A 12×16 shed material list for a gable shed on skids comes to 139 2x4s (117 for framing), 15 pressure-treated 2×6 boards for the floor, 6 sheets of 3/4 in plywood, 9 of OSB, 18 of T1-11 and 11 shingle bundles, for 94 1/2 in walls, a 6/12 roof, 12 in eaves and 16 in spacing.

Every quantity and cut length on this page comes from the shopping list, cut list and cutting plan in the 3DSHEDPLANS 12×16 gable shed plan PDF. The list counts what to buy by stock length, and the plan checks stud gaps, header depth and every roof sheet joint landing on a rafter. The list below matches the plan line for line: one 72 in double door, two 36 x 36 in windows and a detachable ramp.

What this 12×16 list assumes

The plan is a gable shed 12 ft deep and 16 ft wide, with 192 sq ft of floor and the ridge running the 16 ft way. These are its settings:

  • Walls: 94 1/2 in tall including the bottom plate and double top plate, so wall studs are cut to 90 in (7′ 6″).
  • Spacing: studs, floor joists and rafters all at 16 in on center.
  • Roof: 6/12 pitch, 2×4 rafters, a 2×6 ridge board, 12 in eave overhang and 4 in rake overhang. The roof footprint is 16′ 9 1/2″ by 14′ 1 1/2″.
  • Floor: four pressure-treated 4×4 x 16 ft skids on a crushed stone pad, with 13 2×6 joists cut to 11′ 9″ at 16 in on center between two 16 ft rim joists, and 3/4 in tongue and groove plywood on top.
  • Loads: the 2×4 rafters were checked at 30 psf ground snow (SPF #2 at 16 in, 72 in run). That is the plan’s design assumption; if your area’s snow load may be higher, check your local permit office before you buy rafter stock.
  • Openings: a 72 in wide by 76 1/2 in tall rough opening for a double door in the 16 ft front wall, and two windows, each a 36 x 36 in rough opening, one in each 12 ft side (gable) wall.
  • Heights: the floor sits 9 3/4 in above the ground, the walls top out at 8′ 8 1/4″ and the peak at 11′ 11 5/16″. The door has 6′ 5 1/4″ of clear height under the head stop.
  • Ramp: a detachable pressure-treated ramp, 6′ 9″ wide and 3′ 6″ out from the door, at a 1:6 slope.
  • Time: the plan estimates about 76 hours for two people: 6 for the site and skids, 8 for the floor, 19 for the walls, 13 for roof framing, 16 for sheathing and shingles and 14 for the door, windows, trim and paint.

Shopping list by stage: the full 12×16 shed material list

Lumber sizes are nominal. A 2×4 measures about 1 1/2 x 3 1/2 in, as the American Wood Council explains. Check the grade stamp on plywood and OSB; the APA trademark guide shows how to read it.

Foundation and floor

Item Qty Used for
Pressure-treated 4×4 x 16 ft, tagged for ground contact 4 Skids
Pressure-treated 2×6 x 12 ft 13 Floor joists, cut to 11′ 9″
Pressure-treated 2×6 x 16 ft 2 Rim joists (4 more 14 ft boards are for the ramp)
3/4 in T&G plywood, 4×8 sheet 6 Floor decking
1×4 x 8 ft 2 Decking filler strips, ripped to 1 1/2 in
Crushed stone 3/4 in, loose 4.5 cu yd Gravel pad, before tamping
Pressure-treated 4×6 x 16 ft, ground contact 5 Pad frame
Pressure-treated 4×6 x 8 ft, ground contact 1 Pad frame
Rebar stakes 1/2 in x 24 in 32 Pad frame
Galvanized timber spikes 3/8 x 10 in 16 Pad frame corners
Deck screws 2 in (or 6d ring-shank nails), rated for treated lumber 5 lb Decking
Ground anchors, screw-in auger type, 30 in or longer, with straps 6 Anchoring the skids
Structural wood screws 1 1/2 in, exterior 36 Anchor straps

