Hip roof · 80 sq ft
8x10 Hip Roof Shed Plan
Build this 8x10 hip roof shed yourself. Every board, cut and step, drawn in 3D across 66 pages.
- 30-day money-back guarantee
- PDF by email right after checkout
- Visa, Mastercard, Amex, PayPal
- Full material and shopping list
- Cut list with every length
- Step-by-step 3D views, 66 pages
- Phone, tablet, PC and Mac

This 8x10 hip roof shed plan from 3DSHEDPLANS builds an 80 sq ft storage shed, 10 ft wide by 8 ft deep, with a 6 ft double door in the front wall, a ramp, a window in each side wall and a 6/12 roof with 12 inch eaves on all four sides. The 66-page PDF has 19 step sections.
Get the full plan PDF for $19.99 or download the free preview
What builders say
A project for me and my son. The plan arrived in my email almost instantly, and everything we needed was included.
We aren't DIY-savvy and needed something simple. The plan was extremely well laid out and easy to follow.
A year ago I had only built flat-pack furniture. The plans are simple to follow, and you don't need years of experience.
The full plan is $19.99: buy the 8×10 hip roof shed plan. To see the drawing style first, open the free 8×10 hip roof shed plan PDF.
8×10 hip roof shed plan: the numbers for a site check
| Check | 8×10 Hip Roof Shed |
|---|---|
| Walls | 10′ 0″ wide x 8′ 0″ deep, 80 sq ft of floor |
| Roof footprint with overhangs | 12′ 1 1/2″ x 10′ 1 1/2″ to the fascia faces (1′ 0″ eaves on all four sides) |
| Gravel pad | 12′ 0″ x 10′ 0″ inside a pressure-treated 4×6 frame, 4″ of 3/4″ stone (2.6 cu yd loose, with the landing in front of the door) |
| Floor height | Top of the deck 9 3/4″ above the ground |
| Wall height | 7′ 10 1/2″ (7′ 6″ studs), top of the walls 8′ 8 1/4″ above the ground |
| Overall height | 10′ 11 5/16″ above the ground, top of the ridge shingles |
| Roof | Hip, 6/12 (26.6 degrees), 2×6 ridge 2′ 1 1/2″ long, 2×4 commons and jacks, 2×6 hips |
| Door rough opening | 6′ 0″ wide x 6′ 4 1/2″ tall, double door centered in the front wall, swings out |
| Window rough openings | 2, each 24″ x 36″, one at the front end of each 8 ft side wall |
| Ramp | Detachable pressure-treated ramp, 6′ 9″ wide, 3′ 6″ out, 1:6 slope |
| Crew and time | Two people, about 48 hours |
A hip roof overhangs all four walls, so stake out the 12′ 1 1/2″ x 10′ 1 1/2″ roof outline on your lot, not just the walls, and leave room to walk around it with a ladder. The ramp and landing reach 7′ 1″ out from the front wall, and the plan’s fit page says to keep 9′ 6″ clear and level in front of the wall if you need to line up a tractor.
How the 8×10 hip roof shed plan goes together
| Stage | What the plan uses | Time for two |
|---|---|---|
| Site and foundation | Compacted gravel pad in a 4×6 frame, three 10 ft pressure-treated 4×4 skids | 4 h |
| Floor frame and deck | Pressure-treated 2×6 joists 15″ on center, 3/4″ tongue and groove plywood | 5 h |
| Walls | 2×4 studs 16″ on center or closer, raised as bare frames, then sided with 5/8″ T1-11 | 12 h |
| Roof framing | 2×6 ridge on a temporary post, 2×4 commons and jacks, 2×6 hips, rafter ties, king tie | 8 h |
| Sheathing and roofing | 7/16″ OSB, drip edge, 15 lb felt and 3-tab asphalt shingles | 10 h |
| Door, windows and trim | T1-11 double door, 2 prefabricated windows, fascia, sloped soffit, 1×4 trim, paint | 9 h |
The plan runs in a fixed order: preparation and ground breaking (step 9), skids (10), floor frame (11), decking (12), anchoring the shed (13), the four walls (14 to 17), joining them (18), the door (19), the roof framing plan (20), commons and ridge (21), hips (22), jacks (23), fascia and soffit (24), sheathing and shingles (25), trim, windows and finish (26) and the ramp (27). Section 28 covers weather, snow and upkeep, and a printable checklist lists each stage with a “date done” column.
