Walk-in catio · 48 sq ft
6x8 Walk-In Catio Plan
Build this 6x8 walk-in catio yourself. Every board, cut and step, drawn in 3D across 30 pages.
- 30-day money-back guarantee
- PDF by email right after checkout
- Visa, Mastercard, Amex, PayPal
- Full material and shopping list
- Cut list with every length
- Step-by-step 3D views, 30 pages
- Phone, tablet, PC and Mac

The 3DSHEDPLANS™ 6x8 walk-in catio plan is a 30-page PDF for a freestanding cat room you can walk into, 8' 0" by 6' 0" on the ground, with hardware cloth on every wall and a metal gable roof, for up to 3 cats. It has a shopping list, a cut list and 12 step-by-step sections.
Get the full plan PDF for $19.99 or download the free preview
What builders say
A project for me and my son. The plan arrived in my email almost instantly, and everything we needed was included.
We aren't DIY-savvy and needed something simple. The plan was extremely well laid out and easy to follow.
A year ago I had only built flat-pack furniture. The plans are simple to follow, and you don't need years of experience.
6×8 catio plans: what you get
These 6×8 catio plans are for a walk-in catio that stands on its own in the yard: four 2×4 stud walls 7′ 0″ tall on a treated 4×4 sill frame, 1/2 in hardware cloth on every side, a low gable roof of ribbed metal, a full-height screen door that closes and latches by itself, and three shelves with a ramp inside. Your cats get fresh air, sun and things to watch, and the birds in your yard stay safe.
The PDF has 30 pages: a shopping list by building stage, a cut list with every length and a cutting plan for each board, and 12 step-by-step sections with measured drawings and a picture of the catio at the end of each step, from the stone strip under the sills to the last cleat on the ramp.
Every part in the lists is drawn on its step page, and the shopping list, the cut list and the drawings were checked against each other part for part. The 6×8 walk-in catio plan sells for $19.99 as an instant PDF download that works on a phone, a tablet or a printed copy.
How many cats fit in a 6×8 catio?
The plan is laid out for up to 3 cats at about 16 sq ft of floor each, on a 48 sq ft footprint. The headroom is 6′ 9″ under the top plates, so you walk in standing up to clean, fill the water bowl or sit with your cats.
Cats use height more than floor. The three shelf planks at three heights and the ramp give them places to climb, sit and look out, which counts as much as the floor area. A shy cat or a cat that does not get along with the others needs more room, so count your own cats against those numbers.
6×8 walk-in catio specs
Every number below comes from the plan’s own specs page. Lumber sizes are nominal: a 2×4 is really 1 1/2 in by 3 1/2 in, and a 4×4 is 3 1/2 in square.
| Spec | Value |
|---|---|
| Footprint | 8′ 0″ x 6′ 0″ (sill to sill) |
| Roof | 9′ 0″ x 7′ 4″, 4:12 gable, 8″ eaves, ribbed metal |
| Height | 7′ 0″ to the wall top, about 8′ 5″ to the ridge, from the top of the sill |
| Headroom | 6′ 9″ clear under the top plates |
| Cats | up to 3 cats, about 16 sq ft each |
| Door | 2′ 6″ x 6′ 7″ leaf, self-closing hinges and a self-latching latch |
| Shelves | three 2×12 planks, tops at 1′ 7 1/2″, 3′ 1 1/2″, 4′ 7 1/2″ above the sill, and a 2×8 ramp at 33 degrees |
| Frame | treated 4×4 sills, 2×4 studs at 32 in or less on center, double top plates, a rafter pair on every stud |
| Skin | 1/2 in 19 gauge hardware cloth on every wall and the door, plywood gables, a 2′ 0″ cloth apron on the ground |
| Foundation | a crushed stone strip under the sills and four auger ground anchors |
| The PDF | 30 pages, 12 step-by-step sections |
The sill frame and ground anchors
The catio needs no slab and no post holes. You dig a shallow trench under the four sill lines, fill it with crushed stone and level it, then lay a frame of treated 4×4 sills on the stone. The long sills run the full length and the cross sills fit between them, screwed with structural screws and a framing angle in every corner.
