Lean-to roof · 384 sq ft
16x24 Lean-To Storage Shed Plan
Build this 16x24 lean-to shed yourself. Every board, cut and step, drawn in 3D across 75 pages.
- 30-day money-back guarantee
- PDF by email right after checkout
- Visa, Mastercard, Amex, PayPal
- Full material and shopping list
- Cut list with every length
- Step-by-step 3D views, 75 pages
- Phone, tablet, PC and Mac

These 16x24 lean to shed plans from 3DSHEDPLANS build a 384 sq ft shed on 4x4 skids, 24 ft wide and 16 ft deep, with a 3/12 roof on 2x10 rafters. A 6 ft double door takes a riding mower up a ramp, and one window sits in the low back wall. The 75-page PDF has 19 build steps.
Get the full plan PDF for $19.99 or download the free preview
What builders say
The illustrations are fantastic, and the shopping list helped me buy the right materials. It took me five days to build my shed.
Pre-built sheds were hundreds of dollars. The plan laid everything out perfectly, and I saved hundreds in the process.
I worked as a joiner's assistant for three years and was skeptical. The plan was well laid out and beautifully illustrated.
The full plan is $19.99 as an instant PDF download. To see the drawing style first, open the free 16×24 lean-to shed plan PDF.
16×24 lean to shed plans: the numbers for a site check
| Check | 16×24 Lean-To Shed |
|---|---|
| Walls | 24′ 0″ wide x 16′ 0″ deep, 384 sq ft of floor |
| Roof footprint to the fascia faces | 24′ 9 1/2″ x 17′ 9 1/2″ (10″ eaves front and back, 4″ rakes) |
| Gravel pad | 26′ 0″ x 18′ 0″ inside a pressure-treated 4×6 frame, 4″ of 3/4″ crushed stone, about 7.7 cu yd loose, plus an 8′ 9″ wide landing in front of the door |
| Floor height | Top of the deck 9 3/4″ above the ground |
| Wall heights | 9′ 10 1/8″ front (high), 5′ 11″ back (low), plates included |
| Clear height inside | 9′ 7 1/8″ at the front wall, 5′ 8″ at the back wall |
| Top of the front wall | 10′ 7 7/8″ above the ground |
| High roof edge | 11′ 8 11/16″ above the ground |
| Door rough opening | 6′ 0″ wide x 6′ 4 1/2″ tall, double door, 9′ 0″ to 15′ 0″ from the left corner (centered) |
| Window rough opening | 1, 3′ 0″ x 3′ 0″, in the back wall, sill 2′ 1″ above the bottom plate |
| Ramp | Detachable, 6′ 9″ wide, 3′ 6″ out, 1:6 slope |
| Crew and time | Two people (three for each side wall lift), about 154 hours |
Square the corner stakes to matching 28′ 10 1/8″ diagonals before any digging. All 24 ft of roof drains to the low back edge, so leave room to reach that side and plan where the water runs. The plan itself notes that most towns ask for a permit at 384 sq ft, so check your local permit office before you order.
How the 16×24 lean-to shed goes together
| Stage | What the plan uses | Time for two |
|---|---|---|
| Site and foundation | Pressure-treated 4×6 pad frame, five spliced pressure-treated 4×4 skids on 4″ of compacted crushed stone | 13 h |
| Floor frame and deck | 19 pressure-treated 2×6 joists 16″ on center plus a doubled joist at the rim joint, 3/4″ tongue and groove plywood | 16 h |
| Walls | 2×4 studs 16″ on center, raised as bare frames in sections, then sided with 5/8″ T1-11 | 38 h |
| Roof framing | 19 2×10 rafters 16″ on center, 2 fly rafters on lookouts, vented blocking over both walls | 26 h |
| Sheathing and roofing | 7/16″ OSB, drip edge, double felt, 3-tab asphalt shingles | 32 h |
| Door, window, trim and paint | T1-11 double door, prefabricated window, 1×12 fascia, plywood soffit, 1×4 trim, paint | 29 h |
The plan has 28 numbered sections, and 19 of them are build steps. Steps 9 to 27 run from preparation and ground breaking to the ramp, and a printable checklist lists all 19 with a line for the date and who checked it. Section 8, “Key joints up close”, is a page of close-ups: the floor corner, the door and window openings, the wall corner, both rafter seats, the sloped side wall, the rake overhang, the eave corner, the ramp and the floor on the skids.