Site layout, gravel pad and skids
Stake the corners 10′ 0″ along the front and 8′ 0″ along the sides, and move one stake until both diagonals read 12′ 9 11/16″. The plan has you dig 4″ deep over a 12′ 11″ x 10′ 11″ area, the outside of the pad frame, and on out in front of the door for the ramp and a 3 ft landing: 9′ 8″ wide, centered on the door, reaching 7′ 1″ out from the front wall. Digging moves the stakes, so set them again and recheck.
The frame is pressure-treated 4x6s laid flat, rated for ground contact (UC4A or higher), on a 1/2″ stone bed so it finishes level with the lawn. Its inside is the 12′ 0″ x 10′ 0″ pad plus a landing 8′ 9″ wide that reaches 5′ 7 1/2″ past the front of the pad. Square it until both pad diagonals read 15′ 7 7/16″, join each corner with 2 galvanized 10″ timber spikes, pin it with 24 rebar stakes, then fill it with 4″ of 3/4″ crushed stone compacted in two layers.
Three ground-contact pressure-treated 4×4 skids, each one 10 ft board, run along the 10 ft side, the outer two flush with the floor edges and the middle one 3′ 10 1/4″ on center. Each goes in crown up and is leveled along its length and against the others, with gravel or treated shims under a low one, never untreated wood.
Floor frame and decking
The floor frame is nine 7′ 9″ joists between two 10′ 0″ rims, all pressure-treated 2×6, at 15″ on center. Clamp the rims together and mark both at once from the building’s left end: a joist flush at each end, then lines at 14 1/4″, 29 1/4″, 44 1/4″ and so on to 104 1/4″. The rafter marks later start from the same corner.
Once nailed the frame weighs about 200 lb and racks if you lift it, so you build it in place on the skids, push it until both diagonals read 12′ 9 11/16″, then toe-nail it down. A framing angle goes at every joist-to-skid crossing, 27 in all, with 8 connector nails each.
Three sheets of 3/4″ tongue and groove plywood cover the deck in two rows, cut to a lettered map (A 7′ 5 7/8″, B 2′ 6″, C 3′ 8 7/8″, D 6′ 3″, all 4′ 0″ wide) so the end joints are staggered and land on joists. Two rows cover about 7′ 11″, and two 1x4s ripped to 1″ fill the last inch along the back rim, under the back wall’s bottom plate.
Walls: framing order and lift weights
Each wall is framed flat on the deck, checked by its diagonals and raised as a bare frame. The siding goes on after all four stand.
| Order | Wall | Studs at 7′ 6″ | Bare frame weight |
|---|---|---|---|
| 1 | Back wall, 10 ft, no openings | 10 (including 2 corner backers) | About 120 lb |
| 2 | Front wall with the door opening | 8 (including 2 kings and 2 corner backers, plus 2 trimmers and 4 cripples) | About 160 lb (the heaviest lift) |
| 3 | Left wall with a window | 7 (including 2 kings) | About 120 lb |
| 4 | Right wall with a window | 7 (including 2 kings) | About 120 lb |
- Anchors first. On this plan the 4 ground anchors go in at step 13, before any wall goes up, so every wall you raise stands on a floor that cannot slide.
- Front wall walked across. With the back wall standing, the free deck is shorter than the front wall needs, so it is framed facing the other way, tipped up beside the back wall and walked across to the front edge, standing on its bottom plate the whole way.
- Lifters on the ground. The back and front walls hang past the deck while flat (1/2″ and 6 1/2″), so their lifters start on the ground, 9 3/4″ below the deck, and step up as the wall rises. A third person on the deck makes it easier.
- Nobody in front. A wall that goes past plumb falls outward, off the deck, so nobody stands on the ground in front of it. Pick a calm day and brace it at once.
- Side walls drop in. Their plates are 7′ 4 3/4″, 1/4″ shorter than the gap between the front and back walls, so plumb those first. The gap stays at the back corners and gets a shim at each screw.
The corners are screwed from inside with 3″ exterior screws every 12″, and the second top plates lap every corner by at least 3 1/2″. Wall diagonals are 12′ 7 13/16″ for the front and back walls and 10′ 8 9/16″ for the sides. Each T1-11 sheet (about 60 lb) stands on a 2×4 ledger while your helper holds it plumb.
