12x12 Pergola Material List: Posts, Beams, Concrete

12x12 material list: pergola, posts, beams, concrete

A 12×12 pergola material list for this freestanding 12′ 0″ x 12′ 0″ post center pergola starts with 4 pressure-treated 6×6 posts, 4 2×10 beam boards, 12 2×8 rafters and 13 2×4 purlins, set on concrete footings with 40 bags of 60 lb mix.

Every row below comes from the shopping list and cut list of the 3DSHEDPLANS 12×12 pergola plan. Every board is a standard US lumber size in a stock length a lumber yard carries.

What this 12×12 pergola list assumes

  • Footprint: posts 12′ 0″ by 12′ 0″ apart, a top of 13′ 11″ by 13′ 11″ with the overhangs, 144 sq ft under the frame.
  • Height: 8′ 0″ clear under the beams, 9′ 6 1/2″ to the top of the purlins.
  • Posts: 4 pressure-treated 6×6 posts, 3′ 3″ in the ground in 16 in holes 3′ 9″ deep, on a 6 in gravel bed with a concrete collar.
  • Beams: doubled 2×10 boards notched 3 in into the post tops and through bolted with 8 carriage bolts.
  • Roof frame: 12 2×8 rafters 15 1/2 in on center and 13 2×4 purlins 12 in on center, held with 24 hurricane ties, and 8 4×4 knee braces.
  • Shade: an open top: about one fifth shade at noon; add shade cloth for more.

Lumber sizes are nominal. A 6×6 measures about 5 1/2 x 5 1/2 in and a 2×8 about 1 1/2 x 7 1/4 in, as the American Wood Council explains.

In short: what you buy

  • Posts: 4 treated 6×6 posts, 12 ft, rated UC4B for ground contact
  • Beams, rafters and purlins: 4 treated 2×10 boards at 14 ft, 13 treated 2×8 boards at 14 ft and 14 treated 2×4 boards at 14 ft, with one spare rafter and one spare purlin in those counts
  • Knee braces: 3 treated 4×4 boards, one of them a spare
  • Footings: 40 bags of 60 lb concrete mix and 7 bags of 3/4 in gravel
  • Hardware: 8 carriage bolts, 24 hurricane ties, structural screws, nails and end-grain sealer
  • Temporary bracing and access: 12 2×4 boards for braces and batter boards, 28 stakes, a rope, plywood for the ladder feet and the scaffold track, and shims

The 12×12 pergola material list by stage

The plan’s shopping list has 29 items in build order. The notes say what each item is for and when a longer board is the safer buy.

Posts

Item Qty Note
Pressure-treated 6×6 x 12 ft 4 The four posts: 12 ft, or 14 ft for a low corner or a deep frost line. Rated UC4B, which often has to be ordered ahead
End-grain sealer (copper naphthenate, 1 qt) 1

Footings

Item Qty Note
Concrete mix (60 lb bag) 40
Gravel (1/2 cu ft bag, 3/4 in stone) 7

Temporary bracing

Item Qty Note
2×4 x 8 ft 12 Batter board crosspiece, Temporary post brace
Deck screws (3 in, rated for treated lumber, 1 lb box) 2
Mason’s line, plumb bob, marking paint (1 each) 1
Wood stake (2×2, 24 in) 28 3 per batter board corner, and 2 per temporary brace so soft ground is covered

Beams

Item Qty Note
Pressure-treated 2×10 x 14 ft 4 Beam board
Carriage bolt, washer and nut (1/2 x 7 in, hot-dip galvanized) 8
Nails (2 1/2 in (8d) ring shank, hot-dip galvanized, 1 lb box) 3 Beams and doubled rafters
Structural screw (1/4 x 6 in, self-drilling, rated for treated lumber, box of 50) 4 Knee braces and purlins

Rafters

Item Qty Note
Pressure-treated 2×8 x 14 ft 12 Post-line rafter, Rafter
Pressure-treated 2×8 x 14 ft 1 1 spare, in case of a miscut
Hurricane tie (H2.5AZ type, ZMAX) 24
Connector nails (1 1/2 in x 0.131 in, hot-dip galvanized, 1 lb box) 3
Structural screw (1/4 x 5 in, rated for treated lumber, box of 50) 1

Knee braces

Item Qty Note
Pressure-treated 4×4 x 12 ft 2 Knee brace
Pressure-treated 4×4 x 4 ft (or 8 ft) 1 1 spare, in case of a miscut

Purlins

Item Qty Note
Pressure-treated 2×4 x 14 ft 13 Purlin
Pressure-treated 2×4 x 14 ft 1 1 spare, in case of a miscut

