On a 16×24 gable shed on skids, the 16×24 shed material list comes to 126 framing 2x4s, 50 2x6s, 28 treated 2x6s, 10 treated 4x4s, 12 sheets of 3/4 in plywood, 17 of OSB, 25 of T1-11 and 19 shingle bundles, with 94 1/2 in walls and a 6/12 roof.
Every count below comes from the shopping list, cut list and cutting plan in the 71-page 16×24 gable shed plan PDF, so this page and the plan match line for line. It covers one 72 in double door in the front wall, two 36 x 36 in windows, one in each side wall, and a detachable ramp. It is a shopping aid, not a stamped engineering drawing.
The plan checks the layout board by board. For example, every plate joint lands on a stud, and the second top plate laps each wall-section joint by at least 4 ft on both sides.
What this 16×24 shed material list assumes
This list is for a shed 24 ft wide and 16 ft deep, with 384 sq ft of floor and the ridge running the 24 ft way:
- Walls: 7′ 10 1/2″ (94 1/2 in) tall including the bottom plate and double top plate, so wall studs are cut to 90 in (7′ 6″). The top of the walls sits 8′ 8 1/4″ above the ground and the peak 13′ 1 1/16″.
- Spacing: studs, floor joists and rafters all at 16 in on center.
- Roof: 6/12 pitch, 2×6 rafters, a 2×8 ridge board, 12 in eave overhang and 4 in rake overhang. The roof footprint to the fascia faces is 24′ 9 1/2″ x 18′ 1 1/2″.
- Floor: five pressure-treated 4×4 skids 24 ft long, 3′ 11 1/8″ on center, on a crushed stone pad 26 x 18 ft and 4 in deep (12 in wider than the shed on every side), held in a frame of pressure-treated 4x6s pinned with 38 rebar stakes. The top of the deck sits 9 3/4 in above the ground. The 4×4 skids assume a level, tamped pad; heavier 4×6 or 6×6 skids change the count and the floor height. The 2×6 joists are cut to 15′ 9″ at 16 in on center under 3/4 in tongue and groove plywood.
- Loads: each rafter runs 96 in. At this depth the plan steps up from the 2×4 rafters used on 10 and 12 ft deep sheds to 2×6 rafters. The PDF itself says heavy snow or high-wind areas may need closer rafter spacing, larger rafters or ground anchors, so check your local permit office before you buy rafter stock.
- Openings: a 72 in wide double door (76 1/2 in rough opening height, 6′ 6″ clear once the bottom plate is cut out) in the 24 ft front wall, from 9′ 0″ to 15′ 0″ measured from the left corner, and two windows, each a 36 x 36 in rough opening with a 42 in sill, one in each 16 ft side wall at the front end. The 24 ft back wall has no openings.
- Ramp and anchors: a detachable pressure-treated ramp, 6′ 9″ wide and 3′ 6″ out from the door, at a 1:6 slope, and 10 screw-in ground anchors with straps, 5 along each outside skid.
- Time: the plan estimates about 154 hours for two people: 13 for the site and foundation, 16 for the floor, 38 for the walls, 26 for the roof framing, 32 for sheathing and shingles and 29 for the door, windows, trim and paint.
Why 2×6 joists and not 2×8? Some free 16×24 plans frame the floor with 2×8 joists. Here each 2×6 joist rests on all five skids, so it only spans about 4 ft between supports, not 16 ft. If you set the floor on two or three beams or a row of piers instead, the joist span grows and the joist size must be rechecked. Our shed foundation options guide compares skids, blocks and piers.
Shopping list by stage
Lumber sizes are nominal. A 2×4 measures about 1 1/2 x 3 1/2 in and a 2×6 about 1 1/2 x 5 1/2 in, as the American Wood Council explains. Check the grade stamp on plywood and OSB; the APA trademark guide shows how to read it.