Door and windows: sizes and positions
The door opening is 6′ 0″ wide and 6′ 4 1/2″ tall, from 2′ 0″ to 8′ 0″ measured from the left corner, so it sits centered with 2′ 0″ of wall each side. It sits under two 6′ 3″ 2x8s with 1/2″ plywood between them. Once the bottom plate is cut out the framed height is 6′ 6″, with 6′ 5 1/4″ clear under the head stop.
The two leaves come from two new T1-11 sheets, because the cut-out is too short. Each is 2′ 11 5/8″ wide and 6′ 5 1/4″ tall, with a glued and screwed 1×4 frame (two 6′ 5 1/4″ stiles, three 2′ 4 5/8″ rails) and two Z braces, 3′ 5 5/16″ along either edge, cut with the miter saw at 36 degrees. Three T-strap hinges hang each leaf on 1/4″ carriage bolts with the nuts inside. The left leaf is active, with the latch on the middle rail 3′ 3 1/8″ above the deck; the right leaf closes on two barrel bolts and carries the 1×2 astragal. A brush sweep goes under each leaf, and an aluminum threshold cap, cut to 6′ 0″, covers the deck edge with no threshold board, so wheels roll straight in. Open, each leaf reaches about 11 5/8″ past its corner, and a 6″ hook and eye holds it against the side wall in wind.
The windows are prefabricated units for 24″ x 36″ rough openings, one in each side wall near the door: 1′ 0″ to 3′ 0″ from the front end of the right wall’s plate, and 4′ 4 3/4″ to 6′ 4 3/4″ from the back end of the left wall’s 7′ 4 3/4″ plate. Each sill top is 3′ 6″ above the bottom plate, under a header of two 2′ 3″ 2x6s. Each opening is wrapped with flashing tape and gets a drip cap over its head casing.
What is on the 8×10 hip roof shed material list
The shopping list is split by section, so you can buy the base first and the roof later:
| Section | Main items and counts |
|---|---|
| Foundation and floor | 3 pressure-treated 4×4 x 10 ft skids, 2 pressure-treated 2×6 x 10 ft rims, 9 pressure-treated 2×6 x 8 ft joists, 3 sheets of 3/4″ tongue and groove plywood, a 1×4 filler, 2.6 cu yd of stone, the pad frame (1 twelve-foot and 3 sixteen-foot pressure-treated 4x6s) with 24 rebar stakes and 16 timber spikes |
| Walls | 2×4 plates and studs for four walls, a doubled 2×8 door header, two doubled 2×6 window headers, 10 sheets of 5/8″ T1-11 |
| Roof framing | 8 commons, a 2×6 ridge, 4 2×6 hips, 16 jacks, 3 rafter ties, two king tie pieces, a temporary 12 ft 2×4 post with 4 braces |
| Roof covering | 8 sheets of 7/16″ OSB (7 plus 1 spare), 1 roll of 15 lb felt, 7 bundles of 3-tab shingles (starter and caps included), 5 pieces of drip edge |
| Fascia, door, windows and trim | 2 1×6 x 12 ft and 2 1×6 x 14 ft for the fascia, 3 sheets of 1/2″ plywood for the soffit, 2 new T1-11 sheets for the leaves, 6 T-strap hinges, a handle and latch, 2 barrel bolts, 2 sweeps, 2 hold-open hooks, a threshold cap, 2 prefabricated windows, 1×4 casing and corner trim |
| Ramp | 2 pressure-treated 2×10 x 8 ft for the stringers, 4 pressure-treated 2×6 x 14 ft for the 8 deck boards, a pressure-treated 2×4 ledger, 2 hook-and-eye latches, 4 rolls of grit tape |
| Hardware and finish | 21 lb of 16d framing nails, siding, sheathing and roofing nails, 28 hurricane ties (skewable ones at the hip corners), 27 framing angles, 4 strap ties plus a splice strap, 4 ground anchors, 6 tubes of adhesive, flashing tape, insect screen, 4 gallons of paint |
The list also counts the temporary pieces people forget: 12 wall braces, 4 post braces, the brace stakes and the deck cleats. It suggests 2 or 3 spare studs for bad boards, and the lumber yard order adds every section into one list for the counter.