Four auger ground anchors turn into the soil beside the corners, and their straps wrap over the sill, so the catio stays put in a storm. The floor inside is the ground itself: grass, pea gravel, wood chips or pavers, your choice. The sills are bought rated for ground contact because they lie on the stone.
Walls built flat and raised
Each wall is framed flat on the ground: a treated bottom plate, 2×4 studs at 32 in or less on center, a top plate, flat rails between the studs for the hardware cloth and the shelves, and a 45 degree knee brace in each top corner to keep the wall square. The bottom plate runs on across the door opening and stays as a threshold, so there is no gap under the door.
Two people stand the walls up in order, back wall first, each one braced plumb to a stake until the corners are screwed. Then the upper top plates go on, lapping over the corners, and a framing angle ties the foot and the head of every stud a rafter stands on (24 angles in all).
The low gable roof
You cut one pattern rafter, check it on the wall and trace the rest. Two temporary props hold the 2×6 ridge board while the rafter pairs go up, each pair right over a front and a back stud, with a hurricane tie at every seat (8 ties in all). Rafter ties cross the inside pairs at the wall top.
Flat 2×4 purlins carry 6 ribbed metal panels, with foam closures and a ridge cap at the top. Eave blocks close the gap between the rafters on the wall, so a cat cannot slip out under the roof, and plywood panels close the two gables. The roof is 9′ 0″ by 7′ 4″, with 8″ eaves that keep rain off the walls and give the cats some shade.
Hardware cloth that stays on
The walls are skinned in 1/2 in, 19 gauge hardware cloth, not chicken wire, which a cat can push through and a raccoon can tear. It goes on in two level bands from stock rolls that lap on the mid rail, so there are no upright seams and no lengthwise cuts. Every piece is cut straight across the roll, stapled, then held with screws and fender washers on every stud and rail.
A 1×4 batten covers every cloth edge, so there are no bare wire ends inside or out. A strip of cloth runs up the face of the sill and out flat on the ground all around as an apron, which stops your cats from digging out and other animals from digging in. The cloth plan in the PDF shows which roll each piece comes from.
A door that closes and latches by itself
The door leaf is 2′ 6″ x 6′ 7″, a 2×4 frame with a diagonal brace and the same two cloth bands as the walls. It hangs on a pair of self-closing gate hinges and a T-hinge, opens outward, and shuts against stops on the frame, so it sits flush when closed.
A self-latching gate latch catches it every time, and a carabiner through the latch locks it when nobody is inside. A release cord through a screw eye lets you open it from inside. The plan has you check that the door shuts and latches on its own from any angle before the cats move in.
Shelves and a cleated ramp
Three 2×12 shelf planks sit at three heights, their tops 1′ 7 1/2″, 3′ 1 1/2″ and 4′ 7 1/2″ above the sill. They rest on rails that are already in the walls, so there are no brackets to buy and no angled cuts. The planks go in before the cloth, while the wall bays are still open.
A 2×8 ramp with 1×2 cleats runs up to the lowest shelf at 33 degrees, along the back wall, from a small foot on a paver set in the ground. The shelves and the ramp are plain lumber with a water-based clear sealer, because the cats sit and walk on them.
Made for cats: safe materials and no gaps
Every gap a cat can reach is under 1 in, from the eave blocks at the wall top to the apron at the ground. The cloth edges sit outside under battens, and the roofing screws are short enough that no tips come through inside.
The frame gets a water-based, low-VOC exterior paint or stain, because cats rub on it and lick it, and the plan tells you to let it cure before the cats go in. Treated lumber stays at the bottom, at the sills, plates and bottom battens; nothing the cats sit on or climb is treated.
Crew, time and working safely
Plan on two weekends for two people. One person can do most steps, but raising the walls and setting the ridge board need the second person. The PDF has a time table for each stage.