Totals at a glance
| Material | Total |
|---|---|
| 2×4 framing boards, all lengths | 126 |
| 2×4 x 12 ft for temporary braces and a ridge post | 23 |
| 2×4 x 8 ft for brace stakes and deck cleats | 7 (so 156 plain 2x4s in all) |
| Pressure-treated 2×4 x 16 ft (skid splice scabs) | 2 |
| Pressure-treated 2×4 x 8 ft (ramp ledger and filler) | 2 |
| Pressure-treated 2×6 (20 joists, 4 for the two rims, 4 for the ramp deck) | 28 |
| Pressure-treated 4×4 (two per 24 ft skid) | 10 |
| Pressure-treated 4×6 (gravel pad frame, 4 at 16 ft and 5 at 10 ft) | 9 |
| Pressure-treated 2×10 x 8 ft (ramp stringers) | 2 |
| 2×6 (rafters, frieze blocks, window headers) | 50 |
| 2×8 (ridge and door header) | 3 |
| 1×4 x 8 ft (decking filler strips, part of the 16 on the trim list) | 3 |
| 3/4 in T&G plywood sheets (floor) | 12 |
| 7/16 in OSB sheets (roof) | 17 |
| 5/8 in T1-11 sheets (walls, gables, door leaves) | 25 |
| 1/2 in plywood sheets (soffit, header fillers) | 3 |
| 3-tab shingle bundles | 19 |
Floor
| Item | Qty | Used for |
|---|---|---|
| Pressure-treated 4×4 x 16 ft, tagged for ground contact | 5 | Long piece of each 24′ 0″ skid |
| Pressure-treated 4×4 x 8 ft, tagged for ground contact | 5 | Short piece of each 24′ 0″ skid |
| Pressure-treated 2×4 x 16 ft | 2 | Ten 3′ 0″ scabs, one on each side of every skid joint |
| Pressure-treated 2×6 x 16 ft | 20 | Floor joists cut to 15′ 9″ (19 on layout plus a second joist at the rim joint) |
| Pressure-treated 2×6 x 12 ft and 14 ft | 2 each | Two 24′ 0″ rim joists, cut 11′ 11 1/4″ + 12′ 0 3/4″ |
| 3/4 in T&G plywood, 4×8 sheet | 12 | Floor decking |
| 1×4 x 8 ft | 3 | Three 8′ 0″ filler strips ripped to 2 in, along the back rim (counted in the 16 on the trim list) |
| Crushed stone 3/4 in, loose | 7.7 cu yd | Gravel pad, measured loose before tamping |
| Pressure-treated 4×6 x 16 ft, ground contact | 4 | Pad frame |
| Pressure-treated 4×6 x 10 ft, ground contact | 5 | Pad frame |
| Rebar stakes 1/2 in x 24 in | 38 | Pad frame |
| Galvanized timber spikes 3/8 x 10 in | 16 | Pad frame corners |
| Ground anchors, screw-in auger type, 30 in or longer, with straps | 10 | Anchoring the skids, 5 along each outside skid |
| Structural wood screws 1 1/2 in, exterior | 60 | Anchor straps, 4 into the skid and 2 into the rim per anchor |
| Deck screws 2 in (or 6d ring-shank nails), rated for treated lumber | 10 lb | Decking |
| Construction adhesive, 10 oz tube | 15 (whole build) | A bead on every joist under the decking, and other joints |
Walls and roof framing
| Item | Qty | Used for |
|---|---|---|
| 2×4 x 8 ft | 86 | 65 wall studs, cripples, sills, the short pieces of the front and back cap plates, 9 collar ties, gable studs, lookout blocks, ridge splice cleat |
| 2×4 x 10 ft | 4 | Short pieces of the front wall plates (8′ 0 3/4″), gable studs, gable vent side studs |
| 2×4 x 12 ft | 3 | Short pieces of the back wall plates, gable vent sills and headers |
| 2×4 x 14 ft | 6 | Long pieces of the back wall plates, the door and window trimmers, one gable stud length |
| 2×4 x 16 ft | 27 | 17 rafter ties, side wall plates and cap plates, long pieces of the front plates and both front and back cap plates |