Cut list and cutting plan
The cut list gives every part’s lumber, length and count: skids and rims at 10′ 0″, joists at 7′ 9″, studs at 7′ 6″, the ridge at 2′ 1 1/2″, commons at a 5′ 8″ board, hips at a 7′ 6 13/16″ board, jacks at 2′ 8 11/16″ and 4′ 2 5/8″, and tail jacks at 1′ 2 13/16″. Trim, door, ramp and pad frame parts are on it too.
The cutting plan says which board each part comes from and what is left. Two commons come out of each 12 ft 2×4, four short jacks out of each 12 ft 2×4, and two long jacks out of each 10 ft 2×4. The 8 tail jacks cost no extra boards, since they come from the window sill offcuts. The roof sheathing has its own plan: 7 sheets cut to a lettered map, plus 1 spare kept whole.
Why the 8×10 hip roof has a short ridge
On a square shed the four hips meet at one point. This shed is 10 ft wide and 8 ft deep, so the roof planes on the 10 ft walls run up to a ridge instead: a 2×6 only 2′ 1 1/2″ long, its ends 3′ 11 1/4″ in from the outside of each end wall. The two long planes are trapezoids and the two end planes are triangles, all at 6/12.
The commons sit 12″ apart at 4′ 0″, 5′ 0″ and 6′ 0″ from the corner along the front and back walls, so the ridge carries three pairs, plus a king common at the middle of each end wall. Jacks sit at 1′ 4″ and 2′ 8″ from every corner, which is why there are only two jack lengths.
A ridge this short gets one post, not two. In the plan’s words, the post stands “halfway between two common pairs so the post and its cleat stay clear of every common’s seat (the ridge is too short for two posts)”.
How the 8×10 hip roof is framed: ridge, commons, hips and jacks
The plan frames the roof in a fixed order and says who stands where:
- Ridge on one temporary post. A 9′ 7 5/16″ 2×4 post stands on the deck on the shed’s center line, its center 4′ 6″ from the left corner, braced with 4 braces to deck cleats. A 12″ cleat on its back face stands 4″ above the top. The ridge (about 4 lb) sits on the post tight to the cleat, its top 2′ 2 5/16″ above the plates and 10′ 0 13/16″ above the deck. Two people set it: one on an 8 ft step ladder beside the post, no higher than the third step from the top, the other on a second step ladder at the far end.
- Commons in pairs. Cut a pattern common (board 5′ 8″, top edge 5′ 6 1/4″, seat 2 1/2″, heel 1 1/4″, a notch 32% of the depth), test it on both sides of the ridge, then cut 8: 6 for the front and back and 2 kings. Set the ridge-end pairs first, check the ridge for level, then fill in. Each common weighs about 7 lb; one person on the ladder by the ridge nails the top, the other on a step ladder at the wall sets the seat. The plate is 7′ 10 1/2″ above the deck, so never set or nail a seat from the deck.
- Ties and kings. A 2×4 rafter tie, 8′ 0″, goes on the right face of each pair, 3 in all. The two king commons butt the ridge ends and are toe-nailed to them.
- Four hips. Each 2×6 hip runs at 45 degrees in plan from a corner to a ridge end, sloping 19.5 degrees, top edge 1′ 6″ of tail plus 5′ 10 7/8″. Its seat drops 1/4″ so its top corners stay in the roof planes, its top is 2 3/8″ above the plate, both ends get double 45 degree cheek cuts, and the tail is ripped 2 1/16″. A strap tie goes across the lapped plates at each corner first. Two people set each hip (about 15 lb): one beside the ridge end holds the V point in the corner between the end common and the king, the other inside the wall corner sets the seat.
- Jacks, then the post comes out. 16 jacks, centered 1′ 4″ and 2′ 8″ from every corner, the longer one 1′ 5 7/8″ longer, with 45 degree side cuts in two hands, 4 of each per length. Nail them in pairs either side of a hip, then take the post out. Eight tail jacks fill the eave between each hip tail and the first jack.
- King tie. With the post out, a 2×4 on edge runs from king to king on top of the rafter ties, in two pieces (4′ 4 1/4″ and 4′ 1 1/4″) that butt over the middle tie 5′ 1 1/2″ from the left corner and are joined with a 24″ strap. The rafter ties hold the long walls; this holds the end walls.
