A 14×24 hip roof shed material list comes to 110 2×4 framing boards, 46 2x6s, 6 header boards and 53 pressure-treated boards, plus 54 sheets (12 floor, 20 roof OSB, 22 T1-11 siding) and 20 bundles of shingles.
The full plan: this list is printed in the 14×24 hip roof shed plan, with the cut list, a board cutting plan and step-by-step 3D drawings. See the free 14×24 hip roof shed preview PDF first.
14×24 hip roof shed material list: the totals
| What to buy | Qty |
|---|---|
| 2×4 framing boards | 110 |
| 2×6 boards (rafters, joists, trim framing) | 46 |
| 2×8 to 2×12 header boards | 6 |
| Pressure-treated boards and skids | 53 |
| Floor sheets (4×8) | 12 |
| Roof sheathing, 7/16 in OSB (4×8) | 20 |
| T1-11 siding sheets | 22 |
| Shingle bundles (3-tab) | 20 |
| Roofing felt rolls (15 lb) | 2 |
| Drip edge pieces | 10 |
| Hardware and fastener lines | 40 |
Every row on this page comes from the shopping list and cut list of the 3DSHEDPLANS 14×24 hip roof shed plan, 95 items grouped by building stage. Nothing here is a rule of thumb from another size.
What this 14×24 list assumes
- Size: 14 ft deep and 24 ft wide, 336 sq ft of floor.
- Roof: hip roof at 6/12, 3-tab shingles over OSB and 15 lb felt.
- Floor: pressure-treated skids and joists with tongue and groove floor sheets.
- Walls: 2×4 framing with 5/8 in T1-11 siding.
Shopping list by stage
Lumber sizes are nominal: a 2×4 measures about 1 1/2 x 3 1/2 in, as the American Wood Council explains. Check the grade stamp on sheet goods; the APA trademark guide shows how to read it. A row marked – is cut from an offcut of a board already on the list.
Foundation and floor
| Item | Qty | For |
|---|---|---|
| Pressure-treated 2×4 x 16 ft, ground contact (UC4A or higher) | 2 | Skid splice scab (both sides of each skid joint) (10 @ 3′ 0″) |
| Pressure-treated 2×6 x 12 ft | 2 | Rim joist (band) (2 pieces @ 11′ 11 1/4″) |
| Pressure-treated 2×6 x 14 ft | 22 | Rim joist (band) (2 pieces @ 12′ 0 3/4″); Floor joist (19 @ 13′ 9″); Floor joist (second joist at the rim joint) (1 @ 13′ 9″) |
| Pressure-treated 4×4 x 16 ft, ground contact (UC4A or higher) | 5 | Skid (5 pieces @ 16′ 0″) |
| Pressure-treated 4×4 x 8 ft, ground contact (UC4A or higher) | 5 | Skid (5 pieces @ 8′ 0″) |
| Floor decking: sheet 4×8 3/4 T&G plywood | 12 | Floor deck: the lettered pieces on the decking map (step Floor decking) |
Front wall
| Item | Qty | For |
|---|---|---|
| 2×4 x 10 ft | 2 | Front wall plate (2 pieces @ 8′ 0 3/4″) |
| 2×4 x 14 ft | 1 | Front trimmer (2 @ 6′ 4 1/2″) |
| 2×4 x 16 ft | 3 | Front wall plate (2 pieces @ 15′ 11 1/4″); Front wall cap plate (1 piece @ 15′ 8 1/2″) |
| 2×4 x 8 ft | 21 | Front wall cap plate (1 piece @ 7′ 8 1/2″); Front wall stud (19 @ 7′ 6″); Front cripple (5 @ 6 1/4″) |
| 2×8 x 14 ft | 1 | Front header (2×8 doubled + 1/2 ply) (2 @ 6′ 3″) |
| Front header filler: 1/2 plywood strip 2×8 deep, 6′ 3″ long | – | Not bought separately: rip it from the 1/2 in plywood sheet for the eave soffit (Fascia and soffit list); buy that sheet now, with the walls |
Back wall
| Item | Qty | For |