| 2×6 x 12 ft | 42 | 38 rafters and 4 fly rafters, one per board |
| 2×6 x 8 ft | 8 | Frieze blocks and window headers |
| 2×8 x 12 ft | 1 | Ridge piece, 11′ 0″ |
| 2×8 x 14 ft | 2 | Ridge piece, 13′ 8″, and the door header (two at 6′ 3″) |
| Hurricane ties, H2.5A type or equal | 34 | Rafter to plate |
| Framing angles, A34 type or equal | 4 | End rafters at the 4 corners |
| Connector nails 1 1/2 in | 3 lb | Hurricane ties and straps |
| 2×4 x 12 ft, temporary | 23 | 18 wall braces, 4 braces for the center gable studs and 1 post under the ridge joint, reused later |
| 2×4 x 8 ft, temporary | 7 | 12 pointed 24 in brace stakes from 4 boards, 16 deck cleats 12 in from 3 boards |
The three header filler strips of 1/2 in plywood are ripped from a soffit sheet, so buy the soffit plywood with the wall lumber. The 126 framing boards, the 23 boards for braces and the ridge post and the 7 boards for stakes and cleats put 156 plain 2x4s on the truck, plus 4 treated 2x4s for the skid scabs and the ramp ledger.
Roof covering
| Item | Qty | Used for |
|---|---|---|
| 7/16 in OSB, 4×8 sheet | 17 | Roof sheathing, cut so every end joint lands on a rafter |
| 15 lb felt, 400 sq ft roll | 2 | Underlayment |
| 3-tab shingles, 26 per bundle | 19 bundles | Roof, starter course and ridge cap |
| Drip edge, 10 ft | 10 | Eaves and rakes |
| Roofing nails 1 1/4 in galvanized | 16 lb | Shingles |
| Roofing cap nails 1 in | 3 lb | Felt |
| Roofing cement, 10 oz tube | 2 | Roofing |
| Louvered gable vent, 14 x 24 in | 2 | One in each gable |
| Under-eave vent 16 x 8 in, screened | 8 | Air in under the eaves |
| Insect screen, 2 ft x 25 ft | 1 roll | Vent holes and gaps at the eaves |
Siding and trim
| Item | Qty | Used for |
|---|---|---|
| 5/8 in T1-11, 4×8 sheet | 20 | Walls (640 sq ft, before the door and window cut-outs) |
| 5/8 in T1-11, 4×8 sheet | 3 | Both gable triangles |
| 5/8 in T1-11, 4×8 sheet | 2 | Door leaves (one per leaf) |
| 1/2 in plywood, 4×8 sheet | 3 | Eave soffit and header fillers |
| Z-flashing, 10 ft | 4 | Wall siding to gable siding joint |
| Drip cap, 10 ft | 2 | Over the door and window head casings |
| 1×8 x 12 ft | 6 | 4 rake fascia boards (10′ 5 3/16″ tip to tip) and the 11′ 0″ pieces of the eave fascia |
| 1×8 x 14 ft | 2 | The 13′ 8″ pieces of the eave fascia (two 24′ 8″ runs) |
| 1×4 x 16 ft | 2 | Corner trim on the eave walls (four at 7′ 11 1/8″) |
| 1×4 x 14 ft | 3 | Door casing sides, door stiles |
| 1×4 x 8 ft | 16 | Gable-wall corner trim (four at 7′ 8 15/16″), door head casing, door Z braces, door rails, both window casings and the 3 decking filler strips |
| 1×2 x 8 ft | 2 | Door stop and astragal |
| Exterior paint and primer in one | 7 gal | Two coats of about 940 sq ft each (rough-sawn T1-11 soaks up more, so check the coverage on the can) |
| Exterior caulk | 3 tubes | Trim |
Ramp
| Item | Qty | Used for |
|---|---|---|
| Pressure-treated 2×10 x 8 ft | 2 | Stringers (two tapered stringers from each board) |
| Pressure-treated 2×6 x 14 ft | 4 | 8 deck boards, 6′ 9″ each |
| Pressure-treated 2×4 x 8 ft | 2 | Ledger on the rim joist and skid, and the filler behind it |
| Exterior deck screws 3 in | 145 | Boards into the stringers |