The hip seat notch is 3 7/16″ of a 5 13/16″ plumb depth, 59%, far past the one-third the commons keep. The plan explains in step 22.4 that the seat sits right over the lapped plates at the corner, so the notch carries no bending, and the tie, toe-nails and strap hold it. Do not cut it deeper than drawn. Our hip roof shed framing guide walks through the same sequence in more detail.
Fascia, soffit, sheathing and shingles on a hip roof
A hip roof has eaves on all four sides and no rakes. The front and back fascia each run 12′ 1 1/2″ long point to long point, made from two 6′ 0 3/4″ pieces joined with a 45 degree scarf centered on the rafter tail 5′ 0″ from the left corner. Each end fascia is one 10′ 1 1/2″ board. All four miter at 45 degrees over the hip tails. The 8 plywood soffit strips are 1′ 0 7/16″ wide, ripped from 3 sheets, and slope with the rafter tails. They meet at the corners on a cut line at 48.2 degrees to the strip’s edge, not 45, because they are sloped.
The roof is about 134 sq ft. Each long plane is cut from three pieces (A, B and C, with C running along the 2′ 0″ ridge) and each end from three more (D, E and F up to the point), and the back and second end are mirror images. Every end joint lands on a rafter center. The drip edge goes on all four eaves before the felt, folded around each corner, and the felt runs from the eaves up with 2″ head laps and 4″ end laps, wrapping 6″ over each hip and the ridge. This roof uses about 170 sq ft of a 400 sq ft roll.
Shingles run 14 courses up each plane at 5″ exposure, over a starter strip on all four eaves. Where a course meets a hip, let it run past, snap a line along the hip and cut it off from the top. About 77 cap pieces, cut three to a shingle from 26 shingles, cover the hips from the eaves up, and the ridge is capped last, starting at the end away from the prevailing wind, so its first pieces lap over the hip caps. Total: 7 bundles.
Roof ventilation on this plan
A hip roof has no gable wall for a high vent, and this plan has no roof vent. The shed has one vent: a 1/4″ gap at the siding under the soffit, backed with insect screen, around all four eaves. The plan says plainly that this gap is the shed’s only vent and that it is low air only. That suits unheated storage. If you plan to heat or insulate the shed, the plan says to plan roof vents as well.
What you can fit in an 8×10 hip roof shed
The plan’s “What fits inside” page draws the room from above, 9′ 5″ across and 7′ 5″ deep inside, with 7′ 7 1/2″ of clear height under the top plates:
- A 42″ deck riding mower, nose in. With both leaves open the door is about 5′ 11 1/2″ clear, so a 42″ deck (4′ 7 3/16″ wide) clears each side by 8 1/8″. The plan adds that a 48″ deck fits with its deflector raised and a 54″ deck does not. Measure your own mower before you buy.
- Parked against the back wall. The plan parks the mower’s nose about 1″ off the back wall, which leaves about 1′ 6″ of cross aisle behind its tail.
- Back-wall shelves, yours to add. There is room for 12″ deep shelves on the back wall in 2 ft runs either side of the mower. They are not on the shopping list.
- A ramp. The deck sits 9 3/4″ above the gravel, so wheels need the ramp from step 27: 6′ 9″ wide, 3′ 6″ out at 1:6 (9 degrees), eight stringers 11 3/8″ on center. Its top sits about 13/16″ below the deck, and the leaf swings out over it with 1 1/4″ to spare. Set the mower deck to its highest cut before you take it up. Our guide on how to build a shed ramp covers the idea in general.
- Headroom under the ties. The rafter ties sit on the plates, 7′ 10 1/2″ above the floor, and the king tie stands on them. Above them the roof is open to the ridge.
- Daylight by the door. Both windows sit at the front end of the side walls, where you load and unload.