Building 24 ft long from 16 ft stock
The skids, rims and long-wall plates are all longer than a 16 ft board, so the plan splices or sections each one and tells you exactly where the joints go:
- Skids. Each 24 ft skid is an 8 ft and a 16 ft piece butted on the gravel: 8′ 0″ + 16′ 0″ from the left end on skids 1, 3 and 5, and 16′ 0″ + 8′ 0″ on skids 2 and 4. That keeps each joint 4 ft or more from the joint in the next skid. Each joint is centered under a floor joist and gets a 3 ft pressure-treated 2×4 scab on both sides, top flush, with six nails per scab. The five skids sit 3′ 11 1/8″ on center.
- Rims. Each rim is cut 11′ 11 1/4″ + 12′ 0 3/4″ and breaks over a doubled joist, so both rim ends get three nails into a full joist.
- Wall plates. The front wall is framed in 3 sections and the back wall in 2, so each section has its own plate pieces. The second top plate goes on once the walls stand and laps every section joint by at least 4 ft.
The nailed floor frame weighs about 800 lb, so the plan has you build it in place on the skids, square it to 28′ 10 1/8″ diagonals while it can still slide, and then fix it down with toe-nails and a framing angle at every joist-to-skid crossing, 100 in all.
The floor deck
The deck takes 12 sheets of 3/4″ tongue and groove plywood, lettered A to N on a piece map that starts at the front left corner. A sheet covers about 47 1/2″ once its tongue sits in the next groove, so four full rows cover 15′ 10″ of the 16 ft depth. The last 2″ along the back rim is a filler strip ripped from three 1×4 boards, and the back wall’s bottom plate covers it. Every edge but the back row’s keeps its tongue and groove, so no blocking goes under the seams. Two pairs of pieces share a sheet, and the map shows which, so you do not run short.
The gravel pad and the ground anchors
The pad is 26′ 0″ x 18′ 0″ inside its frame, 12 in past the shed on every side, with a landing in front of the door for the ramp. You dig 4 in deep over 26′ 11″ x 18′ 11″ so the frame and the stone finish level with the lawn. The frame is 11 pieces cut from nine pressure-treated 4×6 boards, laid flat, joined at each corner with two 10 in timber spikes and pinned with 38 rebar stakes. Its own diagonals must both be 31′ 7 1/2″. Then 4 in of 3/4″ crushed stone goes in, compacted in two layers.
This plan anchors the floor before the walls go up. Empty, the shed on loose skids slides at about 12 psf of wind (gusts near 60 mph) and tips at about 34 psf, and the bare walls catch that wind for days before the roof is on. So step 13 puts in 10 screw-in auger anchors, 30 in or longer, 5 along each outside skid at 1′ 0″, 6′ 3″, 12′ 0″, 17′ 6″ and 23′ 0″ from the left end. Each strap runs up the skid’s outside face onto the rim and takes 4 structural screws in the skid and 2 in the rim, ending 2 3/8″ or more below the deck so the siding stops above it. The front anchor at 12′ 0″ lands behind the ramp, and the plan shows how the ramp ledger screws on beside its strap. Check your local permit office for what your area asks.
How the walls go up
Each wall is framed flat on the deck and raised as a bare frame, and the siding goes on once all four stand. The two 24 ft walls go up in sections so that two people can raise each one. The side walls are one piece each, and their length is what calls for a third person.
| Order | Wall | Bare frame weight and crew |
|---|---|---|
| 1 | Front wall with the door, 3 sections | About 120 lb, 130 lb and 120 lb, 2 people each |
| 2 | Back wall with the window, 2 sections | About 160 lb and 90 lb, 2 people each |
| 3 | Left wall, sloped top | About 170 lb, 3 people |
| 4 | Right wall, sloped top | About 170 lb, 3 people |
- Front sections. The plates break at 8′ 0 3/4″ and 15′ 11 1/4″ from the left corner, so the middle section holds the door. Each section is squared on its own diagonals (12′ 7 9/16″ for the two end sections, 12′ 6 1/8″ for the middle) before it moves.
- Stop posts. Three 4 ft posts screwed to the outside of the rim stop the 9′ 10 1/8″ wall at plumb. A post sits under an end stud or centered on a joint, and the plan moves them along as each section goes up.