| Structural screws 5 in, 1/4 in | 12 | Ledger into the rim joist and skid |
| Hook-and-eye latches, 4 in | 2 | Holding the ramp to its ledger |
| Anti-slip grit tape, 2 in x 15 ft | 4 rolls | One strip along each board |
Hardware and windows
| Item | Qty |
|---|---|
| Framing nails 3 1/2 in (16d), hot-dip galvanized (about 1,935 nails plus 10 percent) | 54 lb |
| Siding nails 2 1/2 in (8d), hot-dip galvanized | 24 lb |
| Sheathing nails 2 1/2 in (8d) for OSB | 16 lb |
| Connector nails 1 1/2 in for the ties | 4 lb |
| T-strap door hinges | 6 |
| Door handle and latch set | 1 |
| Barrel bolts for the fixed leaf | 2 |
| Carriage bolts 1/4 x 2 in with washers and nuts (hinge straps) | 18 |
| Brush door sweeps, 36 in | 2 |
| Hold-open hook and eye, 10 in | 2 |
| Aluminum threshold cap, 6 ft | 1 |
| Exterior screws 1 1/4 in (door frame to T1-11) | 1 lb |
| Exterior screws 3 in (hinge straps into framing) | 1 box |
| Prefabricated window, 36 x 36 in rough opening | 2 |
| Flashing tape 4 in (window openings) | 1 roll |
| Wood shims (door and windows) | 1 bundle |
Cut list highlights
Most of the 16×24 cut list is square cuts: 65 wall studs at 7′ 6″ (19 front, 22 back, 12 in each side wall) and 20 floor joists at 15′ 9″. The parts below have angles, overhangs, splices or stacked sizes.
| Part | Lumber | Cut length | Qty |
|---|---|---|---|
| Rafter (board length, see below) | 2×6 | 10′ 2 11/16″ | 38 |
| Fly rafter (rake) | 2×6 | 10′ 2 11/16″ | 4 |
| Ridge board (spliced) | 2×8 | 24′ 8″ | 1 |
| Rafter tie (interior pairs, at the plates) | 2×4 | 16′ 0″ | 17 |
| Collar tie | 2×4 | 7′ 0 7/8″ | 9 |
| Lookout block (rake overhang) | 2×4 | 2 1/2″ | 24 |
| Ridge splice cleat (flat under the ridge joint) | 2×4 | 2′ 0″ | 1 |
| Frieze block (over the eave walls, top beveled) | 2×6 | 1′ 1″ (32), 1′ 0 1/4″ and 1′ 1 3/4″ (2 each) | 36 |
| Skid (spliced) | PT 4×4 | 24′ 0″ | 5 |
| Skid splice scab | PT 2×4 | 3′ 0″ | 10 |
| Rim joist (spliced) | PT 2×6 | 24′ 0″ | 2 |
| Decking filler strip (1×4 ripped to 2″) | 1×4 | 8′ 0″ | 3 |
| Front and back wall plate (spliced) | 2×4 | 24′ 0″ | 4 |
| Front and back cap plate (spliced) | 2×4 | 23′ 5″ | 2 |
| Side wall plate | 2×4 | 15′ 4 3/4″ | 4 |
| Side wall cap plate | 2×4 | 16′ 0″ | 2 |
| Door header (2×8 doubled + 1/2 ply) | 2×8 | 6′ 3″ | 2 |
| Door trimmer | 2×4 | 6′ 4 1/2″ | 2 |
| Door cripple | 2×4 | 6 1/4″ | 5 |
| Window header (2×6 doubled + 1/2 ply) | 2×6 | 3′ 3″ | 4 |
| Window trimmer | 2×4 | 6′ 6″ | 4 |
| Center gable stud (under the ridge) | 2×4 | 3′ 8 3/4″ | 2 |
| Gable end studs | 2×4 | 1′ 0 3/4″, 1′ 8 3/4″, 2′ 4 3/4″, 3′ 0 3/4″ and 3′ 8 3/4″ | 4 each |
| Gable corner nailer (flat on the cap plate under each end rafter) | 2×4 | 8 5/8″ | 4 |
| Gable vent sill and header (flat) | 2×4 | 2′ 6 1/2″ | 4 |
| Gable vent side stud | 2×4 | 2′ 0″ | 4 |
Rafters. The 10′ 2 11/16″ figure is the board each rafter needs, measured long point to long point from the ridge plumb cut to the tail plumb cut, including the 12 in eave overhang; the top edge itself measures 10′ 0″. Each of the 42 rafters and fly rafters comes out of one 12 ft 2×6 with about 1′ 9 in left over, too short for another rafter, so a mistake cannot be recut from the same board.