The ridge is about 8′ 5″ above the sill. Work from a 6 ft step ladder on firm, level ground and never stand on a top plate, a purlin or the metal. Wear a dust mask when you cut treated lumber, gloves for the hardware cloth and the metal panels, and file any sharp corners.
Materials list for the 6×8 walk-in catio
The plan’s shopping list has 47 items, grouped by building stage so you can buy in stages, plus the hinges, the latch, the paint and the fasteners. In short, this is what you buy:
- Treated lumber: 10 treated boards for the sills, bottom plates and bottom battens
- Framing lumber: 50 boards of 2×2, 2×3, 2×4 and 2×6 for the walls, roof frame and door
- Shelves and trim: 29 boards for the shelf planks, the ramp, the battens and the trim
- Hardware cloth: 5 rolls of 1/2 in mesh for the walls, the door and the apron
- Roofing: 3 ribbed metal panels (8 ft), the ridge cap, rake trim and foam closures
- Base: 19 bags of crushed stone and 4 ground anchors
The full list of all 47 items, with the cut list, is in the plan PDF.
The plan does not list prices because lumber and metal costs change every week. Take the list to the pro desk of your lumber yard or home center for a quote.
Tools you need
These are common framing tools; nothing needs to be rented. The PDF lists every tool and the fastener for every joint.
- Circular saw, and a miter saw if you have one
- Drill/driver and an impact driver for the structural screws
- Staple gun for the hardware cloth
- Speed square, 4 ft level, tape measure and string line
- Tin snips for the hardware cloth and the metal panels
- Shovel, rake and a hand tamper for the stone strip
- Two 6 ft step ladders, sawhorses and clamps
- Safety glasses, ear protection, gloves and a dust mask
Use galvanized connectors and exterior screws rated for treated lumber, and wear gloves when you handle the cut edges of hardware cloth and metal.
How to build the 6×8 walk-in catio, step by step
The building itself goes in 10 stages, in the same order as the checklist at the back of the PDF, each with numbered sub-steps, measured drawings and a picture with the new parts in orange. This is the order the plan follows:
Step 1: Site and sill frame
Mark the footprint, lay the stone strip, screw the treated sills together and turn in the ground anchors.
Step 2: Build the four walls
Frame each wall flat with its rails and knee braces, square by the diagonals.
Step 3: Raise the walls
Stand the walls up in order, brace them, screw the corners and lay the upper top plates.
Step 4: Rafters and ridge
Cut the pattern rafter, prop the ridge board, set the rafter pairs and the rafter ties.
Step 5: Purlins and eave blocks
Close the eaves with blocks, lay the purlins and take the props out.
Step 6: Gables, fascia and metal roof
Fit the plywood gables, the fascia and rake boards, then the metal and the ridge cap.
Step 7: Paint, hardware cloth and apron
Paint the frame, slide in the shelf planks, hang the two cloth bands, lay the apron and screw on the battens.
Step 8: Door
Build the door, paint it, cover it in cloth, fit the stops and hang it on the self-closing hinges.
Step 9: Shelves and ramp
Seal the ramp, fix its cleats and set it on its foot and the low shelf.
Step 10: Finish and care
Walk around once more and check the door, the cloth edges and every gap.
The skill level is beginner to intermediate with a helper: measuring, square and angled cuts and checking level and plumb. The glossary at the back explains every carpentry word the plan uses.
Where to put a catio
- Ground that drains. Pick a level spot that dries out after rain, so the stone strip and the sills stay firm.
- Shade. Part shade over the day keeps the catio cool in summer, and the metal roof gives some shade too.
- Working room. Leave 3 ft all around for the ladders, the cloth and the apron. The door swings out at the front.
- Next to the house. If the catio will join a window or a cat door, put that end against the house. The plan shows how to frame a cat port in an end-wall bay.
- Rules and buried lines. Towns and HOAs set how far a structure must stand from the lot line. Check your local permit office, and call 811 before you dig or turn in the anchors.
What is in the free 6×8 walk-in catio plan preview?