|---|---|---|
| 2×4 x 12 ft | 2 | Back wall plate (2 pieces @ 11′ 11 1/4″) |
| 2×4 x 14 ft | 2 | Back wall plate (2 pieces @ 12′ 0 3/4″) |
| 2×4 x 16 ft | 1 | Back wall cap plate (1 piece @ 15′ 8 1/2″) |
| 2×4 x 8 ft | 23 | Back wall cap plate (1 piece @ 7′ 8 1/2″); Back wall stud (22 @ 7′ 6″) |
Left wall
| Item | Qty | For |
|---|---|---|
| 2×4 x 14 ft | 4 | Left wall plate (2 @ 13′ 4 3/4″); Left wall cap plate (1 @ 14′ 0″); Left trimmer (2 @ 6′ 6″) |
| 2×4 x 8 ft (1 of them a full 96 in board, not a 92 5/8 in precut stud) | 13 | Left wall stud (11 @ 7′ 6″); Left lower cripple (2 @ 3′ 4 1/2″); Left sill (1 @ 3′ 0″) |
| 2×6 x 8 ft | 1 | Left header (2×6 doubled + 1/2 ply) (2 @ 3′ 3″) |
| Left cripple: 2×4, 2 @ 6 1/2″ | – | Not bought separately: cut from the front trimmer offcuts |
| Left header filler: 1/2 plywood strip 2×6 deep, 3′ 3″ long | – | Not bought separately: rip it from the 1/2 in plywood sheet for the eave soffit (Fascia and soffit list); buy that sheet now, with the walls |
Right wall
| Item | Qty | For |
|---|---|---|
| 2×4 x 14 ft | 4 | Right wall plate (2 @ 13′ 4 3/4″); Right wall cap plate (1 @ 14′ 0″); Right trimmer (2 @ 6′ 6″) |
| 2×4 x 8 ft | 13 | Right wall stud (11 @ 7′ 6″); Right lower cripple (2 @ 3′ 4 1/2″); Right sill (1 @ 3′ 0″) |
| 2×6 x 8 ft | 1 | Right header (2×6 doubled + 1/2 ply) (2 @ 3′ 3″) |
| Right cripple: 2×4, 2 @ 6 1/2″ | – | Not bought separately: cut from the left lower cripple offcuts |
| Right header filler: 1/2 plywood strip 2×6 deep, 3′ 3″ long | – | Not bought separately: rip it from the 1/2 in plywood sheet for the eave soffit (Fascia and soffit list); buy that sheet now, with the walls |
Wall siding
| Item | Qty | For |
|---|---|---|
| Wall siding: sheet 4×8 5/8 T1-11 | 20 | Wall siding and sheathing in one: the lettered pieces on each wall’s siding map |
Roof framing
| Item | Qty | For |
|---|---|---|
| 2×4 x 12 ft | 2 | King tie, left piece (on top of the rafter ties, king to the middle tie) (1 @ 11′ 7 3/4″); King tie, right piece (on top of the rafter ties, king to the middle tie) (1 @ 11′ 4 3/4″) |
| 2×4 x 16 ft | 9 | Rafter tie (every pair of commons, at the plates) (9 @ 14′ 0″) |
| 2×6 x 10 ft | 20 | Common rafter (20 @ 9′ 1 1/4″) |
| 2×6 x 12 ft | 5 | Jack rafter 3 of 5 (45 deg side cut) (8 @ 5′ 2 3/4″); Tail jack (short, on the wall line, 45 deg side cut, no seat) (8 @ 1′ 3 13/16″) |
| 2×6 x 14 ft | 4 | Jack rafter 4 of 5 (45 deg side cut) (8 @ 6′ 6 7/16″) |
| 2×6 x 8 ft | 15 | Jack rafter 1 of 5 (shortest, 45 deg side cut) (8 @ 2′ 7 1/2″); Jack rafter 2 of 5 (45 deg side cut) (8 @ 3′ 11 1/8″); Jack rafter 5 of 5 (longest, 45 deg side cut) (8 @ 7′ 10 1/16″) |
| 2×8 x 12 ft | 1 | Ridge board (1 @ 10′ 1 1/2″) |
| 2×8 x 14 ft | 4 | Hip rafter (4 @ 12′ 1 7/16″) |
Roof covering
| Item | Qty | For |
|---|---|---|
| Roof sheathing: sheet 4×8 7/16 OSB | 20 | Roof deck: the lettered pieces on the sheathing map, cut as in its sheet cutting plan, plus 1 spare sheet |