Hip roof vs gable roof on an 8×10 shed
We sell both roofs on the same 8×10 footprint, with the same 6 ft door and two windows, so the trade-off is easy to check with numbers from each plan:
| Item | 8×10 hip roof | 8×10 gable |
|---|---|---|
| Overall height | 10′ 11 5/16″ | 10′ 11 5/16″ |
| Roof footprint | 12′ 1 1/2″ x 10′ 1 1/2″ | 10′ 9 1/2″ x 10′ 1 1/2″ |
| Roof sheathing | 8 OSB sheets (7 + 1 spare) | 5 OSB sheets |
| Shingles | 7 bundles | 5 bundles |
| Drip edge | 5 pieces | 8 pieces |
| Hurricane ties | 28 | 14, plus framing angles at the end rafters |
| T1-11 sheets (walls + gables + door leaves) | 12 (10 + 0 + 2) | 12 (9 + 1 + 2) |
| Soffit plywood | 3 sheets | 2 sheets |
| Vents | 1/4″ soffit gap only | Gable vents plus under-eave vents |
| Time for two | About 48 hours | About 48 hours plus the ramp |
The hip roof needs more roof material and more angled cuts: four hips with cheek cuts, 16 jacks in two hands and 8 tail jacks. In return there are no gable triangles to frame and side, no rakes, and an eave over every wall that keeps rain off the siding on all four sides. A hip roof generally holds up to wind better than a gable roof, according to the Building America Solution Center guide to hip vs gable roofs. If you want vents high in the roof or simpler framing, the 8×10 gable shed plan builds the same floor and walls.
Anchoring, tools, ladders and fasteners the plan lists
The plan figures that, empty, this shed on loose skids slides at about 12 psf of wind (gusts near 60 mph) and tips at about 18 psf, and that the bare walls catch wind for days before the roof is on. So in step 13, right after the deck, you set 4 screw-in auger ground anchors, 30″ or longer, with galvanized straps, at 1′ 0″ and 9′ 0″ from the left end on both outside skids. Each strap runs up the skid’s outside face onto the rim, fastened with 1 1/2″ structural screws, 4 into the skid and 2 into the rim. Check your local permit office for what your area asks.
Beyond a circular saw with a rip guide, a speed square, a framing square, a drill/driver and a framing hammer, the tool list adds:
- a miter saw for the door braces (set to 36 degrees) and the trim
- a reciprocating saw or oscillating tool for flush cuts at the threshold and the window openings
- a 3 lb sledge for the pad frame spikes and stakes, and two 24″ bar clamps for marking the rims together
- a 4 ft level, an 8 ft straight board, a string line with a line level and a hand tamper
- a steel bar or pipe, about 3/4″ x 3 ft, for turning the ground anchors
- two 8 ft step ladders, which reach the ridge, and a 16 ft extension ladder for roof work from the eave, about 8′ 8″ up
The fastener schedule gives the nail and count for every joint, from three 16d nails per joist at the rims to three nails through the side cut of every jack. The list counts 21 lb of 16d framing nails, about 730 nails plus 10%.
Free 8×10 hip roof shed plan PDF vs the full plan
The free PDF is an 8-page streamlined version: the five stages (site and foundation, floor, walls, roof, trim and paint) with 3D views and framing previews. It has no material list, no cut list and no measurements.
The full 66-page plan adds every step, the roof framing plan with each rafter center, the ridge and post details, the hip and jack cut marks, the sheathing map, the ramp, the “What fits inside” page, the shopping list and the cut list. It also lists the 95 checks it passed, from framing that closes to sheets and shingles that cover every surface.
Before you build an 8×10 hip roof shed
- Permits. At 80 sq ft and 10′ 11 5/16″ tall, this shed is small, but some towns and HOAs cap height or set setbacks, and rules vary. Check your local permit office before you buy lumber, and use our shed permit checklist to know what to ask. Call 811 a few working days before you dig.
- Snow and wind. The plan uses common small-shed framing. In heavy snow or high-wind areas, ask your local permit office about rafter size, spacing and anchors before you build.
- Skids. Use ground-contact rated pressure-treated 4x4s (UC4A or higher). Our gravel shed foundation guide covers the pad in more depth.
- Safety. Set the ridge and first commons with a helper, stand each ladder on firm, flat footing, stay off open rafters until the sheathing is on, keep ladders and sheets 10 ft from overhead power lines and never work on the roof alone.
- Materials. Store lumber flat and covered, since wet wood decays faster (USDA Forest Products Laboratory Wood Handbook). Check the stamp on each OSB sheet for its span rating (APA: OSB).
- Upkeep. Keep 6″ or more between the siding and the soil, and every spring check for lifted shingles, re-caulk the trim and make sure the skids are still level and dry.
Related plans
- Same size with a gable roof: the 8×10 gable shed plan, or a single slope, the 8×10 lean-to shed plan.
- 2 ft narrower, a square pyramid with a 5 ft door: the 8×8 hip roof shed plan.
- 2 ft wider under the same roof style, with a longer ridge: the 8×12 hip roof shed plan.