Mark the plumb cuts with a speed square pivoted to 6 on the common scale (26.6 degrees). On a 2×6 the birdsmouth gets a level seat 3 1/2 in long, the full width of the wall plate, and a plumb heel 1 3/4 in high, about 28 percent of the rafter’s depth and inside the one-third limit. Cut one pattern rafter, test it at both ends and the middle of the 24 ft run, then trace the other 37. The 4 fly rafters hang off the lookout blocks and the ridge extension, so they get the ridge plumb cut but no birdsmouth.
Ridge. The ridge is a 2×8 because a 2×6 rafter’s plumb cut at 6/12 is about 6 1/8 in tall, and the ridge must be at least that deep. It runs 24′ 8″, 4 in past each gable wall to carry the fly rafters, in two pieces: 11′ 0″ from a 12 ft 2×8 and 13′ 8″ from a 14 ft 2×8. The joint is centered on the rafter pair 10′ 8″ from the left corner, and the list buys a temporary 2×4 post, 11′ 7 1/4″ from the deck to the underside of the ridge, to stand under the joint until the pairs on either side are nailed.
How the 24 ft runs are spliced. Every 24 ft member is two boards, and the plan places each joint so neighbors never line up:
| Member | Pieces | Where the joint lands |
|---|---|---|
| Skids | 8 ft + 16 ft | Counting from the front, skids 1, 3 and 5 run 8′ 0″ + 16′ 0″ from the left end and skids 2 and 4 run 16′ 0″ + 8′ 0″, each joint under a joist and scabbed both sides |
| Rim joists | 11′ 11 1/4″ + 12′ 0 3/4″ | 11′ 11 1/4″ from the left end, on the seam of a layout joist and the extra second joist |
| Front wall plates | 15′ 11 1/4″ + 8′ 0 3/4″ | 15′ 11 1/4″ from the left corner, where the wall splits into two sections |
| Front cap plate | 7′ 8 1/2″ + 15′ 8 1/2″ | 8′ 0″ from the left corner, 7′ 11 1/4″ from the section joint below |
| Back wall plates | 12′ 0 3/4″ + 11′ 11 1/4″ | 12′ 0 3/4″ from the right corner, where the wall splits into two sections |
| Back cap plate | 7′ 8 1/2″ + 15′ 8 1/2″ | 8′ 0″ from the right corner, 4′ 0 3/4″ from the section joint below |
| Ridge | 11′ 0″ + 13′ 8″ | Centered on the rafter pair 10′ 8″ from the left corner, with a temporary post |
| Eave fascia | 11′ 0″ + 13′ 8″ | Centered on a rafter tail |
The skid joints sit 8 ft apart on neighboring skids and well clear of the rim joints. Tamp the gravel under each joint in thin layers until a boot heel leaves no print.