| Static roof vent (slant-back louver with screen, about 16 x 20 in flange, rated 60 sq in net free area or more): each | 3 | High air out: one per marked bay near the top of the back plane (Roof sheathing, felt and shingles step) |
| Roofing felt: roll 15 lb (400 sq ft) | 2 | Underlayment over the roof sheathing, under the shingles |
| Asphalt shingles: bundle 3-tab, 26 shingles, incl. starter and hip/ridge cap | 20 | Starter strips, the roof courses and the cap pieces (Shingles step) |
| Drip edge: 10 ft piece | 10 | All four eaves, under the felt (a hip roof has no rakes) |
Fascia and soffit
| Item | Qty | For |
|---|---|---|
| 1×8 x 10 ft | 4 | Fascia (eave, ends, piece 1, along the outside face) (2 @ 8′ 0 3/4″); Fascia (eave, ends, piece 2, along the outside face) (2 @ 8′ 0 3/4″) |
| 1×8 x 14 ft | 4 | Fascia (eave, front and back, piece 1, along the outside face) (2 @ 13′ 0 3/4″); Fascia (eave, front and back, piece 2, along the outside face) (2 @ 13′ 0 3/4″) |
| Eave soffit (ripped 1/2 plywood): sheet 4×8 1/2 plywood | 4 | Soffit strips under the eaves (Fascia and soffit step) |
Door, window and trim
| Item | Qty | For |
|---|---|---|
| 1×2 x 8 ft | 2 | Door stop (header) (1 @ 6′ 0″); Door astragal (fixed leaf edge) (1 @ 6′ 4 3/4″) |
| 1×4 x 14 ft | 3 | Door casing (sides) (2 @ 6′ 9 1/2″); Door stile (4 @ 6′ 5 1/4″) |
| 1×4 x 16 ft | 4 | Corner trim (8 @ 7′ 11 1/8″) |
| 1×4 x 8 ft | 9 | Door casing (head, between the side casings) (1 @ 6′ 0″); Window casing (sides) (2 @ 3′ 0″); Window casing (head and sill) (2 @ 3′ 7″); Window casing (sides) (2 @ 3′ 0″); Window casing (head and sill) (2 @ 3′ 7″); Door rail (6 @ 2′ 4 5/8″); Door Z brace (along either edge) (4 @ 3′ 5 5/16″) |
| Door leaf siding (one new sheet per leaf; the cut-out is too short): sheet 4×8 5/8 T1-11 | 2 | The two door leaves (Door step) |
| Door hinges (heavy T-strap, 8 in strap or longer, galvanized): each | 6 | Hanging the door leaves |
| Door handle and latch (pull handle + gate latch or hasp with a padlock loop): set | 1 | The active door leaf |
| Door sweep, brush type, 36 in, with its screws (cut to 2′ 11 1/16″ for the active leaf and 2′ 10 13/16″ for the fixed leaf): each | 2 | The bottom edge of each door leaf, inside face (Door step) |
| Door hold-open hook and eye, 10 in galvanized: each | 2 | Holding the open door in wind (Door step) |
| Prefabricated window, 36 x 36 in rough opening: each | 2 | The window opening (window step) |
Ramp
| Item | Qty | For |
|---|---|---|
| Pressure-treated 2×10 x 8 ft, ground contact (UC4A or higher) | 2 | Ramp stringer blank (two tapered stringers from each piece) (4 @ 3′ 6″) |
| Pressure-treated 2×4 x 8 ft, ground contact (UC4A or higher) | 2 | Ramp ledger (on the rim joist and skid) (1 @ 6′ 9″); Ramp ledger filler (PT 2×4 laid flat behind the ledger, notched over the splice scab) (1 @ 6′ 9″) |
| Pressure-treated 2×6 x 14 ft, ground contact (UC4A or higher) | 4 | Ramp deck board (8 @ 6′ 9″) |
| Ramp hook-and-eye latches, 4 in galvanized: each | 2 | Holding the ramp to its ledger (step Build the ramp) |
| Ramp screws 3 in exterior deck screws (2 per board per stringer): each | 145 | The ramp boards into the stringers (step Build the ramp) |