- Low braces. The tall wall’s plate is out of reach once it stands, so its four braces are cut to about 9′ 5″ and screwed to the studs about 7 ft up, where you reach them from the deck, then nailed to stakes about 5 ft out.
- Back sections. The back wall breaks at 14′ 7 1/4″ from the right corner, and its braces are cut to about 9 ft, within reach from the deck.
- Joining sections. The joint studs are clamped flush and nailed every 12 in. The second top plate runs 4′ 0″ + 16′ 0″ + 4′ 0″ on the front and 8′ 0″ + 16′ 0″ on the back, so each layer covers the other’s joints.
- Side walls drop in. At 15′ 4 3/4″ long, the plan raises each side wall with three: one at each end of the top plate and one in the middle, then two hold it while the third nails the braces. Their plates are 1/4″ shorter than the gap between the front and back walls, so they tip up between them. Plumb those two first.
- Twist straps. A lean-to side wall has no level plate to lap, so a metal twist strap ties each of the four inside corners.
- Wind. The plan says to pick a calm day: a bare frame catches wind like a sail.
The front wall has 20 studs at 9′ 5 5/8″ and the back wall 21 at 5′ 6 1/2″. Each side wall has 13 studs from 5′ 8 3/8″ to 9′ 6 3/16″, their tops beveled at 14.0 degrees under a 15′ 10 7/16″ sloped plate. A sloped wall has unequal diagonals, so the plan squares a rectangle instead: marks 5′ 0″ up both end studs, with both diagonals at 16′ 2 1/4″. Studs over 7′ 8 5/8″ must come from 10 ft or full 96 in boards, not the 92 5/8 in precuts many stores sell as “8 ft studs”.
What fits in a 16×24 lean-to shed
The plan’s “What fits inside” drawing shows the room seen from above and to scale. Inside, the shed is 23′ 5″ wide and 15′ 5″ deep.
- Riding mower. A 42 in deck is 4′ 7 3/16″ x 5′ 10″, parked nose in. The door clear width is about 5′ 11 1/2″ with both leaves open, so a 42 in deck clears each side by 8 1/8″. A 48 in deck fits with its deflector raised. A 54 in deck does not.
- Wheelbarrow. 2′ 2″ x 5′ 0″.
- Two bikes. Handlebars staggered, 2′ 6″ x 5′ 10″.
- Shelves. 24 in deep on the back wall, kept below the window sill at 2′ 2 1/2″ above the deck, and 16 in deep along the back 6 ft of each side wall. They are drawn in the fit plan, not on the shopping list.
- Aisle. A 7′ 6″ aisle runs behind the mower to the back shelves.
- Lining up. Keep 10′ 0″ clear and level in front, measured from the wall (the ramp and one mower length), to line a tractor up square.
- Door swing. The leaves swing out, so keep room in front of them.
Door, window and ramp: sizes and positions
- Door. The opening is 6′ 0″ wide, centered in the front wall from 9′ 0″ to 15′ 0″, under a doubled 2×8 header with a 1/2″ plywood filler. Each leaf is T1-11, 2′ 11 5/8″ wide and 6′ 5 1/4″ tall, cut from a new sheet because the cut-out is too short. Each gets a 1×4 frame and two Z braces cut at 36 degrees on the miter saw. Three T-strap hinges per leaf are bolted through with the nuts inside, so nobody can unscrew the door from outside.
- Door details. The left leaf is the active one and carries the latch, 3′ 3 1/8″ above the deck. The right leaf is held by two barrel bolts on a 1×2 astragal. An aluminum threshold cap covers the deck edge with no threshold board, brush sweeps close the gap under the leaves, and a 10 in hook holds each leaf open in wind.
- Window. A prefabricated window in a 3′ 0″ x 3′ 0″ rough opening in the back wall, 10′ 6″ to 13′ 6″ from the building’s right corner (on your left as you stand behind the shed), under a doubled 2×6 header, with its sill 2′ 1″ above the bottom plate. Flashing tape goes around the opening first: sill, then sides, then head.
- Ramp. A detachable pressure-treated ramp, 6′ 9″ wide and 3′ 6″ out at 1:6, with 8 tapered stringers 11 3/8″ on center under 8 2×6 boards. Its top sits about 13/16″ below the deck, and the door leaf swings out over it with 1 1/4″ to spare. Two hook-and-eyes hold it to the ledger, so you can unhook it and lift it away to level the shed. Set a mower deck to its highest cut before you roll it up.