- Every hip roof shed plan in one place, or browse all shed plans.
Shed building guides
- 6×12 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×10 Firewood Shed Material List: Lumber, Slats, Hardware
- 8×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×8 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×16 Firewood Shed Material List: Lumber, Slats, Hardware
- 4×12 Firewood Shed Material List: Lumber, Slats, Hardware
Frequently asked questions
How big is the 8×10 hip roof shed?
The walls are 10 ft wide by 8 ft deep, 80 sq ft of floor. With 12 inch eaves on all four sides the roof covers 12 ft 1 1/2 in by 10 ft 1 1/2 in to the fascia faces. The ridge shingles top out 10 ft 11 5/16 in above the ground.
Does the 8×10 hip roof have a ridge?
Yes, a short one. Because the shed is 2 ft longer than it is deep, the four hips meet the two ends of a 2 ft 1 1/2 in 2×6 ridge. It sits on one temporary 2×4 post while you frame, since the plan says the ridge is too short for two posts.
What is on the 8×10 hip roof shed material list?
Every item with its quantity, by section: 3 pressure-treated 4×4 skids, 11 pressure-treated 2x6s for the floor, 3 floor sheets, 12 T1-11 sheets, 8 commons, 4 2×6 hips, 16 jacks and 8 tail jacks, 8 OSB sheets, 7 shingle bundles, 2 windows, 28 hurricane ties, the ramp lumber, nails and 4 gallons of paint.
How long does it take to build the 8×10 hip roof shed?
The plan estimates about 48 hours for two people: 4 for the site and foundation, 5 for the floor, 12 for the walls, 8 for the roof framing, 10 for sheathing, felt and shingles and 9 for the door, windows, trim and paint.
Will a riding mower fit in the 8×10 hip roof shed?
The plan's fit drawing parks a 42 inch deck rider nose in. With both leaves open the door is about 5 ft 11 1/2 in clear, so a 4 ft 7 3/16 in wide deck clears each side by about 8 1/8 in. A 54 inch deck does not fit. Measure yours.
More about the 8×10 hip roof shed plan
Build Your Own 8×10 Hip Roof Storage Shed With Ease!
A Hip Roof Shed, as the name implies, looks classy and at the same time can you give your garden or lawn extra space to store your supplies or hardware. Besides, if you are a hobbyist and you want your very own personal space to work, then having a 8×10 Hip Roof Storage Shed is probably the best idea! So wait no more – order now and start building today…
Shed Plan Includes:
A Full-Fledge Material List with Required Quantity
The materials you use to build a shed are the secrets to your success. Unfortunately, most plans out there won’t precisely tell you what to buy and in what quantity. In fact, they would lure you to buy products from the plan-sellers. Luckily, we have a completely different motto. We want you to succeed in building your dream shed. And for that, we understand how important it is to get the right materials.
Our 8×10 Hip Roof Storage Shed Plan comes with an all-inclusive list of materials, hardware and tools that you would need to build the shed. Nothing more, nothing less! No click baits! You get a printable list of materials that you can take to the hardware store.
Shed Plan Includes:
Simple, Easy to Understand Step by Step Instructions
Who would have ever thought to get their hands on a shed plan that would take them through the entire process with such ease! Our 8×10 Hip Roof Storage Shed Plan comes with easy to understand, step by step instructions for DIY newbies. Don’t worry if you don’t have any experience in building wooden structures. The plan takes you through it in plain words, without jargon. Right from building the foundation to the walls and even the roofing, we have everything covered for you.
Shed Plan Includes:
3D Rendered Images for Reality Check
2D images are a thing of the past! Our 8×10 Hip Roof Storage Shed Plan comes with 3D rendered images, which means you get to see every corner, every angle and every inch clearly as if it is being right in front of you by a professional. You won’t have to scratch your head thinking how the shed should from the front, back or the sides. Even the rooftops are visualized in 3D for better understanding.
Building Your Own Shed vs. Getting Professional Help
1st Reason
You Save What a Builder Would Charge
Probably the most important reason for building your own shed is that you save money. A builder charges for labor on top of the materials, for work you can do yourself. With our 8×10 Hip Roof Storage Shed Plan, you get clear instructions, material lists and diagrams to go through the process easily.