Walls and roof framing

Item Qty Used for
2×4 x 8 ft 86 Wall studs, cripples, sills, rafters and fly rafters, frieze blocks, gable studs, center gable studs, ridge cleat
2×4 x 10 ft 1 Gable end studs
2×4 x 12 ft 10 Side wall plates and cap plates, collar ties, gable end studs
2×4 x 14 ft 14 Door and window trimmers, rafter ties
2×4 x 16 ft 6 Front and back wall plates and cap plates
2×6 x 8 ft 3 Window headers (one board per window), one ridge piece
2×6 x 10 ft 1 Ridge piece
2×8 x 14 ft 1 Door header
Hurricane ties, H2.5A type or equal 22 Rafter to plate
Framing angles, A34 type or equal 4 End rafters at the 4 corners
Temporary braces 2×4 x 12 ft 17 12 plumb braces and squaring diagonals, 4 for the center gable studs and 1 post under the ridge joint, reused later
2×4 x 8 ft 3 8 pointed brace stakes, 24 in each
2×4 x 8 ft 2 12 deck cleats, 12 in each, for the braces and the center gable studs

The 30 rafters and fly rafters each take a full 8 ft board, so 33 of the 91 2×4 x 8 ft boards in the yard order must be full 96 in boards, not 92 5/8 in precut studs: the rafters, a lower cripple board, a sill board and the center gable stud board. The three header filler strips of 1/2 in plywood are ripped from a soffit sheet, so buy the soffit plywood with the wall lumber. The 117 framing boards and the 22 boards for braces, stakes and cleats put 139 2x4s on the truck. The plan adds that you should buy 2 or 3 spare studs for bad boards.

Roof covering

Item Qty Used for
7/16 in OSB, 4×8 sheet 9 Roof sheathing
15 lb felt, 400 sq ft roll 1 Underlayment
3-tab shingles, 26 per bundle 11 bundles Roof, starter course and ridge cap
Drip edge, 10 ft 8 Eaves and rakes
Roofing nails 1 1/4 in galvanized 8 lb Shingles
Roofing cap nails 1 in 2 lb Felt
Roofing cement, 10 oz tube 2 Ridge and edges
Louvered gable vent 12 x 18 in 2 Gable ventilation
Under-eave vent 16 x 8 in, screened 6 Air in under the eaves
Insect screen, 2 ft x 25 ft 1 roll Vent holes and gaps

Siding and trim

Item Qty Used for
5/8 in T1-11, 4×8 sheet 14 Walls
5/8 in T1-11, 4×8 sheet 2 Gable triangles
5/8 in T1-11, 4×8 sheet 2 Door leaves (one per leaf)
1/2 in plywood, 4×8 sheet 2 Eave soffits and header fillers
Z-flashing, 10 ft 3 Wall siding to gable siding joint
Drip cap, 10 ft 2 Over the door and window head casings
1×6 x 10 ft 6 Two 9′ 8″ eave fascia pieces and four rake fascia boards
1×6 x 8 ft 2 Two 7′ 0″ eave fascia pieces
1×4 x 16 ft 2 Corner trim on the eave walls
1×4 x 14 ft 3 Door casing sides, door stiles
1×4 x 8 ft 13 Gable-wall corner trim, door head casing, door rails and Z braces, window casings
1×2 x 8 ft 2 Door stop and astragal
Exterior paint and primer in one 5 gal Two coats, about 676 sq ft each
Exterior caulk 3 tubes Trim

Ramp

Item Qty Used for
Pressure-treated 2×10 x 8 ft 2 Stringers (two tapered stringers from each board)
Pressure-treated 2×6 x 14 ft 4 8 deck boards, 6′ 9″ each
Pressure-treated 2×4 x 8 ft 1 Ledger on the rim joist and skid
Exterior deck screws 3 in 141 Boards into the stringers
Structural screws 3 in, 1/4 in 12 Ledger into the rim joist and skid
Hook-and-eye latches, 4 in 2 Holding the ramp to its ledger
Anti-slip grit tape, 2 in x 15 ft 4 rolls One strip along each board