Lifting, access and rentals

Item Qty Note
Rope (1/2 in thick, 30 ft) 1 The brake on a rafter’s tail while it goes up
Plywood panel (3/4 in, 2 x 4 ft) 1 Eight 12 in squares under the ladder feet on lawn
Plywood or OSB sheet (1/2 in or thicker, 4 x 8 ft) 2 The scaffold’s track on lawn (four planks also work)
Composite shims (pack of 12) 1 A low beam shoulder or post top
Rent: narrow rolling scaffold (baker type, about 2 1/2 ft wide and 6 ft long) with a guard rail set and locking casters, platform at 5 ft 1 Raising the rafters, Rafters and Purlins: about 3 working days (a weekly rate is often cheaper)
Rent: two-person auger with a 16 in bit 1 Layout and holes: 1 day
Rent: drum concrete mixer 1 Set the posts in concrete: 1 day

Finish

Item Qty Note
Exterior stain (1 gal) 4

Cut list: every part

Part Board Boards Pieces per board
Post PT 6×6 x 12 ft 4 1 x 11′ 10 3/4″
Beam board PT 2×10 x 14 ft 4 1 x 13′ 11″
Post-line rafter PT 2×8 x 14 ft 4 1 x 13′ 11″
Rafter PT 2×8 x 14 ft 8 1 x 13′ 11″
Purlin PT 2×4 x 14 ft 13 1 x 13′ 11″
Knee brace PT 4×4 x 12 ft 2 4 x 2′ 9 15/16″
Temporary post brace 2×4 x 8 ft 8 1 x 7′ 10″
Batter board crosspiece 2×4 x 8 ft 4 2 x 3′ 11″

Footings and concrete

Each post sits on a 6 in gravel bed in a 16 in hole 3′ 9″ deep. The plan’s 40 bags of 60 lb concrete mix are 9 per hole, plus spares; at a 48 in hole depth for a deep frost line it is 11 per hole. The 7 bags of 3/4 in gravel go under the posts. Frost depth and footing rules vary by area, so check your local permit office for the depth your area asks for before you dig.

Why pressure-treated, and what to check at the yard

Every part of the frame is outdoors and the posts are in the ground, so the plan uses pressure-treated lumber throughout. The posts must be rated UC4B for ground contact; the beams and rafters above can be UC3B or UC4A. The USDA Wood Handbook explains why wood that stays wet decays and how preservative treatment slows it.

  • Ground-contact posts. Check the end tag on each 6×6. Many stores stock UC4A; UC4B often has to be ordered ahead.
  • Straight beam stock. Sight down every 2×10 and 2×8 and leave crowned or twisted boards in the pile. A straight beam makes the rafters easy to line up.
  • Seal the cuts. Treatment does not reach the center of a post. Brush end-grain sealer on every cut end, above all the post bottoms and the notches.
  • Coated fasteners. Treated lumber corrodes plain steel. Use hot-dip galvanized or stainless bolts, ties and screws.

Tools and time

The plan’s build takes about 49 hours: digging and setting posts, notching and bolting beams, then rafters, braces and purlins. You need a circular saw, a handsaw or reciprocating saw, a chisel and mallet for the notches, a drill driver, a post hole digger or auger, a 4 ft level, string and stakes, and two sturdy ladders. The posts weigh about 140 lb each, so plan on a helper for every lift.

Before you order

Many towns ask for a permit for a freestanding pergola, and setbacks from property lines are common. Check your local permit office and HOA before you buy lumber, and call 811 before you dig.

To compare sizes, see the 10×10 pergola plan, 10×12 pergola plan. The pergola plans page lists every pergola with its size.

Get the full plan

The 12×12 pergola plan is a 3DSHEDPLANS PDF with this material list, the cut list and step-by-step 3D drawings from the layout strings to the last purlin. Download the free 12×12 pergola preview PDF to see the format before you buy. Looking for a garden building? See all shop plans.

Frequently asked questions

How much lumber do I need for a 12×12 pergola?

4 pressure-treated 6×6 posts, 4 2×10 beam boards, 12 2×8 rafters, 13 2×4 purlins and 4×4 stock for 8 knee braces, plus 2x4s for temporary braces and batter boards.

How many bags of concrete for a 12×12 pergola?

40 bags of 60 lb concrete mix for 4 footings, about 9 per 16 in hole 3' 9" deep, plus 7 bags of gravel under the posts. A deeper frost line takes more; check your local permit office.

What size beams and rafters does a 12×12 pergola use?

Doubled 2×10 beams notched into the 6×6 posts and 2×8 rafters 15 1/2 in on center, with 2×4 purlins 12 in on center across the top.

How tall is this 12×12 pergola?

8' 0" clear under the beams and 9' 6 1/2" to the top of the purlins, with the posts 3' 3" in the ground.

Are free 12×12 pergola plans with a material list available?

This page is a free material list for the pergola. The free preview PDF shows the plan's drawings, and the paid plan PDF has the same list with the cut list and every step drawn.

Get 3 shed building tips by email

Short emails over 5 days: site prep, framing mistakes to avoid, and how the full plan saves lumber. Unsubscribe anytime.

Shed building guides

Plans for this guide

Step-by-step 3D plans with a complete materials list.

See all plans