What is on the 16×24 shed materials list
The shopping list is split by section, in the stock lengths that waste the least, and a lumber yard order adds it all up:
- Foundation and floor: five 16 ft and five 8 ft pressure-treated 4×4 skid pieces, splice scabs, 2×6 rims and 20 2×6 x 16 ft joist boards, the 1×4 filler strips and 12 sheets of 3/4″ tongue and groove plywood.
- Pad: five 10 ft and four 16 ft pressure-treated 4x6s for the frame, 38 rebar stakes, 16 timber spikes and 7.7 cu yd of crushed stone.
- Walls: studs and plates (the yard order lists 25 8 ft, 39 10 ft, 33 12 ft, 2 14 ft and 8 16 ft 2x4s), a doubled 2×8 door header and a doubled 2×6 window header, plus 20 sheets of 5/8″ T1-11 in 4×8, 4×9 and 4×10 sizes. The front wall needs the full 10 ft sheet with no joint, so order the 4×9 and 4×10 sheets early.
- Roof: 21 2×10 x 20 ft boards for 19 rafters and 2 fly rafters, four 2×10 x 10 ft boards for blocking, 16 sheets of 7/16″ OSB, 3 rolls of 15 lb felt, 16 bundles of shingles and 10 pieces of drip edge.
- Door, window, ramp and trim: 2 new T1-11 sheets for the door leaves, 6 T-strap hinges, 18 carriage bolts, a handle and latch, 2 barrel bolts, the threshold cap, the prefabricated window, the ramp lumber, 1×12 fascia, 1×4 casing and corner trim.
- Hardware: 37 lb of 16d framing nails, 34 hurricane ties, 4 framing angles for the end rafters, 100 framing angles for the floor, 4 twist straps, 10 ground anchors with straps, 15 tubes of adhesive, flashing tape, drip cap, insect screen and 7 gallons of paint.
- Temporary parts: 21 2×4 x 12 ft braces, stakes and deck cleats, all reused later.
The rafters and rake fascia come from 20 ft boards and the sheets run to 10 ft, so the plan suggests asking the yard to deliver. Add 2 or 3 spare studs for bad boards.
How the 16×24 lean-to roof is framed
A single-slope roof has no ridge and pushes nothing outward, so no rafter ties cross the shed. Hurricane ties hold the rafters down in wind, with a framing angle at each of the 4 corners where the side wall covers the plate.
- Why 2×10. The plan sizes the rafters as 2×10 for a 15′ 5″ clear span at 16″ on center, in #2 spruce-pine-fir or Douglas fir-larch at about 30 psf of ground snow. Check the size with your local permit office before you buy.
- Two birdsmouths. Each rafter hooks over both walls with a 3 1/2″ level seat and a 7/8″ plumb heel, about 9 percent of the rafter’s depth. Never cut deeper than one third of the rafter.
- Pattern first. Cut one pattern rafter from a straight 20 ft 2×10 (board 18′ 4 13/16″, top edge 18′ 2 1/2″), test it on both walls at each end of the 24 ft run, keep it as the first rafter, then cut 18 more and 2 fly rafters.
- Check the walls first. The distance between the two heels, measured level across the shed, must be 15′ 8 1/2″ at both ends and in the middle.
- Getting them up. Each board is about 60 lb and longer than the room, so two people feed it in through the door, low end first, and rest the high end on a ledge across the door trimmers. The plan builds that ledge from three 6′ 6″ 2x4s screwed flat on top of each other, 4 1/2 in deep, because a single 2×4 sticks out too little for a 2×10 end to rest on.
- Tie the rake. The end rafters are nailed up through the sloped side-wall plates every 16″, 12 nails per side.
- Rake overhang. Twenty short 2×4 lookout blocks hold a fly rafter 2 1/2″ outside each end rafter for the 4″ rakes.
Sheathing, felt and shingles
The roof deck is 24′ 8″ long and 18′ 2 1/2″ up the slope, covered with 16 sheets of 7/16″ OSB cut so every end joint lands on a rafter. The sheathing map letters each piece from the low back eave up, and the top row along the high edge is 2′ 2″ wide.
- Load from the back. The plan has you load sheets and bundles at the low back eave, never the high front edge, and screw a 2×4 foot stop to the rafters before you work above it.