Hardware and windows

Item Qty
Framing nails 3 1/2 in (16d), hot-dip galvanized 38 lb
Siding nails 2 1/2 in (8d), hot-dip galvanized 17 lb
Sheathing nails 2 1/2 in (8d) for OSB 8 lb
Connector nails 1 1/2 in for the ties 3 lb
Construction adhesive, 10 oz tube 9
T-strap door hinges 6
Carriage bolts 1/4 x 2 in with washers and nuts 18
Door handle and latch set 1
Barrel bolts for the fixed leaf 2
Door hold-open hook and eye, 10 in 2
Brush door sweeps, 36 in 2
Aluminum threshold cap, 6 ft 1
Exterior screws 1 1/4 in (door frame to T1-11, soffit vent flanges) 1 lb
Exterior screws 3 in (hinge straps into framing) 1 box
Prefabricated window, 36 x 36 in rough opening 2
Flashing tape 4 in 1 roll
Wood shims 1 bundle
Staples 3/8 in for the insect screen 1 box

Cut list highlights

Most of the cut list is square cuts: 45 wall studs at 7′ 6″ (12 front, 15 back, 9 left, 9 right), 13 floor joists at 11′ 9″ and four skids at a full 16′ 0″. The parts below have angles, overhangs or stacked sizes. Rafters, lookouts and frieze blocks repeat up to 30 times, so cut one rafter as a pattern and one 1′ 1″ frieze block for the 20 middle blocks.

Part Lumber Cut length Qty
Rafter (board length, see below) 2×4 7′ 10 13/16″ 26
Fly rafter (rake) 2×4 7′ 10 13/16″ 4
Ridge board (spliced) 2×6 16′ 8″ 1
Rafter tie (interior pairs, at the plates) 2×4 12′ 0″ 11
Collar tie 2×4 5′ 6 9/16″ 6
Lookout block (rake overhang) 2×4 2 1/2″ 20
Frieze block (over the eave walls, top beveled) 2×4 1′ 0 1/4″, 1′ 1″ and 1′ 1 3/4″ 2, 20 and 2
Door header (2×8 doubled + 1/2 ply) 2×8 6′ 3″ 2
Door trimmer 2×4 6′ 4 1/2″ 2
Window header (2×6 doubled + 1/2 ply), per window 2×6 3′ 3″ 2
Window trimmer, per window 2×4 6′ 6″ 2
Center gable stud (under the ridge) 2×4 2′ 8 13/16″ 2
Gable end studs 2×4 11 1/16″, 1′ 7 1/16″, 2′ 3 1/16″, 2′ 11 1/16″ 4 each
Gable corner nailer (flat on the cap plate under each end rafter) 2×4 9 5/8″ 4
Gable vent sill and header (flat) 2×4 1′ 2 1/2″ 4
Front and back wall plates 2×4 16′ 0″ 4
Front and back cap plates 2×4 15′ 5″ 2
Side wall plates 2×4 11′ 4 3/4″ 4
Side wall cap plates 2×4 12′ 0″ 2

Rafters. The 7′ 10 13/16″ figure is the board each rafter needs, measured along the board from the long point of the ridge plumb cut to the long point of the tail plumb cut, including the 12 in eave overhang. The top edge between the two plumb cuts is shorter, 7′ 9 1/16″, so do not lay out 7′ 10 13/16″ along the top edge. Each rafter takes its own 8 ft board with about 1 1/16″ left over, so square the end before you mark it.

Mark the plumb cuts with a speed square pivoted to 6 on the common scale (26.6 degrees). The birdsmouth seat is 2 1/2 in, which keeps the notch to about 1 1/4 in deep, under a third of the 2×4’s depth. Cut one pattern rafter, test it on both walls, then trace the other 25. The 4 fly rafters hang off the lookout blocks and the ridge extension, so they get the ridge plumb cut but no birdsmouth.