2nd Reason
Choose Your Own Design and Make Your Dream Come True
Don’t fall for the marketing gimmicks of most professionals out there. When you start building your own shed, the world is out there for you to explore. With our material list and instructions, you will realize that you can build your dream shed without any design restrictions. The plan is simple yet it gives you the liberty to add in your own flavor!
3rd Reason
You Will Reclaim Your House Again
Our 8×10 Hip Roof Storage Shed has 120 sq ft of floor for your storage. Whether you garden or play sports, you can use the shed to keep all sorts of your equipment and tools. Besides, the shed will add an exquisiteness to your garden while fulfilling its purpose.
All the Other Reasons
This Is Exactly What You’ll Get with Your 8×10 Hip Roof Storage Shed Plan!
19 step-by-step sections that guide you through the whole process.
Designed for beginners as well as for the professionals.
Explanatory 3D images so you can see exactly what to do next.
Comprehensive materials list that gives you exactly what you need.
Your plan will look great on any mobile device.
PRO-TIPS throughout the build.
High quality PDF plan with everything you need emailed to you instantly.
How to Build a 8×10 Hip Roof Shed: The Steps at a Glance
This is a short overview of how the 8×10 hip roof shed goes together. The full plan PDF has 19 build steps on 66 pages, with the cut length and count of every part, a shopping list with quantities and drawings for the steps.
Step # 1: Check the Rules Where You Live
Rules for sheds, such as size limits, setbacks and permits, vary by town and HOA. Check your local permit office before you build.
Step # 2: Know the Size of Your 8×10 Shed
The shed is 10 ft wide and 8 ft deep (80 sq ft of floor). The walls are 94 1/2″ tall including the plates, with a 6/12 roof. The roof peaks about 10′ 11 5/16″ above the ground. It has a double door in the front wall and 2 windows (24″ by 36″ rough openings). The plan estimates about 48 hours of work for two people.
Step # 3: Get the Tools and Materials
You need basic carpentry tools: a circular saw, a speed square, a drill/driver, a framing hammer or nailer, a 4 ft level and a tape measure. The main materials are pressure-treated 4×4 skids and 2×6 floor joists, 3/4 in tongue and groove plywood, 2×4 studs, 5/8 in T1-11 siding, 2×4 rafters, 7/16 in OSB, roofing felt, drip edge and asphalt shingles. The plan’s shopping list gives the quantity of each.
Step # 4: Build the Foundation and Floor
Lay a compacted gravel pad and set the pressure-treated 4×4 skids level in both directions. Build the floor frame from pressure-treated 2×6 joists 15 in on center, square it by measuring the diagonals, fix it to the skids, then glue and screw the 3/4 in tongue and groove plywood on top.
Important Tips:
- Build the foundation where the shed will stand. Moving a finished shed is hard work.
- Clear plants and loose soil so the pad sits on flat, firm ground.
- Crown every skid up. The floor weight will flatten it.
Step # 5: Frame and Raise the Walls
- Frame each wall flat on the floor with 2×4 studs 16 in on center, with headers over the door and window openings.
- The door rough opening is 6′ 0″ wide by 6′ 4 1/2″ tall.
- Raise each wall with helpers (the plan says how many for each wall), check it plumb with a level, brace it and nail the corners together.
- Cover the walls with 5/8 in T1-11 siding. The plan gives the size of every sheet.
Step # 6: Frame the Roof
- Set the 2×6 ridge and the common rafters that hold it.
- Add the four hip rafters from the wall corners to the ridge.
- Fill in the jack rafters between the hips and the walls, in matching pairs.
- The eaves overhang 12″ on all four sides.
Step # 7: Sheathe and Shingle the Roof
- Nail 7/16 in OSB over the rafters.
- Add roofing felt and drip edge, then the asphalt shingles. Follow the shingle maker’s instructions.
Step # 8: Door, Window and Trim
- Build the door from the plan and hang it.
- Set the windows in their framed openings by the maker’s instructions.
- Add the fascia, soffit and corner trim.
Step # 9: Finishing Touches
- Paint or stain all exposed wood to protect it from the weather.
- Add shelves and hooks to suit what you store.
Want every measurement? The full 8×10 Hip Roof Storage Shed Plan PDF has the shopping list, the cut list and 19 build steps with drawings.
Ready to build the 8×10 hip roof shed?
$19.99 for the full PDF: every step, cut and board. 30-day money-back guarantee.