| Structural screws 5 in, 1/4 in exterior (ramp ledger into the rim joist and the skid): each | 12 | The ramp ledger into the rim joist and the skid (step Build the ramp) |
| Anti-slip grit tape for the ramp boards, 2 in x 15 ft (one strip along each board): roll | 4 | One strip along each ramp board (step Build the ramp) |
Hardware
| Item | Qty | For |
|---|---|---|
| Carriage bolts 1/4 x 2 in, galvanized, with washers and nuts (3 per hinge strap): each | 18 | The hinge straps on the door leaf, nuts inside (Door step) |
| Aluminum threshold cap (angle about 1 x 1 1/2 in), 6 ft piece: each | 1 | The deck edge across the door opening (Door step) |
| Barrel bolts for the fixed leaf (3 in, 1 1/2 in wide or narrower, to fit on the astragal): each | 2 | Holding the fixed leaf closed, top and bottom |
| Framing nails 3 1/2 in (16d) hot-dip galvanized (about 1436 nails + 10 %): lb | 40 | Every framing joint (fastener schedule) |
| Siding nails 2 1/2 in (8d) hot-dip galvanized: lb | 22 | T1-11 siding and trim |
| Sheathing nails 2 1/2 in (8d) for OSB: lb | 14 | Roof sheathing: 6 in apart on the edges, 12 in in the field |
| Roofing nails 1 1/4 in galvanized: lb | 14 | Shingles and drip edge |
| Deck screws 2 in (or 6d ring-shank nails): lb | 9 | Floor decking: 6 in apart on the edges, 12 in in the field |
| Construction adhesive, 10 oz tubes: each | 14 | A bead on each joist under the floor decking |
| Hurricane ties (rafter to plate), H2.5A type or equal, 10 nails each; at the 4 hip corners use skewable ties: each | 64 | Each rafter to the top plate |
| Framing angles for the floor frame on the skids, one at every joist-to-skid crossing (A34 type, about 2 1/2 in long, 18 ga galvanized, or equal), 8 connector nails each: each | 100 | One at every joist-to-skid crossing (Floor frame step) |
| Strap ties across the top-plate corners under the hips: each | 4 | Across the lapped top-plate corners, nailed on before the hips go up |
| Flat strap tie for the king-tie splice: 18 ga galvanized, 1 1/4 in wide x 24 in long or longer (a Simpson LSTA24 or equal): each | 1 | Joining the two king-tie pieces across their top edges (Roof framing) |
| Temporary ridge posts 2×4 x 12 ft (reuse later): each | 2 | Holding the roof framing up until the rafters are in, reused later |
| Ground anchors, screw-in auger type, 30 in or longer, galvanized, each with a galvanized steel strap (an empty shed on skids slides in a strong gust: Anchor the shed): each | 10 | Holding the shed down in wind: along the two outside skids (Anchor the shed step) |
| Structural wood screws 1 1/2 in, exterior (anchor straps: 4 into the skid and 2 into the rim per anchor): each | 60 | Each ground-anchor strap to the outside skid and the rim joist (Anchor the shed step) |
| Crushed stone 3/4 in for the pad (loose, before tamping): cu yd | 7.0 | The gravel pad under the skids (Preparation step) |
| Pressure-treated 4×6 x 10 ft, ground contact (UC4A or higher), for the gravel pad frame: each | 5 | The frame around the gravel pad and the landing (Preparation step) |