Ridge. The ridge runs 16′ 8″ because it carries 4 in past each gable wall to the fly rafters that form the rake overhang. No board on the list is longer than 16 ft, so it goes up in two pieces, 9′ 8″ and 7′ 0″, with the joint centered on a rafter pair and a temporary 2×4 post under it until the pairs on both sides are nailed.

Headers. The 72 in door opening gets a doubled 2×8 header (two 6′ 3″ pieces from one 14 ft board) with a 1/2 in plywood filler, on trimmers cut to 6′ 4 1/2″, with five 6 1/4″ cripples above it. Each window gets a doubled 2×6 header (two 3′ 3″ pieces) on 6′ 6″ trimmers, two 6 1/2″ cripples above, a 3′ 0″ sill and two 3′ 4 1/2″ cripples below.

Gable studs. The gable triangles sit on the 12 ft side walls, so their size depends on the 12 ft depth. They step up 8 in at a time on a 6/12 roof with 16 in spacing: each gable gets two studs at each of the four lengths, 11 1/16″ to 2′ 11 1/16″, plus a 2′ 8 13/16″ center stud under the ridge. Measure each one off your actual end rafter before cutting, since a small difference in the ridge height shows up here first.

Plates. The front and back walls run 16′ 0″ at the bottom with 15′ 5″ cap plates. The side walls run 11′ 4 3/4″ at the bottom with 12′ 0″ cap plates that lap over the front and back walls and lock the corners.

Gable vs lean-to: what changes

The gable column is the plan PDF. We also ran the same 12×16 footprint as a lean-to (single-slope) roof at 3/12, with an 80 in low back wall. The floor comes out identical; the walls and roof change a lot.

Item Gable (6/12) Lean-to (3/12)
Rafters 26 2×4 at 7′ 10 13/16″ + 4 fly 13 2×6 at 13′ 10 1/4″ + 2 fly
Ridge board 2×6, cut 16′ 8″ from two boards None
Wall studs 7′ 6″ on all four walls 9′ 2 5/8″ front, 6′ 3 1/2″ back, stepped on the sides
2×4 framing boards bought (braces, stakes and cleats not counted) 117 55
2×6 boards bought (not treated) 4 19
T1-11 sheets 18, all 4×8 16: six 4×10, two 4×9, eight 4×8
Roof OSB sheets 9 9
Shingle bundles 11 9
Felt rolls 1 2 (double layer below 4/12)
Studs by stock length 2×4 x 8 ft mostly (86 of 117) 2×4 x 8, 10 and 14 ft, 18 ft cap plates
Fascia 1×6 1×8
Extra hardware 2 gable vents, 6 under-eave vents 4 twist straps at the wall corners
Windows 2 1
Floor (skids, joists, decking) 4, 13, 6 sheets 4, 13, 6 sheets

The lean-to roof is simpler to frame: no ridge, no gable triangles, 13 rafters instead of 26. In exchange it needs 14 ft 2×6 stock, a front wall about 9 1/2 ft tall with 4×10 siding, and less headroom at the back.

At 3/12, read the minimum slope on the shingle wrapper before you buy. The 2×6 lean-to rafters are also close to their span limit at 30 psf ground snow, so in heavier snow they need to go deeper; check your local permit office for your snow load. See our 12×18 lean-to plan or the lean-to shed plans page for single-slope layouts.

Where the waste goes

Buying by stock length means every cut leaves an offcut. The plan’s cutting plan picks the stock length that wastes least for each part, so you know in advance where the scraps come from.

  • Studs: 90 in from a 96 in board leaves about 6 in each.
  • Rafters: 7′ 10 13/16″ from an 8 ft 2×4 leaves only about 1 1/16″, so each rafter takes a board of its own.
  • Floor joists: 11′ 9″ from a 12 ft board leaves 3 in for squaring the ends.
  • Front cripples: one 8 ft 2×4 covers all 5 front cripples at 6 1/4″.
  • Rafter ties: these 12′ 0″ pieces come from 14 ft boards, and the 1′ 11 7/8″ left over from each becomes lookout blocks, gable corner nailers and short gable studs.
  • Wall plates: the front and back plates use the full 16 ft, so pick straight boards with square factory ends.
  • Soffit plywood: it also supplies the three header filler strips.