Walls in sections. The front and back walls are framed and raised in two sections each, with their own plates, so two people can lift every piece. Each back wall section weighs about 140 lb and each side wall about 200 lb as a bare frame, and the front wall’s two sections take two people each. The second top plate goes on once all four walls stand and bridges each section joint.
Headers. The 72 in door opening gets a doubled 2×8 header with a 1/2 in plywood filler, on trimmers cut to 6′ 4 1/2″, with five 6 1/4″ cripples above it. The bottom plate is cut out of the doorway after the walls are up, so the door leaves swing over the floor. Each window gets a doubled 2×6 header on 6′ 6″ trimmers, two 6 1/2″ cripples above, a 3′ 0″ sill and two 3′ 4 1/2″ cripples below. Both windows sit at the front end of the side walls with 42 in sills.
Gable studs. Each 16 ft gable has one 3′ 8 3/4″ center stud plus ten end studs in five lengths, from 1′ 0 3/4″ to 3′ 8 3/4″. At 6/12 each stud 16 in further from the corner is 8 in taller, so the five lengths step 8 in apart. Measure each one off your actual end rafter before cutting. A flat 8 5/8″ nailer sits on each cap plate under the end rafters, and the 14 x 24 in louvered vent in each gable is framed with a flat 2′ 6 1/2″ sill and header and two 2′ 0″ side studs in a bay beside the center stud.
Siding at the rim. On the 24 ft walls the T1-11 laps the rim joist by 2 15/16 in and is nailed into it. On the 16 ft side walls it laps only 3/4 in, too little to nail into the rim, so it is nailed into the bottom plate instead, 2 1/4 in up from its bottom edge. Cover that rim with Z-flashing or a 1x skirt board, or at least keep it primed and painted.
Gable vs lean-to: what changes
We also ran the same 16×24 footprint as a lean-to (single-slope) roof at 3/12. This is a reference build, not a plan we sell, and to keep the tall front wall inside one 4×10 sheet of siding, the back wall drops to 71 in on a shed this deep. That run has a 60 in door in the high front wall and one window in the back wall, and it passed all 64 of its audit checks. The skids, joists and decking stay the same; the studs, rafters and siding change.
| Item | Gable plan (6/12) | Reference lean-to (3/12) |
|---|---|---|
| Rafters | 38 2×6 at 10′ 2 11/16″ + 4 fly | 19 2×10 at 18′ 0 3/4″ + 2 fly |
| Rafter stock | 2×6 x 12 ft | 2×10 x 20 ft |
| Ridge board | 2×8, 24′ 8″ from two boards | None |
| Wall studs | 7′ 6″ on all four walls | 9′ 5 5/8″ front, 5′ 6 1/2″ back, 13 stepped studs per side |
| 2×4 framing boards bought | 126 | 76 |
| 2×10 boards bought | 0 | 25 |
| T1-11 sheets | 25, all 4×8 | 22: eight 4×10, two 4×9, twelve 4×8 |
| Roof OSB sheets | 17 | 15 |
| Shingle bundles | 19 | 16 |
| Felt | 2 rolls | 3 rolls, laid double below 4/12 |
| Windows | 2 | 1 |
| Framing nails | 54 lb | 34 lb |
| Extra hardware | 4 Z-flashing, 2 gable vents, ridge post | 4 twist straps at the wall corners |
| Floor | 5 skids, 20 joists, 12 sheets | 5 skids, 20 joists, 12 sheets |
A single-slope roof spans the full 16 ft in one rafter, so the lean-to needs 2×10 rafters 18′ 0 3/4″ long, cut from 20 ft boards. Not every yard keeps 20 ft 2x10s on the shelf, so ask before you plan around them. Each side wall has 13 studs stepping from 5′ 8 3/8″ to 9′ 6 1/4″ under a 15′ 10 3/4″ sloped top plate, and the rake fascia is one 20 ft 1×8 per side.
At 3/12, read the minimum slope on the shingle wrapper and follow the maker’s low-slope instructions. For more on single-slope builds, see how to build a lean-to shed, all lean-to shed plans and our gable vs lean-to vs hip roof comparison.