- Low pitch, double felt. At 3/12 the shingle makers ask for two layers: a 19″ starter strip, then 36″ courses lapping 19″ (Asphalt Roofing Manufacturers Association).
- Drip edge. It goes under the felt at the low eave and over the felt on the rakes and the high front edge, since water runs away from that edge.
- Shingles. 3-tab at 5″ exposure, 44 courses, about 408 shingles in all, which is 16 bundles with the starter. The last course is trimmed flush at the high edge and its tabs sealed with roofing cement.
How the roof is vented
The plan vents every rafter bay. The 2×10 blocking over each wall is ripped to 8 5/8″ tall and drilled with three 1″ vent holes per block before it goes in. The plywood soffit strips under both eaves sit 1/4″ off the siding, with insect screen stapled across that gap. Air comes in at the low back soffit, rises through the holes and up the rafter bays under the sheathing, and leaves through the holes and the soffit gap at the high front wall.
Free 16×24 lean-to plan PDF vs the full plan
The free PDF is a streamlined version: it walks through the five stages (site and foundation, floor, walls, roof, trim and paint) with 3D views from the full plan. The full plan adds what you build from:
- the material list with quantities, the cut list for every part and a cutting plan that says which board each part comes from
- measurements in every step and drawing, with all four walls drawn stud by stud and their position tables
- the rafter pattern with both birdsmouth marks and the rafter layout on the plates
- the decking, siding and sheathing piece maps and the plywood rip map
- the door leaf with its frame and brace cuts, the ramp, and pro tips on most steps
Before you build a 16×24 lean-to shed
- Permits. At 384 sq ft and 11′ 8 11/16″ at the high edge, this is a big shed for many towns, and the plan says most towns ask for a permit at this size. Size, height and setback rules vary by town and HOA. Check your local permit office before you buy lumber, and call 811 a few working days before you dig so buried lines are marked.
- Snow and wind. Snow sits longer on a 3/12 roof. Heavy snow areas or high-wind zones may need closer rafter spacing or larger rafters. Your local permit office knows the loads for your address.
- Skids. Use ground-contact rated pressure-treated 4x4s (UC4A or higher), set crown up, and raise a low skid with gravel or treated shims only.
- Keep it dry. Leave 6″ or more between the siding and the soil or mulch, and keep the drip edges clear.
- Materials. Store lumber flat and covered, since wet wood decays faster (USDA Forest Products Laboratory Wood Handbook). Check the stamp on each OSB sheet for its span rating (APA: OSB).
- Every spring. The plan’s maintenance list: check for lifted shingles, re-caulk trim joints, touch up paint, and make sure the skids are still level and dry.
Tools and ladders the plan lists
Beyond a circular saw, drill/driver and framing hammer, the list adds a miter saw for the door braces and trim, a reciprocating saw for flush cuts, a 3 lb sledge for the pad frame, two 24″ bar clamps for marking the rims, a hand tamper for the pad and a steel bar to turn the ground anchors. Two 8 ft step ladders cover the walls and rafters, since the front plates sit 9′ 10 1/8″ above the deck; the front eave is about 11′ 5″ above the gravel, so a rolling scaffold tower is the better choice for the front fascia and the high ends of the fly rafters. A 20 ft extension ladder, about 17 ft long once extended, reaches about 4′ 6″ past the roof edge and handles roof work from the low back eave once the roof is on.
How this plan was checked
Before this plan went on sale, every measurement in it was cross-checked: 103 checks in all. That covers 62 on the walls and openings, 7 on the floor and foundation, 12 on the roof framing, 2 on sheet goods and roofing, 4 that the drawings agree with the lists, 3 on board lengths and offcuts and 13 on trim, soffit and sections. All pass. Questions about the plan go to [email protected] with your plan size and the page number.
Related plans
- Same depth, 4 ft shorter: the 16×20 lean-to shed plan, or the square 16×16 lean-to shed plan.
- Same 24 ft front, shallower: the 14×24 lean-to shed plan and the 12×24 lean-to shed plan.
- Same 16×24 footprint with a different roof: the 16×24 gable shed plan or the 16×24 hip roof shed plan.
- Choosing a base first? Read the shed foundation guide.
- Every size on the lean-to shed plans page.
