-to shed plan and our gable vs lean-to vs hip roof comparison.
Where the waste goes
- Wall studs: 90 in studs leave about 5 7/8″ from each 8 ft board. Precut 92 5/8 in studs also work where the plan allows them; trim 2 5/8 in off each. The plan marks 9 of the 52 eight-foot boards as full 96 in boards, which the plates and ties need.
- Floor joists: two 5′ 9″ joists from each 12 ft board leave 5 3/4″. The last board gives only one joist, so it leaves a piece 6′ 2 7/8″ long, enough to replace a split joist.
- Floor decking: two sheets give 64 sq ft for a 48 sq ft floor, so one sheet is ripped and about 16 sq ft is left over. The one 2×4 x 8 ft on the list is cut into flat blocks under any seam that falls between joists.
- Rafters: two 4′ 6 9/16″ rafters from a 10 ft board leave 10 5/8″, so a mis-cut rafter means a new board. There is no spare in the count.
- Rafter ties: the five 6′ 0″ ties come from 8 ft boards, leaving 1′ 11 7/8″ each. The plan keeps those offcuts for the gable corner nailers, the gable end studs and the 12 lookout blocks, so nothing else is bought for them.
- No trim room: the skids, the rim joists and the front and back wall plates are all 8′ 0″, a whole 8 ft board. The plan marks them “factory ends kept”, so check at the yard that the ends are square and the boards measure at least 96 in.
- Fascia and ridge: each 8′ 8″ eave fascia and the ridge leave 1′ 3 7/8″ from a 10 ft board. Each rake fascia board gives two 4′ 9 1/4″ pieces with 5 1/4″ left.
- Sheets: 7 wall sheets cover the four walls with little to spare, so buy one spare T1-11 sheet if a damaged sheet would mean a long trip back to the yard.
- Hauling: the three 14 ft 2x4s, four 14 ft and two 16 ft 1x4s and three 16 ft 4x6s will not fit most cars, so plan on yard delivery or a trailer for those.
- No spares: the counts include nothing for rejects. Sight down each board’s edge at the yard, skip bowed or twisted ones, and add a few 2×4 x 8 ft if you expect to cull some.
Tools and crew for a 6×8 build
- Circular saw, speed square and framing square for 27 stud cuts and 18 rafters; cut the 2 1/2 in lookout blocks from the rafter tie offcuts
- A miter saw, or the circular saw and a speed square, for the door braces and the trim
- Table saw or a circular saw with a straightedge guide for the 1/2 in soffit strips, the last decking row and the bevel on the frieze blocks
- Framing hammer or framing nailer, and a drill/driver for the screws
- 4 ft level and a 25 ft tape for checking that the floor diagonals match
- A hand tamper or a rented plate compactor for 1.9 cu yd of gravel, laid in thin layers
- A 3 lb sledge for the pad frame stakes and spikes, and a steel bar or pipe for turning the ground anchors
- Two 6 ft step ladders for the ridge and rafters, plus a 16 ft extension ladder for roof work from the eave; never stand on a ladder’s top two steps or on the wall plates
- A crew: two people for each bare wall frame (the heaviest, the front wall, is about 130 lb), and a third on the deck makes the lift easier
Common mistakes
- Mixing up this list and the 8×6 plan’s list. Our 8×6 plan has a 42 in single door in the 6 ft end; this list is for a 60 in double door in the 8 ft front wall. Wall lengths, trimmers, siding and door sizes change between the two.
- Forgetting the door sheets. The siding cut out of the doorway is 6′ 4 1/2″ tall, shorter than the 6′ 5 1/4″ door leaf, so each leaf needs its own new T1-11 sheet. That is why the list has 2 sheets for the doors.
- Skipping rafter ties. A ridge board is not a beam. The 5 rafter ties at the plates stop the walls from spreading; the 3 collar ties higher up do not replace them. They are not a loft either, so keep anything you set on them light.
- Leaving out the gable plate ties. The 4 flat 2x4s and their 4 framing angles stiffen the top of each gable wall against wind. They are on the list, so buy them with the roof framing.
- Buying 6 ft joist stock. Many yards do not stock 6 ft treated 2×6, and a 12 ft board gives two 5′ 9″ joists with 5 3/4″ left. The list buys 12 ft boards for that reason.