The 16′ 8″ ridge and the two 16′ 8″ eave fascia runs are each spliced from 9′ 8″ and 7′ 0″ pieces, with the joint on a rafter or a rafter tail.

Common mistakes

  • Counting sheets by area. A roof can look like fewer than 9 sheets of OSB by area. The layout needs 9, because each slope is cut from full sheets that do not divide evenly into it and every end joint has to land on a rafter center.
  • Forgetting the door sheets. The piece cut out of the front wall is 76 1/2 in tall, shorter than a 77 1/4 in door leaf, so each leaf needs its own new T1-11 sheet.
  • Skipping rafter ties. A ridge board is not a beam. The 11 rafter ties at the plates stop the walls from spreading, and the 6 collar ties sit in the upper third.
  • Deep birdsmouths. A seat cut for full 3 1/2 in bearing notches too deep into a 2×4 rafter. Keep the seat at 2 1/2 in.
  • Precut studs for rafters. A 92 5/8 in precut stud is too short for a 7′ 10 13/16″ rafter, so ask the yard for full 96 in boards.
  • Treated lumber in the wrong spots. Skids, rims, joists, the pad frame and the ramp are pressure treated. Use ground-contact rated wood for the skids, pad frame and ramp, and hot-dip galvanized nails and treated-lumber rated screws in treated wood. The USDA Wood Handbook covers why wet, untreated wood decays.

The list includes 6 screw-in ground anchors with straps; ask which anchor type your area accepts for a skid shed. Tie-downs, setbacks and whether a 192 sq ft shed needs a permit vary by town, so check your local permit office before you order. For how to read any list like this one, see our shed material list guide, and for the base under the skids, shed foundation options.

Get the full plan

The 12×16 gable shed plan is a 69-page 3DSHEDPLANS PDF with 28 sections, 19 of them step-by-step build sections, the cut list, the cutting plan and the printable material list this page is taken from. It is drawn with the same 72 in double door for mowers and carts, two 36 x 36 in windows and wheel-in ramp, and it estimates about 76 hours for two people.

Want to see the format first? Download the free 12×16 gable shed plan preview PDF. Need more or less room? Compare the 12×12 gable plan, the 12×20 gable plan and all gable shed plans, or browse every size on the shed plans page.

Frequently asked questions

How much material do I need for a 12×16 shed?

The 3DSHEDPLANS 12×16 gable plan lists 139 2x4s: 117 framing boards and 22 for braces, stakes and cleats. Add 15 pressure-treated 2×6 boards for joists and rims, 4 pressure-treated 4×4 x 16 ft skids, 4 plain 2×6 boards and one 2×8 x 14 ft door header. The ramp and pad frame add treated boards.

How many sheets of T1-11 does a 12×16 shed need?

18 sheets of 4×8 T1-11 for the gable version: 14 for the four walls, 2 for the two gable triangles and 2 for the door leaves, because the piece cut out of the wall is too short to make a leaf.

How many bundles of shingles for a 12×16 shed roof?

11 bundles of 3-tab shingles for a 12×16 gable roof at 6/12 with 12 in eave and 4 in rake overhangs. That is about 261 shingles, and it includes the starter course and ridge cap.

Are there free 12×16 shed plans with a material list?

Yes. 3DSHEDPLANS offers a free preview PDF of the 12×16 gable plan, and this page lists the full shopping list and key cut lengths. The paid plan is a 69-page PDF with step-by-step drawings and its own printable material list.

Get 3 shed building tips by email

Short emails over 5 days: site prep, framing mistakes to avoid, and how the full plan saves lumber. Unsubscribe anytime.

Shed building guides

Plans for this guide

Step-by-step 3D plans with a complete materials list.

See all plans