Shed building guides
- 8×12 Chicken Coop Material List: Lumber, Sheets, Hardware
- 8×10 Chicken Coop Material List: Lumber, Sheets, Hardware
- 6×8 Chicken Coop Material List: Lumber, Sheets, Hardware
- 10×12 Chicken Coop Material List: Lumber, Sheets, Hardware
- 8×8 Goat Shelter Material List: Lumber, Siding, Metal
- 8×12 Goat Shelter Material List: Lumber, Siding, Metal
Frequently asked questions
How big is the 16×24 lean-to shed?
The walls are 24 ft wide and 16 ft deep, 384 sq ft of floor. With 10 in eaves and 4 in rakes the roof covers 24 ft 9 1/2 in by 17 ft 9 1/2 in, and the high roof edge stands 11 ft 8 11/16 in above the ground.
Does a riding mower fit in the 16×24 lean-to shed?
The plan's fit drawing says yes for a 42 in deck parked nose in. With both leaves open the door is about 5 ft 11 1/2 in clear, so that deck clears each side by 8 1/8 in. A 48 in deck fits with its deflector raised. A 54 in deck does not.
How long does it take to build a 16×24 lean-to shed?
The plan estimates about 154 hours for two people: 13 for the site and foundation, 16 for the floor, 38 for the walls, 26 for the roof framing, 32 for sheathing, felt and shingles and 29 for the door, window, trim and paint.
How many people does it take to raise the walls?
The tall front wall goes up in 3 sections of about 120, 130 and 120 lb, and the back wall in 2 sections of about 160 and 90 lb, each with two people. Each side wall is about 170 lb and 15 ft 4 3/4 in long, so the plan raises it with three.
What size rafters does the 16×24 lean-to roof use?
19 2×10 rafters at 16 in on center plus 2 fly rafters, each cut from a 20 ft board. The plan sizes them for a 15 ft 5 in clear span in #2 spruce-pine-fir or Douglas fir-larch at about 30 psf of ground snow. Check the size with your local permit office.
Where are the door and window on the 16×24 lean-to?
The 6 ft double door is centered in the tall front wall, 9 ft 0 in to 15 ft 0 in from the left corner. One 3 ft by 3 ft window sits in the low back wall, 10 ft 6 in to 13 ft 6 in from the building's right corner.
More about the 16×24 lean-to shed plan
Build Your Own 16×24 Lean-To Storage Shed With Ease!
Looking for a small yet exquisite 16×24 Lean-To Storage Shed for your lawn?Our 16×24 Shed will not only add glamor to your lawn but will also make it more functional. Being a Lean-To Shed, the roof slopes one way, so rain runs off to the back. You get an easy to maintain, sturdy and spacious lean-to shed! So wait no more – order now and start building today…
Shed Plan Includes:
A Full-Fledge Material List with Required Quantity
The materials you use to build a shed are the secrets to your success. Unfortunately, most plans out there won’t precisely tell you what to buy and in what quantity. In fact, they would lure you to buy products from the plan-sellers. Luckily, we have a completely different motto. We want you to succeed in building your dream shed. And for that, we understand how important it is to get the right materials.
Our 16×24 Lean-To Storage Shed Plan comes with an all-inclusive list of materials, hardware and tools that you would need to build the shed. Nothing more, nothing less! No click baits! You get a printable list of materials that you can take to the hardware store.
Shed Plan Includes:
Simple, Easy to Understand Step by Step Instructions
Who would have ever thought to get their hands on a shed plan that would take them through the entire process with such ease! Our 16×24 Lean-To Storage Shed Plan comes with easy to understand, step by step instructions for DIY newbies. Don’t worry if you don’t have any experience in building wooden structures. The plan takes you through it in plain words, without jargon. Right from building the foundation to the walls and even the roofing, we have everything covered for you.
Shed Plan Includes:
3D Rendered Images for Reality Check
2D images are a thing of the past! Our 16×24 Lean-To Storage Shed Plan comes with 3D rendered images, which means you get to see every corner, every angle and every inch clearly as if it is being right in front of you by a professional. You won’t have to scratch your head thinking how the shed should from the front, back or the sides. Even the rooftops are visualized in 3D for better understanding.
Building Your Own Shed vs. Getting Professional Help
1st Reason
You Save What a Builder Would Charge
Probably the most important reason for building your own shed is that you save money. A builder charges for labor on top of the materials, for work you can do yourself. With our 16×24 Lean-To Storage Shed Plan, you get clear instructions, material lists and diagrams to go through the process easily.