Download the free 6×8 walk-in catio plan preview before you buy. It shows the catio from the front and the back, the build stages in order and real pages from the plan, so you can see how the drawings look and whether the size fits your yard.
| Item | Free preview | Full plan |
|---|---|---|
| Overview, views and build stages | Yes | Yes |
| Shopping list with quantities | No | Yes |
| Cut list for every part | No | Yes |
| Measurements in every step | Overall sizes | Every part |
| Step-by-step drawings | Preview pages | 30 pages, 12 sections |
| Joint close-ups and time table | No | Yes |
| Price | Free | $19.99 |
Not right for you? Email [email protected] within 30 days of your purchase for a full refund.
Before you build
Rules for backyard structures (setbacks, size limits, permits) vary by town and HOA, and so do the wind and snow a roof must carry. The hurricane ties, framing angles and ground anchors are design choices, not a certified rating. Check your local permit office before you buy lumber.
Once a year, check the apron, the latch, the hinge springs and the roof screws, and touch up the paint. More plans are on the all plans page.
Frequently asked questions
How many cats does the 6×8 catio hold?
It is laid out for up to 3 cats at about 16 sq ft each, with three shelves at three heights and a ramp, so the cats can use the height as well as the floor.
Do I need a concrete foundation?
No. The treated 4×4 sills lie on a crushed stone strip, and four auger ground anchors strap the catio down. Ask your local permit office whether your town wants a different base.
Can my cats get out through the mesh or under the walls?
The walls use 1/2 in hardware cloth with a batten over every edge, every gap a cat can reach is under 1 in, and a cloth apron on the ground stops digging.
Can I connect the catio to my house?
Yes. Put one end against the house, and the plan shows how to frame a cat port in an end-wall bay for a window box or a tunnel.
Do I need a permit for a 6×8 catio?
Rules for backyard structures vary by town and HOA. Check your local permit office before you build, and call 811 before you dig or turn in the ground anchors.
More about the 6×8 walk-in catio plan
Inside the 6×8 walk-in catio plan PDF
The 30-page PDF follows the build from start to finish, with 12 step-by-step sections. These are its parts in print order:
- How to use this plan: how to read the drawings, store and real lumber sizes, which parts are treated, a time table for two people and working safely.
- Overview and dimensions: views from the front and the back, the front and end elevations and the name of every part.
- Specs: footprint, roof, height, headroom, cats, door, shelves, frame, skin and foundation.
- Permits and siting: what to ask before you start (check your local permit office), drainage, shade, working room and a site plan.
- Shopping list by section: every item with its quantity and what it is used for, grouped by building stage.
- Cut list: every part with its lumber and exact length, and a cutting plan that shows the cuts on each board.
- Tools and fasteners: the tool list and a fastener schedule for every joint.
- Key joints up close: close-up pictures of the joints, from the sill corner to the top of the ramp.
- Working at height and temporary parts: where you stand for every task, every lift with its weight and crew, and the temporary braces and props.
- Site and sill frame: the footprint, the crushed stone strip, the treated 4×4 sills and the ground anchors.
- Build the four walls: each wall framed flat on the ground with its rails and knee braces.
- Raise the walls: the walls stood up in order, braced, screwed at the corners and capped with the upper top plates.
- Rafters and ridge: the pattern rafter, the ridge props, the ridge board and the rafter ties.
- Purlins and eave blocks: the eave blocks that close the gap at the wall top and the flat purlins.
- Gables, fascia and metal roof: the plywood gable panels, the fascia and rake boards, the ribbed metal and the ridge cap.
- Paint, hardware cloth and apron: paint, the shelf planks, the two cloth bands, the apron and the battens.
- Door: the door frame, its paint and cloth, the stops, the self-closing hinges and the latch.
- Shelves and ramp: where the shelves sit and the cleated ramp on its foot.
- Finish and care: the last walk around and what to check once a year.
Ready to build the 6×8 walk-in catio?
$19.99 for the full PDF: every step, cut and board. 30-day money-back guarantee.