Where the waste goes
- Wall studs: 90 in studs leave about 6 in from each 8 ft board.
- Rafters: buy one or two spare 2×6 x 12 ft if you are new to rafter cuts, since the 1′ 9 in left from each board is too short for a second try.
- No trim room at 16 ft: the seventeen 16′ 0″ rafter ties and the two 16′ 0″ side cap plates use whole 16 ft boards, and so do the skids (8 + 16 ft). Measure these boards at the yard and check that the factory ends are square.
- Floor joists: 15′ 9″ from a 16 ft board leaves 3 in for squaring the ends.
- Plates and rims: the long front plate pieces and the short back plate and rim pieces leave about 3/4 in each, so square the factory ends first; the short front plate pieces and the long back plate and rim pieces leave about 1′ 11 1/4″.
- Caps, ridge and fascia: each cap plate piece leaves 3 1/2 in, and the ridge and each eave fascia run leave 12 in from the 12 ft board and 4 in from the 14 ft board.
- Scabs and stakes: five 3′ 0″ scabs per 16 ft treated 2×4 leave about 10 in each. The 12 brace stakes and 16 deck cleats have their own 2×4 x 8 ft on the list, so you do not have to hunt for offcuts.
- Sheets: 20 wall sheets cover exactly 640 sq ft, so a damaged sheet means a trip back to the yard. Many tongue and groove panels cover about 47 1/2 in net, so four rows land 15′ 10″ across the 16′ 0″ frame. The plan closes the last 2 in with the three 1×4 filler strips ripped to 2 in along the back rim, and the back wall’s bottom plate covers them.
- No spares: the counts include nothing for rejects. The plan says to add 2 or 3 spare studs for bad boards; sight down each board’s edge at the yard and skip bowed or twisted ones.
Tools and crew for a 16×24 build
- Circular saw, speed square and framing square for 65 stud cuts and 42 rafters
- A miter saw with a stop block for the 24 lookout blocks (2 1/2 in) and 36 frieze blocks: cut each from a long board, never holding a short piece by hand
- Framing hammer or framing nailer, and a drill/driver for the screws
- 4 ft level, a 30 ft or longer tape for checking that the floor diagonals match (each is 28′ 10 1/8″), and a string line for the 24 ft rims and plates
- A hand tamper for the 7.7 cu yd of gravel, laid in two layers as the plan says, or a rented plate compactor to save your back
- Delivery or a trailer for 16 ft boards, 4×8 sheets and 7.7 cu yd of stone
- A crew of two: the plan raises every wall section with two people, and a helper sets the ridge and lifts sheets onto the roof
Common mistakes
- Using 2×4 rafters because a smaller shed did. Our 10 and 12 ft deep plans use 2×4 rafters. At this 8 ft run the plan uses 2×6 rafters with a 2×8 ridge, and the 2×6 also gets the full 3 1/2 in seat on the plate. Do not swap them back to save money.
- Mixing up 16×24 and 24×16. In this list the ridge runs along the 24 ft side. Turn it the other way and each rafter’s run grows from 96 in to 144 in, and the ridge, gables and every rafter length change.
- Moving the splices. The joint positions above keep plate, cap, skid and rim joints apart. If they all land at one spot, the floor and walls get a hinge line. Do not plan to drag a shed on spliced skids to a new spot later.
- Lifting the floor frame. Nailed, it weighs about 800 lb and racks out of square if you lift it, so the plan builds it in place on top of the skids.
- Forgetting the door sheets. The siding cut out of the doorway is too short for a door leaf, so each leaf needs its own new T1-11 sheet.
- Skipping rafter ties. A ridge board is not a beam. The 17 rafter ties at the plates stop the 24 ft walls from spreading; the 9 collar ties higher up do not replace them.
- Too few skids. Five under a 16 ft floor land 3′ 11 1/8″ on center; four would leave each joist a much longer span.