2nd Reason
Choose Your Own Design and Make Your Dream Come True
Don’t fall for the marketing gimmicks of most professionals out there. When you start building your own shed, the world is out there for you to explore. With our material list and instructions, you will realize that you can build your dream shed without any design restrictions. The plan is simple yet it gives you the liberty to add in your own flavor!
3rd Reason
You Will Reclaim Your House Again
Our 16×24 Lean-To Storage Shed has 168 sq ft of floor for your storage. Whether you garden or play sports, you can use the shed to keep all sorts of your equipment and tools. Besides, the shed will add an exquisiteness to your garden while fulfilling its purpose.
All the Other Reasons
This Is Exactly What You’ll Get with Your 16×24 Lean-To Storage Shed Plan!
19 step-by-step sections that guide you through the whole process.
Designed for beginners as well as for the professionals.
Explanatory 3D images so you can see exactly what to do next.
Comprehensive materials list that gives you exactly what you need.
Your plan will look great on any mobile device.
PRO-TIPS throughout the build.
High quality PDF plan with everything you need emailed to you instantly.
How to Build a 16×24 Lean-To Shed: The Steps at a Glance
This is a short overview of how the 16×24 lean-to shed goes together. The full plan PDF has 19 build steps on 75 pages, with the cut length and count of every part, a shopping list with quantities and drawings for the steps.
Step # 1: Check the Rules Where You Live
Rules for sheds, such as size limits, setbacks and permits, vary by town and HOA. Check your local permit office before you build.
Step # 2: Know the Size of Your 16×24 Shed
The shed is 24 ft wide and 16 ft deep (384 sq ft of floor). The front wall is 118 1/8″ tall and the back wall 71″, so the roof slopes 3/12 to the back. The roof peaks about 11′ 8 11/16″ above the ground. It has a double door in the front wall and 1 window (36″ by 36″ rough opening). The plan estimates about 154 hours of work for two people.
Step # 3: Get the Tools and Materials
You need basic carpentry tools: a circular saw, a speed square, a drill/driver, a framing hammer or nailer, a 4 ft level and a tape measure. The main materials are pressure-treated 4×4 skids and 2×6 floor joists, 3/4 in tongue and groove plywood, 2×4 studs, 5/8 in T1-11 siding, 2×10 rafters, 7/16 in OSB, roofing felt, drip edge and asphalt shingles. The plan’s shopping list gives the quantity of each.
Step # 4: Build the Foundation and Floor
Lay a compacted gravel pad and set the pressure-treated 4×4 skids level in both directions. Build the floor frame from pressure-treated 2×6 joists 16 in on center, square it by measuring the diagonals, fix it to the skids, then glue and screw the 3/4 in tongue and groove plywood on top.
Important Tips:
- Build the foundation where the shed will stand. Moving a finished shed is hard work.
- Clear plants and loose soil so the pad sits on flat, firm ground.
- Crown every skid up. The floor weight will flatten it.
Step # 5: Frame and Raise the Walls
- Frame each wall flat on the floor with 2×4 studs 16 in on center, with headers over the door and window openings.
- The door rough opening is 6′ 0″ wide by 6′ 4 1/2″ tall.
- Raise each wall with helpers (the plan says how many for each wall), check it plumb with a level, brace it and nail the corners together.
- Cover the walls with 5/8 in T1-11 siding. The plan gives the size of every sheet.
Step # 6: Frame the Roof
- Set the 2×10 rafters 16 in on center from the high front wall to the low back wall.
- The roof slopes 3/12 and overhangs 10″ past the walls.
Step # 7: Sheathe and Shingle the Roof
- Nail 7/16 in OSB over the rafters.
- Add roofing felt and drip edge, then the asphalt shingles. Follow the shingle maker’s instructions.
Step # 8: Door, Window and Trim
- Build the door from the plan and hang it.
- Set the window in its framed opening by the maker’s instructions.
- Add the fascia, soffit and corner trim.
Step # 9: Finishing Touches
- Paint or stain all exposed wood to protect it from the weather.
- Add shelves and hooks to suit what you store.
Want every measurement? The full 16×24 Lean-To Storage Shed Plan PDF has the shopping list, the cut list and 19 build steps with drawings.
Ready to build the 16×24 lean-to shed?
$19.99 for the full PDF: every step, cut and board. 30-day money-back guarantee.