| Pressure-treated 4×6 x 16 ft, ground contact (UC4A or higher), for the gravel pad frame: each | 4 | The frame around the gravel pad and the landing (Preparation step) |
| Rebar stakes 1/2 in (#4) x 24 in, for the pad frame: each | 38 | Pinning the pad frame to the ground: about every 4 ft and near each end of every piece (Preparation step) |
| Galvanized timber spikes 3/8 in x 10 in for the pad frame corners (2 per corner): each | 16 | Joining the pad frame’s corners (Preparation step) |
| Exterior paint and primer in one (2 coats, about 863 sq ft each): gallon | 7 | Siding, trim and door, two coats |
| Exterior caulk: tube | 3 | Trim joints and the window and door casings |
| Roofing cap nails 1 in (felt): lb | 3 | Holding the felt down |
| Wood shims (door and window): bundle | 1 | Plumbing the door and the window in their openings |
| Roofing cement, 10 oz tubes (cap and roof vents): each | 3 | Bedding the top cap piece(s) and the roof vent flanges, and sealing any exposed nail heads |
| Exterior screws 1 1/4 in (door frame to T1-11): lb | 1 | Door frame boards to the T1-11 leaves |
| Exterior screws 3 in (hinge T-parts through the casing into the framing; wall corners where a hammer will not swing): box | 1 | Hinge T-parts through the casing into the king stud and trimmer |
| Exterior screws 3 1/2 in (roof foot stops): box | 1 | The roof foot stops: 2 through the 2×4 and the sheathing into each rafter it crosses |
| Exterior screws 2 1/2 in (temporary roof post cleats): box | 1 | The cleats on the temporary roof posts (roof framing step) |
| Connector nails 1 1/2 in (hurricane ties and straps): lb | 15 | Every hurricane tie and the strap ties |
| Flashing tape 4 in (window opening): roll | 1 | Wrapping the window rough opening |
| Drip cap (Z-flashing) over the window and door head casings, 10 ft: each | 2 | Over the window and door head casings |
| Staples 3/8 in for the staple gun (insect screen): box | 1 | Behind the soffit vent gaps |
| Insect screen for the soffit vent gaps, 2 ft x 25 ft: roll | 2 | Behind the soffit vent gaps |
| Temporary braces 2×4 x 12 ft (reuse later): 2 plumb braces per wall section and the diagonal each section is squared with; each wall’s plumb braces come off once that wall is sided: each | 18 | Holding the walls plumb and square until the siding is on, reused later |
| 2×4 x 8 ft for the flat decking seam blocks (step Floor decking): each | 3 | Flat 2×4 blocks between the joists under the last decking seam (dashed on the decking map) |
| Temporary ridge post braces 2×4 x 8 ft (2 per post, reuse later): each | 4 | Bracing the temporary posts, reused later |
| 2×4 x 8 ft for 12 stakes 24 in, pointed (one per plumb brace): each | 4 | Staking the plumb braces outside the walls |
| 2×4 x 8 ft for 16 deck cleats 12 in (one per plumb brace once it moves inside, 4 for the temporary post braces): each | 3 | Screwed to the deck to hold the brace feet inside |
Cut list: every part
Cut and label the parts one stage at a time. The cutting plan in the PDF shows which board each part comes from.