- Swapping materials without recounting. This list is for 3-tab shingles and T1-11. Architectural shingles, metal roofing or lap siding cover differently, so recount from the coverage printed on the bundle or the maker’s install guide.
- Untreated wood near the ground. Skids, rims, joists, scabs and the ramp are pressure treated; plain framing lumber there rots. Use ground-contact rated wood for the skids and the pad frame, and hot-dip galvanized nails and treated-lumber rated screws in treated wood. The USDA Wood Handbook covers why wet, untreated wood decays.
A 384 sq ft shed that stands 13′ 1 1/16″ tall is large enough that permit, setback and tie-down rules matter, and they vary by town, so check your local permit office before you order. The list includes 10 screw-in ground anchors with straps; ask the same office what your area expects. Our shed permit checklist lists what to ask.
For how to read any list like this one, see our shed material list guide. For a rough budget, see how much it costs to build a shed, then price this list at two yards. For other sizes, try the shed material calculator.
Get the full plan
The 16×24 gable shed plan is a 71-page 3DSHEDPLANS PDF for this footprint with 27 sections, 19 of them step-by-step build sections, the cut list, the cutting plan and the same material list shown here. It is drawn with the 72 in double door, two 36 x 36 in windows and a wheel-in ramp, and it estimates about 154 hours for two people. The 16×24 hip roof shed plan has the same floor under a four-sided roof. For a little less room, the 16×20 gable shed plan shares the 16 ft depth and the 14×24 gable shed plan shares the 24 ft length.
Compare the 12×24 shed material list to see what 4 ft less depth saves.
Want to see the format first? Download the free 16×24 gable shed plan preview PDF. Need more or less room? Compare all gable shed plans and hip roof shed plans, or browse every size on the shed plans page.
Frequently asked questions
What is on a 16×24 shed material list?
For the 3DSHEDPLANS 16×24 gable shed with a 6/12 roof, the plan PDF lists 126 framing 2x4s, 50 2x6s, 3 2x8s, 28 treated 2x6s, 10 treated 4x4s, 12 sheets of 3/4 in plywood, 17 of OSB, 25 of T1-11, 3 of 1/2 in plywood and 19 shingle bundles, plus trim, the ramp, pad frame and hardware.
Is there a free 16×24 shed plan with a material list?
This page is a free 16×24 material list with cut lengths, taken from the 3DSHEDPLANS 16×24 gable shed plan PDF. The paid 71-page PDF adds 27 sections, 19 of them step-by-step build sections, and its free preview PDF shows the format before you buy.
How many 2x4s do I need for a 16×24 shed?
126 for the framing: 86 at 8 ft, 4 at 10 ft, 3 at 12 ft, 6 at 14 ft and 27 at 16 ft. Add 23 at 12 ft for temporary braces and a ridge post, and 7 at 8 ft for stakes and cleats, so 156 in all.
How many sheets of plywood, OSB and siding does a 16×24 shed need?
12 sheets of 3/4 in tongue and groove plywood for the floor, 17 sheets of 7/16 in OSB for the roof, 25 sheets of 5/8 in T1-11 for the walls, gables and door leaves, and 3 sheets of 1/2 in plywood for the soffit and header fillers.
How many bundles of shingles for a 16×24 shed roof?
19 bundles of 3-tab shingles for the 6/12 gable roof, whose footprint to the fascia is 24' 9 1/2 in x 18' 1 1/2 in with a 12 in eave and 4 in rake overhang. The count includes the starter course and ridge cap.
Shed building guides
- 8×8 Lean-To Shed Material List: Lumber, Sheets, Hardware
- 8×8 Hip Roof Shed Material List: Lumber, Sheets, Hardware
- 8×20 Lean-To Shed Material List: Lumber, Sheets, Hardware
- 8×20 Hip Roof Shed Material List: Lumber, Sheets, Hardware
- 8×16 Gable Shed Material List: Lumber, Sheets, Hardware
- 8×14 Lean-To Shed Material List: Lumber, Sheets, Hardware