- Swapping materials without recounting. This list is for 3-tab shingles and T1-11. Architectural shingles, metal roofing or lap siding cover differently, so recount from the coverage printed on the bundle or the maker’s install guide.
- Untreated wood near the ground. Skids, rims, joists and the ramp are pressure treated; plain framing lumber there rots. Use ground-contact rated wood for the skids and the ramp, and consider it for the rims and joists too, since they sit a few inches above the gravel and are hard to replace once the deck is on. Use hot-dip galvanized nails and treated-lumber rated screws in treated wood. The USDA Wood Handbook covers why wet, untreated wood decays.
- Skipping the ramp lumber. The deck is 9 3/4″ above the gravel, so the double door gets a ramp for a mower or wheelbarrow. The plan’s ramp is on this list.
Many towns set floor-area and height limits for sheds that need no permit. The roof peak of this shed sits well above its 94 1/2 in walls, at 10′ 5 5/16″ above the ground, so ask how your town measures height, and whether a skid shed needs ground anchors in your area: check your local permit office before you order. Our shed permit checklist lists what to ask.
For the base under the skids, including concrete blocks instead of a gravel pad, see shed foundation options. Weighing a kit or a prebuilt 6×8 instead? Read build or buy a shed. To compare 2×4 counts across sizes, see how many 2x4s to build a shed, and for other sizes try the shed material calculator.
Get the full plan
The 6×8 gable shed plan is a 3DSHEDPLANS PDF with 69 pages and 28 sections, 19 of them build steps, with 3D step views, a cut list, a cutting plan and this shopping list with the quantities in the plan’s own order. It builds a 60 in double door, two windows and a wheel-in ramp in about 48 hours for two people. A push mower and a wheelbarrow go in side by side, but the room is 5′ 5″ deep, so a 42 in deck rider does not fit.
For a little less or more room, see the 6×4 gable shed plan and the 8×8 gable shed plan, and compare the 8×8 shed material list. Want the same floor area with the door in the short end? The 6×8 gable shed plan page also sells that 8×6 build.
Want to see the format first? Download the free 6×8 gable shed plan preview PDF. Not sure 48 sq ft is enough? Read what size shed do I need, see every gable shed plan or browse every size on the shed plans page.
Frequently asked questions
How many 2x4s do I need to build a 6×8 shed?
84 in all: 62 framing boards (46 at 8 ft, 10 at 10 ft, 3 at 12 ft, 3 at 14 ft) and 22 for braces, stakes and cleats. Add 1 treated 2×4 x 8 ft for the ramp ledger. That is the 3DSHEDPLANS 6×8 gable plan with a 60 inch double door.
How many sheets of plywood, OSB and siding for a 6×8 shed?
2 sheets of 3/4 in tongue and groove plywood for the floor, 4 sheets of 7/16 in OSB for the roof, 10 sheets of 5/8 in T1-11 (7 walls, 1 gable, 2 door leaves) and 2 sheets of 1/2 in plywood for the soffit and header fillers.
How many bundles of shingles for a 6×8 shed roof?
4 bundles of 3-tab shingles for a 6×8 gable roof at 6/12 with a 12 in eave and 4 in rake overhang. The count covers the roof plus the starter course and the ridge cap. A 3/12 lean-to roof on the same floor takes 3 bundles.
What lumber do I need for a 6×8 shed floor?
Three pressure-treated 4×4 x 8 ft skids, two pressure-treated 2×6 x 8 ft rims, four pressure-treated 2×6 x 12 ft cut into seven 5' 9" joists, and two sheets of 3/4 in tongue and groove plywood, set on a crushed stone pad.
Is there a 6×8 shed plan with a materials list?
Yes. The 3DSHEDPLANS 6×8 gable shed plan is a 69-page PDF with 28 sections, 19 of them build steps, and a printable material list. This page lists that plan's shopping list and key cut lengths, and a free 6×8 preview PDF shows the format first.
Shed building guides
- 8×8 Lean-To Shed Material List: Lumber, Sheets, Hardware
- 8×8 Hip Roof Shed Material List: Lumber, Sheets, Hardware
- 8×20 Lean-To Shed Material List: Lumber, Sheets, Hardware
- 8×20 Hip Roof Shed Material List: Lumber, Sheets, Hardware
- 8×16 Gable Shed Material List: Lumber, Sheets, Hardware
- 8×14 Lean-To Shed Material List: Lumber, Sheets, Hardware