| Part | Lumber | Cut length | Qty |
|---|---|---|---|
| Skid | PT 4×4 | 24′ 0″ | 5 |
| Rim joist (band) | PT 2×6 | 24′ 0″ | 2 |
| Floor joist | PT 2×6 | 13′ 9″ | 19 |
| Skid splice scab (both sides of each skid joint) | PT 2×4 | 3′ 0″ | 10 |
| Floor joist (second joist at the rim joint) | PT 2×6 | 13′ 9″ | 1 |
| Front wall plate | 2×4 | 24′ 0″ | 2 |
| Front wall cap plate | 2×4 | 23′ 5″ | 1 |
| Front wall stud | 2×4 | 7′ 6″ | 19 |
| Front cripple | 2×4 | 6 1/4″ | 5 |
| Front header (2×8 doubled + 1/2 ply) | 2×8 | 6′ 3″ | 2 |
| Front trimmer | 2×4 | 6′ 4 1/2″ | 2 |
| Back wall plate | 2×4 | 24′ 0″ | 2 |
| Back wall cap plate | 2×4 | 23′ 5″ | 1 |
| Back wall stud | 2×4 | 7′ 6″ | 22 |
| Left wall plate | 2×4 | 13′ 4 3/4″ | 2 |
| Left wall cap plate | 2×4 | 14′ 0″ | 1 |
| Left wall stud | 2×4 | 7′ 6″ | 11 |
| Left cripple | 2×4 | 6 1/2″ | 2 |
| Left header (2×6 doubled + 1/2 ply) | 2×6 | 3′ 3″ | 2 |
| Left lower cripple | 2×4 | 3′ 4 1/2″ | 2 |
| Left sill | 2×4 | 3′ 0″ | 1 |
| Left trimmer | 2×4 | 6′ 6″ | 2 |
| Right wall plate | 2×4 | 13′ 4 3/4″ | 2 |
| Right wall cap plate | 2×4 | 14′ 0″ | 1 |
| Right wall stud | 2×4 | 7′ 6″ | 11 |
| Right cripple | 2×4 | 6 1/2″ | 2 |
| Right header (2×6 doubled + 1/2 ply) | 2×6 | 3′ 3″ | 2 |
| Right lower cripple | 2×4 | 3′ 4 1/2″ | 2 |
| Right sill | 2×4 | 3′ 0″ | 1 |
| Right trimmer | 2×4 | 6′ 6″ | 2 |
| Common rafter | 2×6 | 9′ 1 1/4″ | 20 |
| Hip rafter | 2×8 | 12′ 1 7/16″ | 4 |
| Jack rafter 1 of 5 (shortest, 45 deg side cut) | 2×6 | 2′ 7 1/2″ | 8 |
| Jack rafter 2 of 5 (45 deg side cut) | 2×6 | 3′ 11 1/8″ | 8 |
| Jack rafter 3 of 5 (45 deg side cut) | 2×6 | 5′ 2 3/4″ | 8 |
| Jack rafter 4 of 5 (45 deg side cut) | 2×6 | 6′ 6 7/16″ | 8 |
| Jack rafter 5 of 5 (longest, 45 deg side cut) | 2×6 | 7′ 10 1/16″ | 8 |
| Tail jack (short, on the wall line, 45 deg side cut, no seat) | 2×6 | 1′ 3 13/16″ | 8 |
| Ridge board | 2×8 | 10′ 1 1/2″ | 1 |
| Rafter tie (every pair of commons, at the plates) | 2×4 | 14′ 0″ | 9 |
| King tie, left piece (on top of the rafter ties, king to the middle tie) | 2×4 | 11′ 7 3/4″ | 1 |
| King tie, right piece (on top of the rafter ties, king to the middle tie) | 2×4 | 11′ 4 3/4″ | 1 |
| Fascia (eave, front and back, piece 1, along the outside face) | 1×8 | 13′ 0 3/4″ | 2 |
| Fascia (eave, front and back, piece 2, along the outside face) | 1×8 | 13′ 0 3/4″ | 2 |
| Fascia (eave, ends, piece 1, along the outside face) | 1×8 | 8′ 0 3/4″ | 2 |
| Fascia (eave, ends, piece 2, along the outside face) | 1×8 | 8′ 0 3/4″ | 2 |
| Corner trim | 1×4 | 7′ 11 1/8″ | 8 |
| Door casing (sides) | 1×4 | 6′ 9 1/2″ | 2 |
| Door casing (head, between the side casings) | 1×4 | 6′ 0″ | 1 |
| Window casing (sides) | 1×4 | 3′ 0″ | 2 |
| Window casing (head and sill) | 1×4 | 3′ 7″ | 2 |
| Window casing (sides) | 1×4 | 3′ 0″ | 2 |
| Window casing (head and sill) | 1×4 | 3′ 7″ | 2 |
| Door stile | 1×4 | 6′ 5 1/4″ | 4 |
| Door rail | 1×4 | 2′ 4 5/8″ | 6 |
| Door Z brace (along either edge) | 1×4 | 3′ 5 5/16″ | 4 |
| Door stop (header) | 1×2 | 6′ 0″ | 1 |
| Door astragal (fixed leaf edge) | 1×2 | 6′ 4 3/4″ | 1 |
| Ramp stringer blank (two tapered stringers from each piece) | PT 2×10 | 3′ 6″ | 4 |
| Ramp deck board | PT 2×6 | 6′ 9″ | 8 |
| Ramp ledger (on the rim joist and skid) | PT 2×4 | 6′ 9″ | 1 |
| Ramp ledger filler (PT 2×4 laid flat behind the ledger, notched over the splice scab) | PT 2×4 | 6′ 9″ | 1 |
Before you order
Rules for sheds vary by town and HOA, so check your local permit office before you buy lumber. Keep every part that touches the ground pressure treated: the USDA Wood Handbook explains why wet, untreated wood decays. The shed foundation options guide compares skids, blocks and gravel pads, and the shed material calculator checks totals fast.
Get the full plan
The 14×24 hip roof shed plan is a 3DSHEDPLANS PDF with this material list, the cutting plan and step-by-step 3D drawings from the skids to the shingles. See the free 14×24 hip roof shed preview PDF to check the format, or compare sizes on the hip roof shed plans.
Frequently asked questions
How many 2x4s do I need for a 14×24 hip roof shed?
110 2×4 framing boards in the stock lengths listed by stage below, plus 46 2x6s, 6 header boards and 53 pressure-treated boards for the floor and base.
How many sheets of plywood, OSB and T1-11 for a 14×24 hip roof shed?
12 floor sheets, 20 sheets of 7/16 in OSB for the roof and 22 sheets of 5/8 in T1-11 siding. The tables below list each one with what it is for.
How many bundles of shingles for a 14×24 hip roof shed roof?
20 bundles of 3-tab shingles including the starter course, over 2 rolls of 15 lb felt and 10 pieces of drip edge.
What rafters does the 14×24 hip roof shed use?
75 rafter parts in all, 10 cut lengths from 11' 4 3/4" to 9' 1 1/4". Each part and its length is in the cut list below. For snow loads, check your local permit office.
Is there a printable 14×24 hip roof shed plan with this list?
Yes. The 14×24 hip roof shed plan PDF prints this list, the cut list and a board cutting plan with step-by-step 3D drawings. Its free preview PDF shows the format first.
Shed building guides
- 8×8 Lean-To Shed Material List: Lumber, Sheets, Hardware
- 8×8 Hip Roof Shed Material List: Lumber, Sheets, Hardware
- 8×20 Lean-To Shed Material List: Lumber, Sheets, Hardware
- 8×20 Hip Roof Shed Material List: Lumber, Sheets, Hardware
- 8×16 Gable Shed Material List: Lumber, Sheets, Hardware
- 8×14 Lean-To Shed Material List: Lumber, Sheets, Hardware